Attachment L - Revised Design Revision 02.pdf
PDF 103 KB Posted
- Solicitation number
- N40085-20-R-0044
About this file
This document package includes a federal contract solicitation and related project files. The solicitation is for contract N40085-20-R-0044 to perform repair and construction work at Naval Station Norfolk in Chambers Field. The work includes repairing Runway 10-28 through asphalt and concrete maintenance, markings, rubber removal, and partial reconstruction. It also involves installing new Instrument Landing System equipment and supporting infrastructure from June through December 2020. Additional utility work, airfield signage upgrades, and site preparation are required. The project files provide design revisions and specification updates for the runway and ILS installation work. Revisions include adding notes about crushing removed concrete, requiring fiber splicing in manholes, and establishing landscape maintenance requirements.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWD Norfolk, Facilities Engineering and Acquisition Division Page 1 of 2
Design Revision 02 REV eProjects Work Order Number: 1607816 / 1614532
Construction Contract Number: N40085-20-R-0044
Building: Chambers Field @ Naval Station, Norfolk
Project Title: Repair LP Area Runway and ILS Installation Support
Date: April 17, 2020
Design Revision Purpose
1. Revisions in response to Contractor’s Pre-Proposal Inquires after March 31, 2020.
Drawing Revisions
REPAIR LP RUNWAY DRAWINGS
The following drawings are revised as of April 14, 2020 and accompany this Design Revision:
On NAVFAC Drawing No. 12,810,436 (G-001)
GENERAL ABBREVIATIONS: Add “VDOT – VIRGINIA DEPARTMENT OF TRANSPORTATION” to the abbreviations list.
On NAVFAC Drawing No. 12,810,441 (G-401)
GENERAL SHEET NOTES: Add note #9 to read “CRUSH CONCRETE THAT HAS BEEN REMOVED FROM AIRFIELD (E.G REMOVED CONCRETE PAVEMENT, REMOVED CONCRETE STRUCUTRES, ETC.) SO THAT THE GRADATION CONFORMS TO VDOT 21A STONE. REMOVE AND PROPERLY DISPOSE OF FOREIGN MATERIALS SUCH AS TRASH, WOOD, PAPER, AND PLASTIC FROM CONCRETE PRIOR TO CRUSHING. REFER TO THE VDOT ROAD AND BRIDGE SPECIFICATIONS, LATEST EDITION, FOR GRADATION DETAILS. CRUSHED MATERIAL IS INTENDED TO
SUPPLY SUBBASE MIXES FOR FUTURE GOVERNMENT PROJECTS.
ILS INSTALLATION SUPPORT
The following drawings are revised as of April 14, 2020 and accompany this Design Revision:
On NAVFAC Drawing No. 12,811,477 (ES109)
GENERAL SHEET NOTES: Add note 3 to read as follows: “THE CONTRACTOR SHALL SPLICE FIBER IN ALL
MANHOLES/HANDHOLES.”
On NAVFAC Drawing Nos. 12,811,478 – 12,811,494 (ES110 – ES126)
GENERAL SHEET NOTES: Add note 2 to read as follows: “THE CONTRACTOR SHALL SPLICE FIBER IN ALL
MANHOLES/HANDHOLES.”
PWD Norfolk, Facilities Engineering and Acquisition Division Page 2 of 2
On NAVFAC Drawing No. 12,811,495 (ES127)
GENERAL SHEET NOTES: Add note 4 to read as follows: “THE CONTRACTOR SHALL SPLICE FIBER IN ALL
MANHOLES/HANDHOLES.”
On NAVFAC Drawing Nos. 12,811,496 – 12,811,497 and 12,811,499 (ES128 – ES129 and ES131)
GENERAL SHEET NOTES: Add note 5 to read as follows: “THE CONTRACTOR SHALL SPLICE FIBER IN ALL
MANHOLES/HANDHOLES.”
On NAVFAC Drawing No. 12,811,500 (ES132)
GENERAL SHEET NOTES: Add note 6 to read as follows: “THE CONTRACTOR SHALL SPLICE FIBER IN ALL
MANHOLES/HANDHOLES.”
Specification Revisions
PROJECT TABLE OF CONTENTS
Section 32 05 33, LANDSCAPE ESTABLISHMENT is added to the Project Table of Contents and accompanies this design revision.
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
3.4.6 COMMERCIAL VEHICLES IN/OUT OF AIRFIELD
Add sentence at end of paragraph to read “Contractor may also provide a gateman to supervise traffic during periods of frequent entry/exit of construction vehicles. If a gateman is used, coordinate with the Airfield Manager via the Contracting Officer and provide personnel name and cellular telephone number for maintaining contact with the Airfield Manager or Air Operations Duty Officer. The Airfield Manager reserves the right to direct changes to security measures or gateman personnel as deemed necessary for Airfield security.”
REPAIR LP AREA RUNWAY 10-28 1607816
SECTION 32 05 33
LANDSCAPE ESTABLISHMENT
08/17
PART 1 GENERAL
1.1 RELATED REQUIREMENTS
Section 32 92 19 SEEDING applies to this section for installation of seed requirements, with additions and modifications herein.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include mowing for all newly installed landscape areas. Contractor is not responsible for mowing existing areas that remain unchanged during the construction process.
3.2 GROUNDCOVER ESTABLISHMENT
Groundcover establishment will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this contract has been satisfactorily installed to a 95 percent stand of coverage.
3.2.1 Frequency of Maintenance
Begin maintenance immediately after turf has been installed. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.
3.2.2 Promotion of Growth
Maintain groundcover in a manner that promotes proper health, growth, natural color. Turf must have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow and remove excess clippings to promote growth, as approved by Contracting Officer.
3.2.3 Mowing
3.2.3.1 Turf
Mow turf at a uniform finished height. Mow new turf areas to a minimum average height of 4 inches. The height of turf is measured from the soil. Perform mowing of turf in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area must be picked up and disposed. Adjacent paved areas must be swept/vacuumed clean.
3.2.4 Turf Watering
Perform irrigation in a manner that promotes the health, growth, color and
SECTION 32 05 33 Page 1
REPAIR LP AREA RUNWAY 10-28 1607816
appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities directives. The Contractor must be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of application.
Abide by state, local or other water conservation regulations or restrictions in force during the establishment period.
3.2.5 Final Inspection and Acceptance
Final inspection will be made upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period.
Final turf acceptance will be based upon a satisfactory stand of turf.
Final acceptance of grass areas will be based upon a stand of 95 percent groundcover of established species.
3.2.6 Unsatisfactory Work
When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.
-- End of Section --
SECTION 32 05 33 Page 2
File details come from the government source that posted it. Updated .