Attachment C - Construction Experience Project Data Sheet.docx
DOCX document 16 KB Posted
- Solicitation number
- N40085-20-R-0044
About this file
This solicitation package includes an Attachment C Construction Experience Project Data Sheet template and details for solicitation N40085-20-R-0044. The solicitation is for repair of Runway 10-28 at Naval Station Norfolk, including asphalt and concrete maintenance and repairs, runway markings, demolition, and reconstruction. Additional work includes installation support for an Instrument Landing System, including demolition of existing equipment, installation of foundations and equipment, access road construction, and utility work. Further, it includes airfield signage electrical improvements involving concrete, demolition, repairs and replacement. Construction is required starting in June 2020 through December 2020. Offerors must provide details on five relevant past construction projects using the Attachment C template, including descriptions of work, dollar values, and specifics of prime contractor or subcontractor roles. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DBB Repair LP AREA RUNWAY + ILS INSTALLATION | N40085-20-R-0044 | |
| Naval Station Norfolk, VA | Solicitation |
ATTACHMENT C
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information:
File details come from the government source that posted it. Updated .