Solicitation N40085-19-R-9223.pdf

PDF 912 KB Posted

Attached to
Facility Investment, Pest Control and Railroad services at Marine Corps Logistics Base (MCLB), Albany, Georgia
Solicitation number
N4008519R9223
Issued by

View the file

Other files

File Type Posted
Amendment 0008 N4008519R9223.pdf PDF
J-1502000-31-01.pdf PDF
Revised Attachment J-020000-14.pdf PDF
J-0200000-13 Clean ELIN 100 updated.xlsx XLSX spreadsheet
Amendment 0007 N4008519R9223.pdf PDF
Amendment 06 N4008519R9223 Albany Multi Services.pdf PDF
N4008519R9225 Amendment 05.pdf PDF
Amend 04 - Attachment - J-0200000-15 - Recent Relevant Experience.pdf PDF
N4008519R9223 Site Visit redacted.pdf PDF
N4008519R9223 AMENDMENT 04.pdf PDF
J-0200000-13 ELIN Revised.xlsx XLSX spreadsheet
Amendment 0003 N4008519R9223.pdf PDF
Amendment 0002 N4008519R9223.pdf PDF
Attachment J -0200000-12.docx DOCX document
N40085-19-R-9223-0001.pdf PDF
J-0200000.pdf PDF
J-0200000-13 ELIN.xlsx XLSX spreadsheet
J-150200000.pdf PDF
J-1503020.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 21 Jan 2020

X

A X B X C

D

EX

X G F 120 - 131

132 - 138 X H 139 - 147 susan.roberts2@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C2 1 147

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40085 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Bldg. Z-140, Suite 216 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SUSAN C. ROBERTS (757) 341-0091

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 12

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

13 - 79 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

80 - 82 83 - 94

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 95 - 98 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 99 - 100 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

101 - 118

PART II - CONTRACT CLAUSES

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

ACQR5752694

5. DATE ISSUED

17 Dec 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008519R9223

Section A - Solicitation/Contract Form

COVER SHEET

NAVAL FACILITIES ENGINEERING COMMAND

MID-ATLANTIC DIVISION

ACQUISITION CORE

NORFOLK, VIRGINIA 23511-3095

NOTICE:

Proposals to be submitted by 2:00 P.M.

At the office of CDR Mid-Atlantic Division Naval Facilities Engineering Command Facility Support Contract Building Z-140, Suite 216 9324 Virginia Avenue Norfolk, Virginia 23511-3095

NAVFAC SPECIFICATION

No. 05-19-9223

RFP NUMBER N4008519R9223

FACILITY INVESTMENT SERVICES, PEST CONTROL AND RAILROAD MAINTENANCE

SERVICES AT MARINE CORPS LOGISTICS BASE (MCLB), ALBANY GA

NOTICE

All inquiries concerning any phase of the specification, prior to the proposal due date shall be made to the Commander, Naval Facilities Engineering Command, Mid-Atlantic Division, Facility Support Contract Branch, Building Z-140, Suite 216, 9324 Virginia Avenue, Norfolk, Virginia 23511, Telephone (757) 341-0091, Attn: Susan Roberts.

Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-S1 rating in accordance with the provisions of DPA Regulation 1 and/or DMS Regulation 1.

Section B - Supplies or Services and Prices

GENERAL INFORMATION

B.1 Contract Title: Facility Investment, Pest Control and Railroad Maintenance Services at Marine Corps

Logistics Base (MCLB), Albany GA.

B.2 Type of Contract: This is a Facilities Support, Indefinite Delivery/Indefinite Quantity Contract with Recurring and

Non-Recurring Services as noted in Section L, Instructions, Conditions, and Notices to Offeror.

B.3 Minimum Guarantee: The Recurring Price portion of the base year only is the minimum guarantee for this contract will be paid in the base year.

B.4 Set-Aside: 100% Small Business Set-Aside Competitive Procurement. Refer to Section I, FAR Clause

52.219-6, Notice of Total Small Business Set-Aside.

B.5 NAICS Code: The NAICS Code assigned to this procurement is 561210 with a small business size standard of $38,500,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via (SAM) at https://www.sam.gov/portal/public/SAM .

B.6 Wage Determination (Service)/Wage Decision (Construction): Service Contract Act (SCA) and Wage Rate

Requirements Construction (formerly Davis-Bacon Act), wages are included in this solicitation. Refer to Section J, Attachments.

SCA (Wage Determination No.2015-4468 Rev 13) shall be used for wage rates and fringe benefits for FSC services. See ELINs.

Wage Rate Requirements Construction (General Decision Number: GA20190127) shall be used for construction wage rates and fringe See ELINs.

WAGE RATE REQUIREMENTS CONSTRUCTION IN FACILITY SUPPORT CONTRACTS

INCLUDING CONSTRUCTION

This contract contains only one Wage Rate Requirement Construction General Decision which shall be in effect for the life of the contract. The contractor may include in the offered price for the option years any increase needed for wages or benefits for construction work under the contract. The contractor warrants that the prices in the option years of this contract do not include any allowance for any contingency to cover increased cost for which adjustment is provided under FAR clause 52.217- 43, Fair Labor Standards Act and Service Contract Act - Price Adjustment. Offerors are required to segregate Wage Rate Requirements Construction (formerly Davis-Bacon), hours and wages and SCA hours and wages in the payroll records.

B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.

B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods, not to exceed a total of sixty (60) months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.

B.9 Period of Performance: The period of performance will be determined at the time of award.

B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs 0001 through 0010 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).

B.11 Contract Line Items And Contract Exhibit Line Items

a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.

c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007 and 0009) and the Schedule of Non-

Recurring Work (CLIN 0002, 0004, 0006, 0008 and 0010) will be used as the basis for deductions in accordance with FAC Clause 5252.246-9303, "CONSEQUENCES OF CONTRACTOR'S FAILURE TO PERFORM REQUIRED SERVICES" Section E.

B.12 Unit Price Adjustments In Option Periods

This contract incorporates the Service Contract Act (SCA) and the Wage Rates-Construction. The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract. Unit prices will ONLY be adjusted for the Service Contract Act (SCA) wage increases in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of his proposal, that the price does not include any contingency for future wage increases with the exception of Wage Rates-Construction.

B.13 Indefinite Quantity Individual Contract Line Item Quantities

Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.

B.14 Unit Prices For Labor

a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Quantity Work.

b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Quantity Work” accomplished in the time period shown.

c. The Contractor shall enter, in the unit price proposal space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards).

The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.

B.15 Period Of Performance – Less than One Year

Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.

B.16 Government Purchase Card

Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.

B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)

This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.

B.18 Reserved

B.19 Incorporation of Non-Price Proposal

a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.

b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.

B.20 Request For Proposals (RFP) Information/Clarification Questions

Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, either by email to susan.roberts2@navy.mil or fax to: 757-341-0079. This is the most efficient way to ensure all questions are addressed in a timely manner.

B.21 Request for Proposal (RFP) Files:

Solicitations are posted to the Beta Sam website (https://beta.sam.gov/ ) as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.

It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.

Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.

B.22 Solicitation

This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.

B.23 Notice to Offerors:

Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:

CLINS ELINs CLINs ELINs 0001 A001 through A005 0006 C700 through C718 0002 A700 through A718 0007 D001 through D005 0003 B001 through B005 0008 D700 through D718 0004 B700 through B718 0009 E001 through E005 0005 C001 through C005 0010 E700 through E718

B.24 Proposal Delivery

DBIDS INFORMATION:

Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:

https://www.cnic.navy.mil/om/dbids.html .

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

Submitting Your Proposal

Proposals that are sent via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:

NAVFAC MID-LANT

Attn: Susan Roberts 9324 Virginia Avenue

Building Z-140¸ Room 216 Norfolk, Virginia 23511

Proposals that are hand carried excluding commercial carriers noted above shall be delivered to the Contracts Office in Building Z-140, 2nd Floor, Suite 216, front lobby located at 9324 Virginia Avenue, Norfolk, VA 23511 (Norfolk Naval Station).

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Each

BASE YEAR RECURRING SERVICES

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR5752694

PSC CD: Z1JZ

NET AMT

0002 Each

BASE YEAR - NON-RECURRING SERVICES

FFP

FOB: Destination

0003 Each

OPTION YR 1 - RECURRING SERVICES

FFP

FOB: Destination

0004 Each

OPTION YR 1 - NON-RECURRING SERVICES

FFP

FOB: Destination

0005 Each

OPTION YR 2 - RECURRING SERVICES

FFP

FOB: Destination

0006 Each

OPTION YR 2 - NON- RECURRING SERVICES

FFP

FOB: Destination

0007 Each

OPTION YR 3 - RECURRING SERVICES

FFP

FOB: Destination

0008 Each

OPTION YR 3 - NON-RECURRING SERVICES

FFP

FOB: Destination

0009 Each

OPTION YR 4 - RECURRING SERVICES

FFP

FOB: Destination

0010 Each

OPTION YR 4 - NON- RECURRING SERVICES

FFP

FOB: Destination

Section C - Descriptions and Specifications

ANNEX 1, 2 AND 15

0100000 – General Information Spec Item

Title

1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor's Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Marine Corps Logistics Base (MCLB), Albany Georgia by the means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff-N/A Annex 4 Public Safety-N/A Annex 5 Air Operations-N/A Annex 6 Port Operations-N/A Annex 7 Ordnance-N/A Annex 8 Range Operations-N/A Annex 9 Health Care Support-N/A Annex 10 Supply-N/A Annex 11 Personnel Support-N/A Annex 12 Morale, Welfare and Recreation Support-N/A Annex 13 Galley-N/A Annex 14 Housing-N/A Annex 15 Facilities Support 1502000 - Facility Investment 1503020 – Pest Control Annex 16 Utilities-N/A Annex 17 Base Support Vehicles and Equipment-N/A Annex 18 Environmental-N/A

1.2 Project Location The work shall be performed at various locations at MCLB Albany, GA. and could vary from location to location. The following is an example of the dispersion of work at the various locations.

(1) Maintenance and Repair facilities, ground structures, and installed equipment and systems at MCLB, Albany, GA.

(2) Pest Control Services at MCLB Albany, GA.

1.3 Acquisition of

Additional Work The Government reserves the right to acquire additional services at additional locations in addition to the services and locations identified in the recurring work requirements of this contract.

Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the nonrecurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background

Information

Marine Corps Logistics Base (MCLB) Albany is the proud home of Marine Corps Logistics Command and Marine Depot Maintenance Command/Production Plant Albany. MCLB Albany is dedicated to supporting the warfighter by providing high quality, cost-effective installation support services to its supported commands and agencies, particularly Marine Corps Logistics Command and its components; Marines, Sailors, and other service members (including families); Civilian personnel;

and the surrounding community. The base provides facilities infrastructure and a range of tailored support services enabling supported commands aboard the installation to accomplish their assigned missions in support of the warfighter.

MCLB Albany is also committed to providing its service members, Marines, Civilian and families, a safe and secure environment to work and live, thereby increasing quality of life for all. The base works towards being environmentally conscious and look for ways to decrease use of non-renewable energy sources, to increase security, and reduce cost where applicable.

The base will reach out to the surrounding community to find ways to share common goals and values, and will build relationships that are good for the Corps and the community, which will last far into the future.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns The Albany Georgia area experiences long and exceedingly warm summers and short and very cool winters. The hot season lasts for 4.2 months, from May 17 to September 22, with an average daily high temperature above 86°F. The cool season lasts for 2.9 months, from November 30 to February 24, with an average daily high temperature below 66°F. Albany gets some kind of precipitation, on average, 73 days per year. Precipitation is rain, snow, sleet, or hail that falls to the ground. The average annual precipitation is 51.47 inches. The low to high monthly precipitation ranging from 2.6 inches in October to 5.9 inches in

July, and average wind speeds ranging from 8.2 and 9.1 miles per hour. Normally expected conditions can become radically impacted by sustained forced winds cause by tornadoes. March, April, and May are typically the most active months for tornadoes. Due to the location, MCLB Albany keeps an eye on the Gulf of Mexico and the Atlantic Ocean during hurricane season (June 1- November 30).

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer.

Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering

Philosophy

The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy, the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's

Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best

Practices

The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation.

NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized.

Specification item 1 will always contain General Information.

Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements. Specification item 4 will always contain the Non-Recurring Work requirements.

Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items.

Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA

Approach

The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 – Management and Administration Table of Contents

Spec Item Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and

Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 United States Marine Corps MAXIMO (USMCmax)

2.6.6.1 USMCmax Data

2.6.6.2 USMCmax Method of Data Entry

2.6.6.3 USMCmax Access

2.6.6.4 USMCmax Training

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.1.5 Competent Person

2.7.1.6 Journeyman Locksmith

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation Defense Biometric Identification System DBIDS

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.4.3 DBIDS Paper Passes

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Asbestos Abatement Plan

2.9.3.6 Demolition Plan

2.9.3.7 Emergency Response Plans

2.9.3.8 Excavation/Trenching Plan

2.9.3.9 Fall Prevention and Protection Plan

2.9.3.10 Fire Prevention Program

2.9.3.11 Hazardous Energy Control Program

2.9.3.12 Lead Compliance and Abatement Plan

2.9.3.13 Respiratory Protection Program

2.9.3.14 Site Sanitation Plan

2.9.3.15 Temporary Facility Layout Plan

2.9.3.16 Underground Emergency Rescue Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 ODS Requirements for Refrigerant Recycling

2.10.2.2 Non-Hazardous Waste Disposal

2.10.2.3 Hazardous Waste Disposal

2.10.2.4 Spill Prevention, Containment, and Clean-up

2.10.2.5 Hazardous Material Management

2.10.2.6 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.7 Noise Control

2.10.2.8 Salvage

2.10.2.9 Asbestos Containing Material (ACM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Notification to the Government for Work Above the Recurring Work Limitations

2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.15 Non-recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-recurring ELINS

1502000 – Facility Investment Table of Content Spec Item Title 1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training, and Licensing

2.3 Special Requirements

2.3.1 Workmanship and Material Standards

2.3.1.1 Railroad Materials

2.3.1.2 Hot Work

2.3.2 Historical Preservation

2.4 References and Technical Documents

3 Recurring Work

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.1.4 Major Service Orders

3.1.5 Locksmith Service Orders

3.2 Preventive Maintenance (PM) Program

3.2.1 HVACR Systems and Geo-Thermal Systems Equipment

3.2.2 Exhaust Fans

3.2.3 Weight Scales (Base Wide) Maintenance

3.2.4 Boilers and Unfired Pressure Vessels (UPVs)

3.2.5 Fire Protection Systems

3.2.5.1 Fire Alarm Systems

3.2.5.1.1 Fire Door Maintenance

3.2.5.2 Fire Suppression Systems

3.2.6 Vertical Transportation Equipment (VTE)

3.2.7 Compressed Air Systems

3.2.8 Auxiliary Generators

3.2.8.1 Automatic Transfer Switches (ATS)

3.2.9 Force Protection Systems

3.2.10 Above Ground Storage Tanks (ASTs)

3.2.11 Dust Collectors

3.2.12 Air Dehydration Units (ADU)

3.3 Inspection, Testing, and Certification Program

3.3.1 Boilers and UPVs

3.3.2 Backflow Prevention Devices

3.3.3 Vertical Transportation Equipment (VTE)

3.4 Other Recurring Services Program

3.4.1 Grease Traps

3.4.2 Exhaust Hoods and Ducts

3.4.3 HVAC Water Testing and Treatment Services

3.4.4 Boiler Seasonal Start-Up and Shutdown

3.4.5 Boiler Water Testing and Treatment Services

3.4.6 Reverse Osmosis Systems

3.4.7 Septic Tank Systems

3.4.8 Chlorine Generator System

3.4.9 Water Softener Systems

3.4.10 Roof Maintenance

3.4.11 Variable Frequency Drive

3.4.12 Railroad Trackage Maintenance

3.4.12.1 Railroad Trackage Vegetation Control

4 Non-Recurring Work

1502000 – Facility Investment Table of Content

1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training, and Licensing

2.3 Special Requirements

2.3.1 Workmanship and Material Standards

2.3.1.1 Railroad Materials

2.3.1.2 Hot Work

2.3.2 Historical Preservation

2.4 References and Technical Documents

3 Recurring Work

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.1.4 Major Service Orders

3.1.5 Locksmith Service Orders

3.2 Preventive Maintenance (PM) Program

3.2.1 HVACR Systems and Geo-Thermal Systems Equipment

3.2.2 Exhaust Fans

3.2.3 Weight Scales (Base Wide) Maintenance

3.2.4 Boilers and Unfired Pressure Vessels (UPVs)

3.2.5 Fire Protection Systems

3.2.5.1 Fire Alarm Systems

3.2.5.1.1 Fire Door Maintenance

3.2.5.2 Fire Suppression Systems

3.2.6 Vertical Transportation Equipment (VTE)

3.2.7 Compressed Air Systems

3.2.8 Auxiliary Generators

3.2.8.1 Automatic Transfer Switches (ATS)

3.2.9 Force Protection Systems

3.2.10 Above Ground Storage Tanks (ASTs)

3.2.11 Dust Collectors

3.2.12 Air Dehydration Units (ADU)

3.3 Inspection, Testing, and Certification Program

3.3.1 Boilers and UPVs

3.3.2 Backflow Prevention Devices

3.3.3 Vertical Transportation Equipment (VTE)

3.4 Other Recurring Services Program

3.4.1 Grease Traps

3.4.2 Exhaust Hoods and Ducts

3.4.3 HVAC Water Testing and Treatment Services

3.4.4 Boiler Seasonal Start-Up and Shutdown

3.4.5 Boiler Water Testing and Treatment Services

3.4.6 Reverse Osmosis Systems

3.4.7 Septic Tank Systems

3.4.8 Chlorine Generator System

1502000 – Facility Investment Table of Content

3.4.9 Water Softener Systems

3.4.10 Roof Maintenance

3.4.11 Variable Frequency Drive

3.4.12 Railroad Trackage Maintenance

3.4.12.1 Railroad Trackage Vegetation Control

4 Non-Recurring Work

1502000 – Facility Investment Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for facilities, ground structures, and installed equipment and systems at Marine Corps Logistics Base (MCLB), Albany GA.

1.1 Concept of

Operations

The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Marine programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.

The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:

Building and Structures -Interior and exterior finishes -Roofing -Foundation -Structural Components -Tanks -Pipelines

Building Systems

-HVAC

-Fire Protection -Vertical Transportation Equipment (VTE) -Boilers (excluding Central Utility Plant Boilers) -Unfired Pressure Vessels (UPV) -Compressed Air Systems -Potable Water (including backflow prevention devices) -Wastewater -Electrical -Auxiliary Generator Systems (including emergency and portable generators) -Uninterruptible Power Systems (UPS) -Grease Traps -Exhaust Hoods and Ducts -Exhaust Fans -Above Ground Storage Tanks and Underground Storage Tanks -Dust Collectors -Weight Scales -Force Protection Systems -Reverse Osmosis Systems -Water Softeners -Hot Water Heaters -Environment Stabilization Systems (ESS), (including remote monitoring/control systems and air dehydration units) Miscellaneous -Fences -Locksmith (all locks including Lockmaster Security Lock – LKM-7003 w/Mas x-09

Item

Title Description

Type 1F) -Drainage Ditches -Monuments -Flag Poles -Unpaved Roads (gravel roads) -Compressed Natural Gas Stations Roads and Paved Surfaces -Traffic Control Devices -Bicycle Paths -Pedestrian/Jogging Paths -Striping -Curbs -Sidewalks -Parking Lots -Bridges -Drainage Systems -Outdoor Courts Trackage -Railroads

All work for the listed items above may be performed through service orders if not identified in a specific Spec Item for Preventive Maintenance Program; Integrated Management Program; Inspection, Testing, and Certification Program; or Other Recurring Services Program. Service Orders may be issued for a wide variety of work within the entire boundary of the installation

The following services are not included:

Infrastructure Condition Assessment Program (ICAP) services including asset updates and condition assessment is covered under 1501000 Facility Management.

Stand-by electrical power generators located within the electrical power generation plant or which serve more than one facility are covered under 1602000 Electrical. Facility Investment includes maintenance only for auxiliary generators serving individual facilities.

Service orders from the Utilities Annexes (1602000, 1603000, 1604000, 1605000, 1606000, and 1610000) are covered under 1601000, Utility Management.

Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1502000-01

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.

2.2.1 Certification, Training, and Licensing

All maintenance and repair shall be performed by personnel trained and certified by the OEM.

Personnel inspecting, witnessing tests, preparing reports, and issuing certificates for boilers and UPVs must be qualified per UFC 3-430-07.

Personnel inspecting, certifying, and making recommendations for corrective action for backflow preventers shall be certified per UG-2029-ENV.

Personnel performing inspections and tests on VTEs must be qualified per NAVFAC

MO-118.

Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6

Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.

Personnel working on fire protection systems must be certified per UFC 3-600-02.

Personnel performing work on transformers must be knowledgeable of proper procedures for handling and disposing of insulating fluid containing polychlorinated biphenyls (PCBs)

Personnel performing work in HAZMAT/HAZWASTE must complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.

All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3 Special

Requirements

2.3.1 Workmanship

and Material Standards

The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements

Item

Title Description identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.

Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

2.3.1.1 Railroad

Materials

The Contractor shall only use new materials and equipment during the performance of work. All materials, equipment and appliances must be of the current manufacturers' products. The Contractor shall not use obsolete or discontinued materials, equipment and appliances.

2.3.1.2 Hot Work Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The Contractor will provide at least two (2) ten (10) pound 4A:80 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 Hour after completion of the task or as specified on the hot work permit.

When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the EMERGENCY FIRE phone number 229-639-5911. ANY FIRE, NO

MATTER HOW SMALL, SHALL BE REPORTED TO 229- 639-5911

IMMEDIATELY.

2.3.2 Historical

Preservation

Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state and local historical policies and regulations.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1502000-02.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work The Contractor shall maintain, repair, and alter facilities, ground structures, and installed equipment and systems to ensure they are fully functional and in normal working condition.

The Contractor shall develop, implement, and execute a Service Order, Maintenance Program, Inspection, Testing, and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .