| Summary | ||
| Period | Recurring | NonRecurring |
| BASE | ||
| OPTION 1 | ||
| OPTION 2 | ||
| OPTION 3 | ||
| OPTION 4 | ||
| Totals | ||
| Total Aggregated |
ELIN-Base Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N400085-19-R-9223 |
| EXHIBIT A |
| Line Item 0001 Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A005 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Grand Total |
| 1502000 Facilities Investment | ||||||
| A001 | BASE | |||||
| A001AA | Emergency Service Orders 3.1.1 | 30 | EA | |||
| A001AB | Urgent Service Orders 3.1.2 | 65 | EA | |||
| A001AC | Routine Service Service Orders 3.1.3 | 215 | EA | |||
| A001AD | Major Service Orders 3.1.4 | 30 | EA | |||
| A001AE | Air Handler (34 ea.) 3.2.1 | 12 | MO | |||
| A001AF | Air Separator (4 ea.) 3.2.1 | 12 | MO | |||
| A001AG | Air Fluid Cooler (4 ea.) 3.2.1 | 12 | MO | |||
| A001AH | Chillers (8 ea.) 3.2.1 | 12 | MO | |||
| A001AJ | Condensing Unit (8 ea.) 3.2.1 | 12 | MO | |||
| A001AK | Energy Recovery Unit (3 ea.) 3.2.1 | 12 | MO | |||
| A001AL | Fluid cooler (2 ea.) 3.2.1 | 12 | MO | |||
| A001AM | Expansion tank (3 ea.) 3.2.1 | 12 | MO | |||
| A001AN | Heater Hot water coil (1 ea.) 3.2.1 | 12 | MO | |||
| A001AP | Heat Exchanger (1 ea.) 3.2.1 | 12 | MO | |||
| A001AQ | Heat Pump (36 ea.) 3.2.1 | 12 | MO | |||
| A001AR | HVAC Package Unit (4 ea.) 3.2.1 | 12 | MO | |||
| A001AS | Pumps (22 ea.) 3.2.1 | 12 | MO | |||
| A001AT | Exhaust Fans (4 ea.) 3.2.2 | 12 | MO | |||
| A001AU | Scales (2 ea.) 3.2.3 | 12 | MO | |||
| A001AV | Boilers(18 ea.) 3.2.4 | 12 | MO | |||
| A001AW | Fire Alarm (53 ea.) 3.2.5.1 | 12 | MO | |||
| A001AX | Fire Door Maintenance (153 ea.) 3.2.5.1.1 | 12 | MO | |||
| A001AY | Fire suppression Hoods (5 ea.) 3.2.5.2 | 12 | MO | |||
| A001AZ | Dry (6 ea.) 3.2.5.2 | 12 | MO | |||
| A001BA | Wet (130 ea.) 3.2.5.2 | 12 | MO | |||
| A001BB | Wet chemical (1 ea.) 3.2.5.2 | 12 | MO | |||
| A001BC | Fire Hydrants (369 ea.) 3.2.5.2 | 12 | MO | |||
| A001BD | Elevators (6 ea.) Hydraulic 3.2.6 | 12 | MO | |||
| A001BE | Lifts (16 ea.) 3.2.6 | 12 | MO | |||
| A001BF | Air Compressor (12 ea.) 3.2.7 | 12 | MO | |||
| A001BG | Generators (20 ea.) 3.2.8 | 12 | MO | |||
| A001BH | Automatic Transfer Units (12 ea.) 3.2.8.1 | 12 | MO | |||
| A001BJ | Catsclaw (1 ea.) 3.2.9 | 12 | MO | |||
| A001BK | Bollards barrier (5 ea.) 3.2.9 | 12 | MO | |||
| A001BL | Above Ground Storage Tanks (25 ea.) 3.2.10 | 12 | MO | |||
| A001BM | Air Dehydration Units (5 ea.) 3.2.12 | 12 | MO | |||
| A001BN | Certification Boilers(17 ea.) 3.3.1 | 12 | MO | |||
| A001BP | Certification Backflow (110 ea.) 3.3.2 | 12 | MO | |||
| A001BQ | Certification Elevators (6 ea.) Hydraulic 3.3.3 | 12 | MO | |||
| A001BR | Certification Lifts (16 ea.) 3.3.3 | 12 | MO | |||
| A001BS | Grease traps (4 ea.) 3.4.1 | 12 | MO | |||
| A001BT | Exhaust Ducts Hoods (6 ea.) 3.4.2 | 12 | MO | |||
| A001BU | HVAC water treatment (13 ea. Closed loops) 3.4.3 | 12 | MO | |||
| A001BV | Boiler Seasonal Startup and Shutdown (4 ea.) 3.4.4 | 12 | MO | |||
| A001BW | Boiler water treatment (12 ea.) 3.4.5 | 12 | MO | |||
| A001BX | Septic Tank (2 ea.) 3.4.7 | 12 | MO | |||
| A001BY | Chlorine Generator (1 ea.) 3.4.8 | 12 | MO | |||
| A001BZ | Water Softeners (19 ea.) 3.4.9 | 12 | MO | |||
| A001CA | Roof Maintenance (2,948,656 SF) 3.4.10 | 12 | MO | |||
| A001CB | VFD (8 ea.) 3.4.11 | 12 | MO | |||
| A001CC | Railroad Trackage (24.7 Miles) 3.4.12 | 12 | MO | |||
| A001CD | Railroad Trackage Vegetation Control (24.7 Miles) 3.4.12.1 | 12 | MO | |||
| Base Sub total | ||||||
| 1503020 Pest Control | ||||||
| A001CE | Pest Control Services 3.1.9 (3,518,536 SF) COL 3 | 12 | MO | |||
| A001CF | Pest Control Services 3.1.9 (3,518,536 SF) COL 4 | 0 | MO | |||
| A001CG | Pest Service Orders 3.2.1 | 60 | EA | |||
| A001CH | Pest Management Reporting 3.3 | 12 | MO | |||
| Base Pest Total |
| BASE GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| A002 | DLA | ||
| A002AA | Emergency Service Orders 3.1.1 | 5 | EA |
| A002AB | Urgent Service Orders 3.1.2 | 5 | EA |
| A002AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| A002AD | Major Service Orders 3.1.4 | 2 | EA |
| A002AE | Exhaust Fan (2 ea.) 3.2.2 | 12 | MO |
| A002AF | Scales (7 ea.) 3.2.3 | 12 | MO |
| A002AG | Fire Alarm (12 ea.) 3.2.5.1 | 12 | MO |
| A002AH | Fire Door Maintenance (112 ea.) 3.2.5.1.1 | 12 | MO |
| A002AJ | Fire suppression Wet (84 ea.) 3.2.5.2 | 12 | MO |
| A002AK | Fire pumps (2 ea.) 3.2.5.2 | 12 | MO |
| A002AL | Air Compressor (5 ea.) 3.2.7 | 12 | MO |
| A002AM | Generators (1 ea.) 3.2.8 | 12 | MO |
| A002AN | Automatic Transfer Units (1 ea.) 3.2.8.1 | 12 | MO |
| A002AP | Above Ground Storage Tanks (2 ea.) 3.2.10 | 12 | MO |
| A002AQ | Dust Collectors (2 ea.) 3.2.11 | 12 | MO |
| A002AR | Certification Backflow (4 ea.) 3.3.2 | 12 | MO |
| A002AS | Roof Maintenance (1,377,510 SF) 3.4.10 | 12 | MO |
| DLA Sub total |
| 1503020 Pest Control | |||
| A002AT | Pest Control Services 3.1 (1,634,217 SF) COL 3 | 12 | MO |
| A002AU | Pest Control Services 3.1 (1,634,217 SF) COL 4 | 0 | MO |
| A002AV | Pest Pest Service Orders 3.2.1 | 10 | EA |
| A002AW | Pest Management Reporting 3.3 | 12 | MO |
| DLA Pest Total |
| DLA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| A003 | MFSC | ||
| A003AA | Emergency Service Orders, 3.1.1 | 5 | EA |
| A003AB | Urgent Service Orders 3.1.2 | 5 | EA |
| A003AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| A003AD | Major Service Orders 3.1.4 | 3 | EA |
| A003AE | Air handler (2 ea.) 3.2.1 | 12 | MO |
| A003AF | Condensing Units (2 ea.) 3.2.1 | 12 | MO |
| A003AG | RTU /elect heat (1 ea.) 3.2.1 | 12 | MO |
| A003AH | Exhaust Fan (20 ea.) 3.2.2 | 12 | MO |
| A003AJ | Scales (5 ea.) 3.2.3 | 12 | MO |
| A003AK | Fire Door Maintenance (15 ea.) 3.2.5.1.1 | 12 | MO |
| A003AL | Lifts (5 ea.) 3.2.6 | 12 | MO |
| A003AM | Air Compressor (3 ea.) 3.2.7 | 12 | MO |
| A003AN | Air Dehydration Units (4 ea.) 3.2.12 | 12 | MO |
| A003AP | Certification Boilers(1 ea.) 3.3.1 | 12 | MO |
| A003AQ | Certification Backflow (10 ea.) 3.3.2 | 12 | MO |
| A003AR | Certification Lifts (5 ea.) 3.3.3 | 12 | MO |
| A003AS | Boiler water treatment (1 ea.) 3.4.5 | 12 | MO |
| A003AT | Roof Maintenance (223,500 SF) 3.4.10 | 12 | MO |
| MFSC Sub Total |
| 1503020 Pest Control | |||
| A003AU | Pest Control Services 3.1 (228,802) COL 3 | 12 | MO |
| A003AV | Pest Control Services 3.1 (228,802) COL 4 | 0 | MO |
| A003AW | Pest Pest Service Orders 3.2.1 | 5 | EA |
| A003AX | Pest Management Reporting 3.3 | 12 | MO |
| MFSC Pest Total |
| MFSC GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| A004 | PPA | ||
| A004AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| A004AB | Urgent Service Orders, Spec item 3.1.2 | 60 | EA |
| A004AC | Routine Service Service Orders, Spec Item 3.1.3 | 150 | EA |
| A004AD | Major Service Orders 3.1.4 | 15 | EA |
| A004AE | Air handler unit (9 ea.) 3.2.1 | 12 | MO |
| A004AF | Chiller (2 ea.) 3.2.1 | 12 | MO |
| A004AG | Condensing unit (2 ea.) 3.2.1 | 12 | MO |
| A004AH | Boilers (3 ea.) 3.2.4 | 12 | MO |
| A004AJ | Fire Alarm (26 ea.) 3.2.5.1 | 12 | MO |
| A004AK | Fire suppression Hoods (2 ea.) 3.2.5.2 | 12 | MO |
| A004AL | Dry (17 ea.) 3.2.5.2 | 12 | MO |
| A004AM | Pre Action (1 ea.) 3.2.5.2 | 12 | MO |
| A004AN | Wet (31 ea.) 3.2.5.2 | 12 | MO |
| A004AP | Elevators (1 ea.) Hydraulic 3.2.6 | 12 | MO |
| A004AQ | Lifts (2 ea.) 3.2.6 | 12 | MO |
| A004AR | Air Compressor (14 ea.) 3.2.7 | 12 | MO |
| A004AS | Above Ground Storage Tanks (14 ea.) 3.2.10 | 12 | MO |
| A004AT | Certification Boilers (5 ea.) 3.3.1 | 12 | MO |
| A004AU | Certification Backflow (53 ea.) 3.3.2 | 12 | MO |
| A004AV | Certification Elevators (1 ea.) Hydraulic 3.3.3 | 12 | MO |
| A004AW | Certification Lifts (4 ea.) 3.3.3 | 12 | MO |
| A004AX | Grease traps (1 ea.) 3.4.1 | 12 | MO |
| A004AY | Exhaust Ducts Hoods (1 ea.) 3.4.2 | 12 | MO |
| A004AZ | HVAC water treatment (2 ea. Closed loop) 3.4.3 | 12 | MO |
| A004BA | Reverse Osmosis System (1 ea.) 3.4.6 | 12 | MO |
| A004BB | Roof Maintenance (360,020 SF) 3.4.10 | 12 | MO |
| PPA Sub Total | |||
| 1503020 Pest Control | |||
| A004BC | Pest Control Services 3.1 (1,219,769 SF) COL 3 | 12 | MO |
| A004BD | Pest Control Services 3.1 (1,219,769 SF) COL 4 | 0 | MO |
| A004BE | Pest Pest Service Orders 3.2.1 | 15 | EA |
| A004BF | Pest Management Reporting 3.3 | 12 | MO |
| PPA Pest Total |
| PPA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| A005 | VA | ||
| A005AA | Emergency Service Orders 3.1.1 | 3 | EA |
| A005AB | Urgent Service Orders 3.1.2 | 3 | EA |
| A005AC | Routine Service Orders 3.1.3 | 5 | EA |
| A005AD | Air handler (1 ea.) 3.2.1 | 12 | MO |
| A005AE | Condensing unit (1 ea.) 3.2.1 | 12 | MO |
| A005AF | Backflow (1 ea.) 3.3.2 | 12 | MO |
| VA SubTotal | |||
| 1503020 Pest Control | |||
| A005AG | Pest Control Services 3.1 (8,397 SF) COL 3 | 12 | MO |
| A005AH | Pest Control Services 3.1 (8,397 SF) COL 4 | 0 | MO |
| A005AJ | Pest Pest Service Orders 3.2.1 | 5 | EA |
| A005AK | Pest Management Reporting 3.3 | 12 | MO |
| VA Pest Total |
VA GRAND TOTAL
TOTAL RECURRING WORK BASE YEAR
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Base Period-Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-19-R-9223 |
| EXHIBIT A |
| Line Item 0002 Nonrecurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A718 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide one composite labor hour to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 1,000 | HR | |||||
| A701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELINs A701 and A702 | 1,500,000 | EA | $ 1.00 | $ 1,500,000.00 |
| A702 | Composite UPL Rate Work - Subject to the applicable Wage Rate Requirement ( Construction). MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 34,000 | HR | ||
| A703 | Construction Equipment Cost MUST BE NEGOTIATED BY KO. | Provide all construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2. Construction equipment requirements shall include a list of all construction equipment establishing the size, quality, number of units, and unit prices. This construction equipment is to support unit priced labor work. MUST BE NEGOTIATED BY KO. | 150,000.00 | EA | $ 1.00 | $ 150,000.00 |
| A704 | Emergency Service Orders | Provide labor and material to perform Emergency Service Order work. | 100 | EA | ||
| A705 | Urgent Service Orders | Provide labor and material to perform Urgent Service Order work. | 100 | EA | ||
| A706 | Routine Service Orders | Provide labor and material to perform Routine Service Order work. | 100 | EA | ||
| A707 | Major Service Orders | Provide labor and material to perform Major Service Order work. | 10 | EA | ||
| A708 | Roof Repair PVC Available DoD FedMall | Provide labor ands material to perform minor patch repair up to one square foot of PVC roofing. | 10 | EA | ||
| A709 | Roof Repair Hydro stop. Available DoD FedMall | Provide labor ands material to perform minor patch repair up to one square foot of Hydro stop roofing. | 10 | EA | ||
| A710 | Geothermal Services | Provide labor and material to perform an evaluation of the Geothermal systems, and provide a detailed report of findings and recommendations for each system. | 4 | EA | ||
| A711 | Mosquito Fogging Treatment Available DoD FedMall | Provide all labor and material to perform mosquito treatment. The contractor shall provide the application of a mosquito adulticide (ULV Formulation) at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item price. | 150 | MI | ||
| A712 | Mosquitos Larvae Treatment Available DoD FedMall | Provide all labor and material to perform mosquito larvae treatment. The contractor shall provide treatment at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. Larval control shall be obtain for seven days after first control action. The contractor shall maintain control for 30 days. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item price. | 1,000 | AC | ||
| A713 | Fire Ant Mound Treatment Available DoD FedMall | Provide all labor and material to perform fire ant treatment. The contractor shall provide fire ant treatment on the ant mounds at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. Fire ant control shall be obtain for five days after first control action. The contractor shall maintain control for 30 days. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item prices. The unit of issue "EA" is referenced for each mound. | 2,500 | EA | ||
| A714 | Replace Defective Ties Singly or in Clusters | Provide Labor and material to replace the defective tie clusters with cross-ties that match existing. Contractor shall install a crosstie at each marked location. Dispose of all spikes removed from the defective ties and install new spikes of proper size matching the size of existing tie plates. Ties shall be installed perpendicular to the rails and properly tamped and spiked. Ties shall be installed with the top of the tie (or the tie plate) in full contact with the base of the rail and the bottom of the tie near the rail seat in full contact with the ballast. | 100 | EA | ||
| A715 | Replace Defective Switch Timbers singly or in Clusters | Provide Labor and material to replace the defective switch timber clusters with switch timbers that match existing size. Contractor shall install a switch timber at each location marked. Dispose of all spikes removed from the defective ties and install new spikes of proper size matching the size of existing tie plates. Ties shall be installed perpendicular to the rails and properly tamped and spiked. Ties shall be installed with the top of the tie (or the tie plate) in full contact with the base of the rail and the bottom of the tie near the rail seat in full contact with the ballast. Replace Broken and Missing Bolts. | 100 | EA | ||
| A716 | Skim Raise Track and Turnouts | Provide labor and material to raise identified track segments ¼” (6mm), ballast, and regulate as detailed in the technical specifications. The purpose of the Skim Raise is to bring the ties and switch timbers into full contact with the rail and plates to maintain the gage and surface. | 500 | TF | ||
| A717 | Adjust Skewed Ties | Provide labor and material to adjust the skewed ties to be perpendicular to the rail. Correct the gage if not corrected by adjusting the ties. | 500 | TF | ||
| A718 | Re-gaging Turnouts, Clip Adjustment, and Switch Adjustment | Provide labor and material to perform Inspection of the turnouts for various gage defects and operational defects. The re-gaging task is intended to return the turnouts to correct gage, guardrail check gage, guardrail gage, layout dimensions, and switch throws to normal dimensions. The switch point clips on many of the turnouts have been shimmed to eliminate switch gapping. After the regaging and shim removal, the switch stands will be adjusted for proper operation and elimination of point gapping. | 500 | TF | ||
| TOTAL NONRECURRING WORK PRICE BASE YEAR |
ELIN-Option 1 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N400085-19-R-9223 |
| EXHIBIT B |
| Line Item 0003 Recurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B005 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Grand Total |
| 1502000 Facilities Investment | ||||||
| B001 | BASE | |||||
| B001AA | Emergency Service Orders 3.1.1 | 30 | EA | |||
| B001AB | Urgent Service Orders 3.1.2 | 65 | EA | |||
| B001AC | Routine Service Service Orders 3.1.3 | 215 | EA | |||
| B001AD | Major Service Orders 3.1.4 | 30 | EA | |||
| B001AE | Air Handler (34 ea.) 3.2.1 | 12 | MO | |||
| B001AF | Air Separator (4 ea.) 3.2.1 | 12 | MO | |||
| B001AG | Air Fluid Cooler (4 ea.) 3.2.1 | 12 | MO | |||
| B001AH | Chillers (8 ea.) 3.2.1 | 12 | MO | |||
| B001AJ | Condensing Unit (8 ea.) 3.2.1 | 12 | MO | |||
| B001AK | Energy Recovery Unit (3 ea.) 3.2.1 | 12 | MO | |||
| B001AL | Fluid cooler (2 ea.) 3.2.1 | 12 | MO | |||
| B001AM | Expansion tank (3 ea.) 3.2.1 | 12 | MO | |||
| B001AN | Heater Hot water coil (1 ea.) 3.2.1 | 12 | MO | |||
| B001AP | Heat Exchanger (1 ea.) 3.2.1 | 12 | MO | |||
| B001AQ | Heat Pump (36 ea.) 3.2.1 | 12 | MO | |||
| B001AR | HVAC Package Unit (4 ea.) 3.2.1 | 12 | MO | |||
| B001AS | Pumps (22 ea.) 3.2.1 | 12 | MO | |||
| B001AT | Exhaust Fans (4 ea.) 3.2.2 | 12 | MO | |||
| B001AU | Scales (2 ea.) 3.2.3 | 12 | MO | |||
| B001AV | Boilers(18 ea.) 3.2.4 | 12 | MO | |||
| B001AW | Fire Alarm (53 ea.) 3.2.5.1 | 12 | MO | |||
| B001AX | Fire Door Maintenance (153 ea.) 3.2.5.1.1 | 12 | MO | |||
| B001AY | Fire suppression Hoods (5 ea.) 3.2.5.2 | 12 | MO | |||
| B001AZ | Dry (6 ea.) 3.2.5.2 | 12 | MO | |||
| B001BA | Wet (130 ea.) 3.2.5.2 | 12 | MO | |||
| B001BB | Wet chemical (1 ea.) 3.2.5.2 | 12 | MO | |||
| B001BC | Fire Hydrants (369 ea.) 3.2.5.2 | 12 | MO | |||
| B001BD | Elevators (6 ea.) Hydraulic 3.2.6 | 12 | MO | |||
| B001BE | Lifts (16 ea.) 3.2.6 | 12 | MO | |||
| B001BF | Air Compressor (12 ea.) 3.2.7 | 12 | MO | |||
| B001BG | Generators (20 ea.) 3.2.8 | 12 | MO | |||
| B001BH | Automatic Transfer Units (12 ea.) 3.2.8.1 | 12 | MO | |||
| B001BJ | Catsclaw (1 ea.) 3.2.9 | 12 | MO | |||
| B001BK | Bollards barrier (5 ea.) 3.2.9 | 12 | MO | |||
| B001BL | Above Ground Storage Tanks (25 ea.) 3.2.10 | 12 | MO | |||
| B001BM | Air Dehydration Units (5 ea.) 3.2.12 | 12 | MO | |||
| B001BN | Certification Boilers(17 ea.) 3.3.1 | 12 | MO | |||
| B001BP | Certification Backflow (110 ea.) 3.3.2 | 12 | MO | |||
| B001BQ | Certification Elevators (6 ea.) Hydraulic 3.3.3 | 12 | MO | |||
| B001BR | Certification Lifts (16 ea.) 3.3.3 | 12 | MO | |||
| B001BS | Grease traps (4 ea.) 3.4.1 | 12 | MO | |||
| B001BT | Exhaust Ducts Hoods (6 ea.) 3.4.2 | 12 | MO | |||
| B001BU | HVAC water treatment (13 ea. Closed loops) 3.4.3 | 12 | MO | |||
| B001BV | Boiler Seasonal Startup and Shutdown (4 ea.) 3.4.4 | 12 | MO | |||
| B001BW | Boiler water treatment (12 ea.) 3.4.5 | 12 | MO | |||
| B001BX | Septic Tank (2 ea.) 3.4.7 | 12 | MO | |||
| B001BY | Chlorine Generator (1 ea.) 3.4.8 | 12 | MO | |||
| B001BZ | Water Softeners (19 ea.) 3.4.9 | 12 | MO | |||
| B001CA | Roof Maintenance (2,948,656 SF) 3.4.10 | 12 | MO | |||
| B001CB | VFD (8 ea.) 3.4.11 | 12 | MO | |||
| B001CC | Railroad Trackage (24.7 Miles) 3.4.12 | 12 | MO | |||
| B001CD | Railroad Trackage Vegetation Control (24.7 Miles) 3.4.12.1 | 12 | MO | |||
| Base Sub total | ||||||
| 1503020 Pest Control | ||||||
| B001CE | Pest Control Services 3.1.9 (3,518,536 SF) COL 3 | 12 | MO | |||
| B001CF | Pest Control Services 3.1.9 (3,518,536 SF) COL 4 | 0 | MO | |||
| B001CG | Pest Service Orders 3.2.1 | 60 | EA | |||
| B001CH | Pest Management Reporting 3.3 | 12 | MO | |||
| Base Pest Total |
| BASE GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| B002 | DLA | ||
| B002AA | Emergency Service Orders 3.1.1 | 5 | EA |
| B002AB | Urgent Service Orders 3.1.2 | 5 | EA |
| B002AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| B002AD | Major Service Orders 3.1.4 | 2 | EA |
| B002AE | Exhaust Fan (2 ea.) 3.2.2 | 12 | MO |
| B002AF | Scales (7 ea.) 3.2.3 | 12 | MO |
| B002AG | Fire Alarm (12 ea.) 3.2.5.1 | 12 | MO |
| B002AH | Fire Door Maintenance (112 ea.) 3.2.5.1.1 | 12 | MO |
| B002AJ | Fire suppression Wet (84 ea.) 3.2.5.2 | 12 | MO |
| B002AK | Fire pumps (2 ea.) 3.2.5.2 | 12 | MO |
| B002AL | Air Compressor (5 ea.) 3.2.7 | 12 | MO |
| B002AM | Generators (1 ea.) 3.2.8 | 12 | MO |
| B002AN | Automatic Transfer Units (1 ea.) 3.2.8.1 | 12 | MO |
| B002AP | Above Ground Storage Tanks (2 ea.) 3.2.10 | 12 | MO |
| B002AQ | Dust Collectors (2 ea.) 3.2.11 | 12 | MO |
| B002AR | Certification Backflow (4 ea.) 3.3.2 | 12 | MO |
| B002AS | Roof Maintenance (1,377,510 SF) 3.4.10 | 12 | MO |
| DLA Sub total |
| 1503020 Pest Control | |||
| B002AT | Pest Control Services 3.1 (1,634,217 SF) COL 3 | 12 | MO |
| B002AU | Pest Control Services 3.1 (1,634,217 SF) COL 4 | 0 | MO |
| B002AV | Pest Pest Service Orders 3.2.1 | 10 | EA |
| B002AW | Pest Management Reporting 3.3 | 12 | MO |
| DLA Pest Total |
| DLA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| B003 | MFSC | ||
| B003AA | Emergency Service Orders, 3.1.1 | 5 | EA |
| B003AB | Urgent Service Orders 3.1.2 | 5 | EA |
| B003AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| B003AD | Major Service Orders 3.1.4 | 3 | EA |
| B003AE | Air handler (2 ea.) 3.2.1 | 12 | MO |
| B003AF | Condensing Units (2 ea.) 3.2.1 | 12 | MO |
| B003AG | RTU /elect heat (1 ea.) 3.2.1 | 12 | MO |
| B003AH | Exhaust Fan (20 ea.) 3.2.2 | 12 | MO |
| B003AJ | Scales (5 ea.) 3.2.3 | 12 | MO |
| B003AK | Fire Door Maintenance (15 ea.) 3.2.5.1.1 | 12 | MO |
| B003AL | Lifts (5 ea.) 3.2.6 | 12 | MO |
| B003AM | Air Compressor (3 ea.) 3.2.7 | 12 | MO |
| B003AN | Air Dehydration Units (4 ea.) 3.2.12 | 12 | MO |
| B003AP | Certification Boilers(1 ea.) 3.3.1 | 12 | MO |
| B003AQ | Certification Backflow (10 ea.) 3.3.2 | 12 | MO |
| B003AR | Certification Lifts (5 ea.) 3.3.3 | 12 | MO |
| B003AS | Boiler water treatment (1 ea.) 3.4.5 | 12 | MO |
| B003AT | Roof Maintenance (223,500 SF) 3.4.10 | 12 | MO |
| MFSC Sub Total |
| 1503020 Pest Control | |||
| B003AU | Pest Control Services 3.1 (228,802) COL 3 | 12 | MO |
| B003AV | Pest Control Services 3.1 (228,802) COL 4 | 0 | MO |
| B003AW | Pest Pest Service Orders 3.2.1 | 5 | EA |
| B003AX | Pest Management Reporting 3.3 | 12 | MO |
| MFSC Pest Total |
| MFSC GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| B004 | PPA | ||
| B004AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| B004AB | Urgent Service Orders, Spec item 3.1.2 | 60 | EA |
| B004AC | Routine Service Service Orders, Spec Item 3.1.3 | 150 | EA |
| B004AD | Major Service Orders 3.1.4 | 15 | EA |
| B004AE | Air handler unit (9 ea.) 3.2.1 | 12 | MO |
| B004AF | Chiller (2 ea.) 3.2.1 | 12 | MO |
| B004AG | Condensing unit (2 ea.) 3.2.1 | 12 | MO |
| B004AH | Boilers (3 ea.) 3.2.4 | 12 | MO |
| B004AJ | Fire Alarm (26 ea.) 3.2.5.1 | 12 | MO |
| B004AK | Fire suppression Hoods (2 ea.) 3.2.5.2 | 12 | MO |
| B004AL | Dry (17 ea.) 3.2.5.2 | 12 | MO |
| B004AM | Pre Action (1 ea.) 3.2.5.2 | 12 | MO |
| B004AN | Wet (31 ea.) 3.2.5.2 | 12 | MO |
| B004AP | Elevators (1 ea.) Hydraulic 3.2.6 | 12 | MO |
| B004AQ | Lifts (2 ea.) 3.2.6 | 12 | MO |
| B004AR | Air Compressor (14 ea.) 3.2.7 | 12 | MO |
| B004AS | Above Ground Storage Tanks (14 ea.) 3.2.10 | 12 | MO |
| B004AT | Certification Boilers (5 ea.) 3.3.1 | 12 | MO |
| B004AU | Certification Backflow (53 ea.) 3.3.2 | 12 | MO |
| B004AV | Certification Elevators (1 ea.) Hydraulic 3.3.3 | 12 | MO |
| B004AW | Certification Lifts (4 ea.) 3.3.3 | 12 | MO |
| B004AX | Grease traps (1 ea.) 3.4.1 | 12 | MO |
| B004AY | Exhaust Ducts Hoods (1 ea.) 3.4.2 | 12 | MO |
| B004AZ | HVAC water treatment (2 ea. Closed loop) 3.4.3 | 12 | MO |
| B004BA | Reverse Osmosis System (1 ea.) 3.4.6 | 12 | MO |
| B004BB | Roof Maintenance (360,020 SF) 3.4.10 | 12 | MO |
| PPA Sub Total | |||
| 1503020 Pest Control | |||
| B004BC | Pest Control Services 3.1 (1,219,769 SF) COL 3 | 12 | MO |
| B004BD | Pest Control Services 3.1 (1,219,769 SF) COL 4 | 0 | MO |
| B004BE | Pest Pest Service Orders 3.2.1 | 15 | EA |
| B004BF | Pest Management Reporting 3.3 | 12 | MO |
| PPA Pest Total |
| PPA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| B005 | VA | ||
| B005AA | Emergency Service Orders 3.1.1 | 3 | EA |
| B005AB | Urgent Service Orders 3.1.2 | 3 | EA |
| B005AC | Routine Service Orders 3.1.3 | 5 | EA |
| B005AD | Air handler (1 ea.) 3.2.1 | 12 | MO |
| B005AE | Condensing unit (1 ea.) 3.2.1 | 12 | MO |
| B005AF | Backflow (1 ea.) 3.3.2 | 12 | MO |
| VA SubTotal | |||
| 1503020 Pest Control | |||
| B005AG | Pest Control Services 3.1 (8,397 SF) COL 3 | 12 | MO |
| B005AH | Pest Control Services 3.1 (8,397 SF) COL 4 | 0 | MO |
| B005AJ | Pest Pest Service Orders 3.2.1 | 5 | EA |
| B005AK | Pest Management Reporting 3.3 | 12 | MO |
| VA Pest Total |
| VA GRAND TOTAL |
| TOTAL RECURRING WORK OPTION 1 YEAR |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Opt 1 Period Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-19-R-9223 |
| EXHIBIT B |
| Line Item 0004 Nonrecurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT -NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B718 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide one composite labor hour to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | ||||
| 1,000.00 | HR | |||||
| B701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELINs B701 and B702 | 1,500,000.00 | EA | $ 1.00 | $ 1,500,000.00 |
| B702 | Composite UPL Rate Work - Subject to the applicable Wage Rate Requirement ( Construction). MUST BE NEGOTIATED BY KO | Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 34,000.00 | HR | ||
| B703 | Construction Equipment Cost MUST BE NEGOTIATED BY KO. | Provide all construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2. Construction equipment requirements shall include a list of all construction equipment establishing the size, quality, number of units, and unit prices. This construction equipment is to support unit priced labor work. MUST BE NEGOTIATED BY KO. | 150,000.00 | EA | $ 1.00 | $ 150,000.00 |
| B704 | Emergency Service Orders | Provide labor and material to perform Emergency Service Order work. | 100 | EA | ||
| B705 | Urgent Service Orders | Provide labor and material to perform Urgent Service Order work. | 100 | EA | ||
| B706 | Routine Service Orders | Provide labor and material to perform Routine Service Order work. | 100 | EA | ||
| B707 | Major Service Orders | Provide labor and material to perform Major Service Order work. | 10 | EA | ||
| B708 | Roof Repair PVC Available DoD FedMall | Provide labor ands material to perform minor patch repair up to one square foot of PVC roofing. | 10 | EA | ||
| B709 | Roof Repair Hydro stop. Available DoD FedMall | Provide labor ands material to perform minor patch repair up to one square foot of Hydro stop roofing. | 10 | EA | ||
| B710 | Geothermal Services | Provide labor and material to perform an evaluation of the Geothermal systems, and provide a detailed report of findings and recommendations for each system. | 4 | EA | ||
| B711 | Mosquito Fogging Treatment Available DoD FedMall | Provide all labor and material to perform mosquito treatment. The contractor shall provide the application of a mosquito adulticide (ULV Formulation) at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item price. | 150 | MI | ||
| B712 | Mosquitos Larvae Treatment Available DoD FedMall | Provide all labor and material to perform mosquito larvae treatment. The contractor shall provide treatment at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. Larval control shall be obtain for seven days after first control action. The contractor shall maintain control for 30 days. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item price. | 1,000 | AC | ||
| B713 | Fire Ant Mound Treatment Available DoD FedMall | Provide all labor and material to perform fire ant treatment. The contractor shall provide fire ant treatment on the ant mounds at designated sites when directed by KO. The contractor shall respond and perform services within 24 hours after notification. Fire ant control shall be obtain for five days after first control action. The contractor shall maintain control for 30 days. All management, licensing, and certifications shall be in accordance with the requirements in Section C, 1503020 Pest Control. The rate for this Unit Priced Task (UPT) shall include all direct and indirect costs plus profit associated with the particular unit of work. All materials and equipment (rented, leased or Contractor-owned) required for the accomplishment of a UPT shall be included within this exhibit line item prices. The unit of issue "EA" is referenced for each mound. | 2,500 | EA | ||
| B714 | Replace Defective Ties Singly or in Clusters | Provide Labor and material to replace the defective tie clusters with cross-ties that match existing. Contractor shall install a crosstie at each marked location. Dispose of all spikes removed from the defective ties and install new spikes of proper size matching the size of existing tie plates. Ties shall be installed perpendicular to the rails and properly tamped and spiked. Ties shall be installed with the top of the tie (or the tie plate) in full contact with the base of the rail and the bottom of the tie near the rail seat in full contact with the ballast. | 100 | EA | ||
| B715 | Replace Defective Switch Timbers singly or in Clusters | Provide Labor and material to replace the defective switch timber clusters with switch timbers that match existing size. Contractor shall install a switch timber at each location marked. Dispose of all spikes removed from the defective ties and install new spikes of proper size matching the size of existing tie plates. Ties shall be installed perpendicular to the rails and properly tamped and spiked. Ties shall be installed with the top of the tie (or the tie plate) in full contact with the base of the rail and the bottom of the tie near the rail seat in full contact with the ballast. Replace Broken and Missing Bolts. | 100 | EA | ||
| B716 | Skim Raise Track and Turnouts | Provide labor and material to raise identified track segments ¼” (6mm), ballast, and regulate as detailed in the technical specifications. The purpose of the Skim Raise is to bring the ties and switch timbers into full contact with the rail and plates to maintain the gage and surface. | 500 | TF | ||
| B717 | Adjust Skewed Ties | Provide labor and material to adjust the skewed ties to be perpendicular to the rail. Correct the gage if not corrected by adjusting the ties. | 500 | TF | ||
| B718 | Re-gaging Turnouts, Clip Adjustment, and Switch Adjustment | Provide labor and material to perform Inspection of the turnouts for various gage defects and operational defects. The re-gaging task is intended to return the turnouts to correct gage, guardrail check gage, guardrail gage, layout dimensions, and switch throws to normal dimensions. The switch point clips on many of the turnouts have been shimmed to eliminate switch gapping. After the regaging and shim removal, the switch stands will be adjusted for proper operation and elimination of point gapping. | 500 | TF | ||
| TOTAL NONRECURRING WORK PRICE OPTION 1 YEAR |
ELIN-Option 2 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N400085-19-R-9223 |
| EXHIBIT C |
| Line Item 0005 Recurring Work Price - Option 2 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C005 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | Grand Total |
| 1502000 Facilities Investment | ||||||
| C001 | BASE | |||||
| C001AA | Emergency Service Orders 3.1.1 | 30 | EA | |||
| C001AB | Urgent Service Orders 3.1.2 | 65 | EA | |||
| C001AC | Routine Service Service Orders 3.1.3 | 215 | EA | |||
| C001AD | Major Service Orders 3.1.4 | 30 | EA | |||
| C001AE | Air Handler (34 ea.) 3.2.1 | 12 | MO | |||
| C001AF | Air Separator (4 ea.) 3.2.1 | 12 | MO | |||
| C001AG | Air Fluid Cooler (4 ea.) 3.2.1 | 12 | MO | |||
| C001AH | Chillers (8 ea.) 3.2.1 | 12 | MO | |||
| C001AJ | Condensing Unit (8 ea.) 3.2.1 | 12 | MO | |||
| C001AK | Energy Recovery Unit (3 ea.) 3.2.1 | 12 | MO | |||
| C001AL | Fluid cooler (2 ea.) 3.2.1 | 12 | MO | |||
| C001AM | Expansion tank (3 ea.) 3.2.1 | 12 | MO | |||
| C001AN | Heater Hot water coil (1 ea.) 3.2.1 | 12 | MO | |||
| C001AP | Heat Exchanger (1 ea.) 3.2.1 | 12 | MO | |||
| C001AQ | Heat Pump (36 ea.) 3.2.1 | 12 | MO | |||
| C001AR | HVAC Package Unit (4 ea.) 3.2.1 | 12 | MO | |||
| C001AS | Pumps (22 ea.) 3.2.1 | 12 | MO | |||
| C001AT | Exhaust Fans (4 ea.) 3.2.2 | 12 | MO | |||
| C001AU | Scales (2 ea.) 3.2.3 | 12 | MO | |||
| C001AV | Boilers(18 ea.) 3.2.4 | 12 | MO | |||
| C001AW | Fire Alarm (53 ea.) 3.2.5.1 | 12 | MO | |||
| C001AX | Fire Door Maintenance (153 ea.) 3.2.5.1.1 | 12 | MO | |||
| C001AY | Fire suppression Hoods (5 ea.) 3.2.5.2 | 12 | MO | |||
| C001AZ | Dry (6 ea.) 3.2.5.2 | 12 | MO | |||
| C001BA | Wet (130 ea.) 3.2.5.2 | 12 | MO | |||
| C001BB | Wet chemical (1 ea.) 3.2.5.2 | 12 | MO | |||
| C001BC | Fire Hydrants (369 ea.) 3.2.5.2 | 12 | MO | |||
| C001BD | Elevators (6 ea.) Hydraulic 3.2.6 | 12 | MO | |||
| C001BE | Lifts (16 ea.) 3.2.6 | 12 | MO | |||
| C001BF | Air Compressor (12 ea.) 3.2.7 | 12 | MO | |||
| C001BG | Generators (20 ea.) 3.2.8 | 12 | MO | |||
| C001BH | Automatic Transfer Units (12 ea.) 3.2.8.1 | 12 | MO | |||
| C001BJ | Catsclaw (1 ea.) 3.2.9 | 12 | MO | |||
| C001BK | Bollards barrier (5 ea.) 3.2.9 | 12 | MO | |||
| C001BL | Above Ground Storage Tanks (25 ea.) 3.2.10 | 12 | MO | |||
| C001BM | Air Dehydration Units (5 ea.) 3.2.12 | 12 | MO | |||
| C001BN | Certification Boilers(17 ea.) 3.3.1 | 12 | MO | |||
| C001BP | Certification Backflow (110 ea.) 3.3.2 | 12 | MO | |||
| C001BQ | Certification Elevators (6 ea.) Hydraulic 3.3.3 | 12 | MO | |||
| C001BR | Certification Lifts (16 ea.) 3.3.3 | 12 | MO | |||
| C001BS | Grease traps (4 ea.) 3.4.1 | 12 | MO | |||
| C001BT | Exhaust Ducts Hoods (6 ea.) 3.4.2 | 12 | MO | |||
| C001BU | HVAC water treatment (13 ea. Closed loops) 3.4.3 | 12 | MO | |||
| C001BV | Boiler Seasonal Startup and Shutdown (4 ea.) 3.4.4 | 12 | MO | |||
| C001BW | Boiler water treatment (12 ea.) 3.4.5 | 12 | MO | |||
| C001BX | Septic Tank (2 ea.) 3.4.7 | 12 | MO | |||
| C001BY | Chlorine Generator (1 ea.) 3.4.8 | 12 | MO | |||
| C001BZ | Water Softeners (19 ea.) 3.4.9 | 12 | MO | |||
| C001CA | Roof Maintenance (2,948,656 SF) 3.4.10 | 12 | MO | |||
| C001CB | VFD (8 ea.) 3.4.11 | 12 | MO | |||
| C001CC | Railroad Trackage (24.7 Miles) 3.4.12 | 12 | MO | |||
| C001CD | Railroad Trackage Vegetation Control (24.7 Miles) 3.4.12.1 | 12 | MO | |||
| Base Sub total | ||||||
| 1503020 Pest Control | ||||||
| C001CE | Pest Control Services 3.1.9 (3,518,536 SF) COL 3 | 12 | MO | |||
| C001CF | Pest Control Services 3.1.9 (3,518,536 SF) COL 4 | 0 | MO | |||
| C001CG | Pest Service Orders 3.2.1 | 60 | EA | |||
| C001CH | Pest Management Reporting 3.3 | 12 | MO | |||
| Base Pest Total |
| BASE GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| C002 | DLA | ||
| C002AA | Emergency Service Orders 3.1.1 | 5 | EA |
| C002AB | Urgent Service Orders 3.1.2 | 5 | EA |
| C002AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| C002AD | Major Service Orders 3.1.4 | 2 | EA |
| C002AE | Exhaust Fan (2 ea.) 3.2.2 | 12 | MO |
| C002AF | Scales (7 ea.) 3.2.3 | 12 | MO |
| C002AG | Fire Alarm (12 ea.) 3.2.5.1 | 12 | MO |
| C002AH | Fire Door Maintenance (112 ea.) 3.2.5.1.1 | 12 | MO |
| C002AJ | Fire suppression Wet (84 ea.) 3.2.5.2 | 12 | MO |
| C002AK | Fire pumps (2 ea.) 3.2.5.2 | 12 | MO |
| C002AL | Air Compressor (5 ea.) 3.2.7 | 12 | MO |
| C002AM | Generators (1 ea.) 3.2.8 | 12 | MO |
| C002AN | Automatic Transfer Units (1 ea.) 3.2.8.1 | 12 | MO |
| C002AP | Above Ground Storage Tanks (2 ea.) 3.2.10 | 12 | MO |
| C002AQ | Dust Collectors (2 ea.) 3.2.11 | 12 | MO |
| C002AR | Certification Backflow (4 ea.) 3.3.2 | 12 | MO |
| C002AS | Roof Maintenance (1,377,510 SF) 3.4.10 | 12 | MO |
| DLA Sub total |
| 1503020 Pest Control | |||
| C002AT | Pest Control Services 3.1 (1,634,217 SF) COL 3 | 12 | MO |
| C002AU | Pest Control Services 3.1 (1,634,217 SF) COL 4 | 0 | MO |
| C002AV | Pest Pest Service Orders 3.2.1 | 10 | EA |
| C002AW | Pest Management Reporting 3.3 | 12 | MO |
| DLA Pest Total |
| DLA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| C003 | MFSC | ||
| C003AA | Emergency Service Orders, 3.1.1 | 5 | EA |
| C003AB | Urgent Service Orders 3.1.2 | 5 | EA |
| C003AC | Routine Service Service Orders 3.1.3 | 10 | EA |
| C003AD | Major Service Orders 3.1.4 | 3 | EA |
| C003AE | Air handler (2 ea.) 3.2.1 | 12 | MO |
| C003AF | Condensing Units (2 ea.) 3.2.1 | 12 | MO |
| C003AG | RTU /elect heat (1 ea.) 3.2.1 | 12 | MO |
| C003AH | Exhaust Fan (20 ea.) 3.2.2 | 12 | MO |
| C003AJ | Scales (5 ea.) 3.2.3 | 12 | MO |
| C003AK | Fire Door Maintenance (15 ea.) 3.2.5.1.1 | 12 | MO |
| C003AL | Lifts (5 ea.) 3.2.6 | 12 | MO |
| C003AM | Air Compressor (3 ea.) 3.2.7 | 12 | MO |
| C003AN | Air Dehydration Units (4 ea.) 3.2.12 | 12 | MO |
| C003AP | Certification Boilers(1 ea.) 3.3.1 | 12 | MO |
| C003AQ | Certification Backflow (10 ea.) 3.3.2 | 12 | MO |
| C003AR | Certification Lifts (5 ea.) 3.3.3 | 12 | MO |
| C003AS | Boiler water treatment (1 ea.) 3.4.5 | 12 | MO |
| C003AT | Roof Maintenance (223,500 SF) 3.4.10 | 12 | MO |
| MFSC Sub Total |
| 1503020 Pest Control | |||
| C003AU | Pest Control Services 3.1 (228,802) COL 3 | 12 | MO |
| C003AV | Pest Control Services 3.1 (228,802) COL 4 | 0 | MO |
| C003AW | Pest Pest Service Orders 3.2.1 | 5 | EA |
| C003AX | Pest Management Reporting 3.3 | 12 | MO |
| MFSC Pest Total |
| MFSC GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| C004 | PPA | ||
| C004AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| C004AB | Urgent Service Orders, Spec item 3.1.2 | 60 | EA |
| C004AC | Routine Service Service Orders, Spec Item 3.1.3 | 150 | EA |
| C004AD | Major Service Orders 3.1.4 | 15 | EA |
| C004AE | Air handler unit (9 ea.) 3.2.1 | 12 | MO |
| C004AF | Chiller (2 ea.) 3.2.1 | 12 | MO |
| C004AG | Condensing unit (2 ea.) 3.2.1 | 12 | MO |
| C004AH | Boilers (3 ea.) 3.2.4 | 12 | MO |
| C004AJ | Fire Alarm (26 ea.) 3.2.5.1 | 12 | MO |
| C004AK | Fire suppression Hoods (2 ea.) 3.2.5.2 | 12 | MO |
| C004AL | Dry (17 ea.) 3.2.5.2 | 12 | MO |
| C004AM | Pre Action (1 ea.) 3.2.5.2 | 12 | MO |
| C004AN | Wet (31 ea.) 3.2.5.2 | 12 | MO |
| C004AP | Elevators (1 ea.) Hydraulic 3.2.6 | 12 | MO |
| C004AQ | Lifts (2 ea.) 3.2.6 | 12 | MO |
| C004AR | Air Compressor (14 ea.) 3.2.7 | 12 | MO |
| C004AS | Above Ground Storage Tanks (14 ea.) 3.2.10 | 12 | MO |
| C004AT | Certification Boilers (5 ea.) 3.3.1 | 12 | MO |
| C004AU | Certification Backflow (53 ea.) 3.3.2 | 12 | MO |
| C004AV | Certification Elevators (1 ea.) Hydraulic 3.3.3 | 12 | MO |
| C004AW | Certification Lifts (4 ea.) 3.3.3 | 12 | MO |
| C004AX | Grease traps (1 ea.) 3.4.1 | 12 | MO |
| C004AY | Exhaust Ducts Hoods (1 ea.) 3.4.2 | 12 | MO |
| C004AZ | HVAC water treatment (2 ea. Closed loop) 3.4.3 | 12 | MO |
| C004BA | Reverse Osmosis System (1 ea.) 3.4.6 | 12 | MO |
| C004BB | Roof Maintenance (360,020 SF) 3.4.10 | 12 | MO |
| PPA Sub Total | |||
| 1503020 Pest Control | |||
| C004BC | Pest Control Services 3.1 (1,219,769 SF) COL 3 | 12 | MO |
| C004BD | Pest Control Services 3.1 (1,219,769 SF) COL 4 | 0 | MO |
| C004BE | Pest Pest Service Orders 3.2.1 | 15 | EA |
| C004BF | Pest Management Reporting 3.3 | 12 | MO |
| PPA Pest Total |
| PPA GRAND TOTAL | |||
| 1502000 Facilities Investment | |||
| C005 | VA | ||
| C005AA | Emergency Service Orders 3.1.1 | 3 | EA |
| C005AB | Urgent Service Orders 3.1.2 | 3 | EA |
| C005AC | Routine Service Orders 3.1.3 | 5 | EA |
| C005AD | Air handler (1 ea.) 3.2.1 | 12 | MO |
| C005AE | Condensing unit (1 ea.) 3.2.1 | 12 | MO |
| C005AF | Backflow (1 ea.) 3.3.2 | 12 | MO |
| VA SubTotal | |||
| 1503020 Pest Control | |||
| C005AG | Pest Control Services 3.1 (8,397 SF) COL 3 | 12 | MO |
| C005AH | Pest Control Services 3.1 (8,397 SF) COL 4 | 0 | MO |
| C005AJ | Pest Pest Service Orders 3.2.1 | 5 | EA |
| C005AK | Pest Management Reporting 3.3 | 12 | MO |
| VA Pest Total |
| VA GRAND TOTAL |
| TOTAL RECURRING WORK OPTION 2 YEAR |
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood…