P9838_RFP.pdf
PDF 834 KB Posted
- Solicitation number
- N4008519R9124
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| P9838_Price_Proposal_Form_Amendment2.docx | DOCX document | |
| 1582438-spc1of1-AMEND0001.pdf | ||
| 1582438-Continuation_Sheet-AMEND0001R.pdf | ||
| Amendment_0001.pdf | ||
| Revised_P9838_Price_Proposal_Form.docx | DOCX document | |
| 1582438spc1of1.pdf | ||
| 1582438-02of33-CIVIL_1of11.pdf | ||
| 1582438-01of33-GENERAL_INFO-LIFE_SAFETY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION N40085-19-R-9124 DESIGN-BID-BUILD, P9838 AMBULATORY CARE CENTER, MARINE CORPS AIR STATION, NEW RIVER, NC
PROPOSALS ARE DUE ON FRIDAY, 09 AUGUST 2019, AT 2:00 PM EDT. REFER TO SECTION 00100 FOR PROPOSAL DELIVERY INFORMATION.
PRE-PROPOSAL INQUIRIES (PPI) CUT-OFF DATE AND TIME IS THURSDAY, 01 AUGUST 2019, AT 5:00 PM EST. ALL PPIs SHALL BE
SUBMITTED TO CRYSTAL CHATMON VIA EMAIL AT: CRYSTAL.CHATMON@NAVY.MIL.
MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $25,000,000 AND $100,000,000 IN ACCORDANCE WITH DFARS 236.204.
NAICS CODE IS 236220 – COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION, AND THE SMALL BUSINESS SIZE STANDARD IS $36,500,000.
THIS ACQUISITION IS BEING SOLICITED ON AN UNRESTRICTED BASIS WITH FULL AND OPEN COMPETITION.
WAGE DETERMINATION GENERAL DECISION NUMBER: NC20190038 01/04/2019
CRYSTAL Y. CHATMON 757-341-1999
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Jul-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________874 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008519R9124 46
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008519R9124
Section 00 00 00 - Procurement and Contracting Requirements
WAGE DETERMINATION
General Decision Number: NC20190038 01/04/2019
Superseded General Decision Number: NC20180038
State: North Carolina
Construction Type: Building
County: Onslow County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019
* IRON0848-005 02/01/2018
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.00 13.50
PLUM0421-003 07/01/2017
Rates Fringes
PIPEFITTER.......................$ 28.65 10.45
SUNC2011-019 08/24/2011
Rates Fringes
BRICKLAYER.......................$ 19.00 0.00
CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00
CARPENTER (Form Work Only).......$ 13.38 1.80
CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 16.39 4.26
CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00
ELECTRICIAN......................$ 20.64 6.68
HVAC MECHANIC (HVAC Duct Installation Only)...............$ 17.37 1.82
LABORER: Common or General......$ 11.13 0.32
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.47 2.41
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 12.35 0.00
PLUMBER..........................$ 18.48 3.93
ROOFER...........................$ 11.75 1.06
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40
TRUCK DRIVER.....................$ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00 10 00 - Solicitation
INSTRUCTIONS TO OFFERORS
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 NAVY ELECTRONIC COMMERCE ONLINE (NECO)
5. ATTACHMENTS: Will be located on FBOunder additional documents
5.1 PRE-PROPOSAL INQUIRY LOG (ATTACHMENT A)
5.2 SEC-NAV_5512_1_11787- One Day Past Request (ATTACHMENT B)
5.3 CONSTRUCTION EXPERIENCE AND PROJECT DATA SHEET (ATTACHMENT C)
5.4 PAST PERFORMANCE QUESTIONAIRE (ATTACHMENT D)
5.5 SMALL BUSINESS SUBCONTRACTING PLAN (ATTACHMENT E)
1. GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.1.1 This solicitation is being issued as Full and Open Competition
1.1.2 The NAICS code for this procurement is 236220 and the size standard is $36.5M
1.1.3 This acquisition will be advertised utilizing FAR Part 15 –Contracting by Negotiations Resulting in a Firm Fixed Price (FFP) contract for construction services
1.1.4 Magnitude of Construction: Between $25,000,000-$100,000,000
1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS
The project constructs a 44,000 SF construct an Ambulatory Care Clinic to incorporate the Marine Centered Medical Home concept for Marine Active Duty personnel at MCAS New River. Supporting facilities include utilities, site improvements, facility special foundations, parking, antiterrorism force protection measures, demolition, and environmental protection measures. Existing building AS100 will be demolished. The project will be designed in accordance with Unified Facilities Criteria (UFC) 4-510-01 Design: Military Medical facilities, UFC 1-200-01 General Building Requirements, UFC 1-200-02 High Performance and Sustainable Building Requirements, UFC 4- 010-01 DoD Minimum Antiterrorism Standards for Buildings, barrier free design in accordance with Architectural Barriers Act (ABA) Accessibility Standard and DEPSECDEF Memorandum “Access for People with Disabilities” dated 10/31/2008, and MHS World Class principles per World Class Checklist Requirements. Operations and Maintenance Manuals, Enhanced Commissioning, and Comprehensive Interior Design will be provided.
Demolition: Demolition of AS-100, existing medical/dental clinic. Function within demolition to be relocated into new facility and demolished areas returned to a natural state.
1.2.1 Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and email address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contract information current.
2. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
4. In order to permit efficient competition, the Navy will utilize the following methodology. Proposals will initially be screened for price and placed in order (lowest price to highest price). The Navy will then evaluate the technical factors of the lowest priced proposal. In the event the proposal is deemed Unacceptable, the process described will be conducted again as many times as necessary, until such time as the Government identifies a technical acceptable proposal. The Navy will make award to the lowest priced technically acceptable proposal from among the lowest priced proposals. However, the Navy, at its sole discretion, reserves the right to increase the number of proposals it will review under this methodology. Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both technical and price) for the purpose of establishing a competitive range.
5. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award.
An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.
3. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
Price binder: price shall be submitted on the Price Proposal Form included in the solicitation.
The offeror shall submit one (1) original, marked “Original”, and one (1) copy, marked “Copy”, each in a separate three ring binder with the following:
Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, cage code, point of contact (POC), POC phone number, and POC email address;
Completed SF 1442 signed with all amendments acknowledged;
Price Proposal Form;
Copy of Representation and Certifications and proof of registration in System for
Award Management (SAM);
Confirmation of filing of Veterans' Employment and Training (VETS)
VETS-4212 for the 2017 filing cycle.
Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee.
Amount shall be at least 20 percent of the proposed price, but shall not to exceed $3 million;
Responsibility Determination information (see below) Small Business Subcontracting Plan (see below)
The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line item numbers (CLINs).
In the event of a discrepancy between the original and copies, the original version of the proposal will govern.
Furthermore, any price information within the technical proposal (non-price proposal) will not be considered.
Likewise, any technical/non-price information within the price proposal will not be considered.
PLEASE NOTE: Electronic submission of ONLY the PRICE PROPOSAL FORM (See FBO Website for Form under additional documents) is hereby authorized and will be accepted on the Proposal due date by no later than 2:00 p.m. See 4.2.1 Proposal Requirements for additional information.
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION – In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
SMALL BUSINESS SUBCONTRACTING PLAN INFORMATION – reference FAR 52.219-9 Alt II and DFARS 252.219-7003).
NAVFAC’s command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition.
Offerors representing as other than small businesses shall establish small business subcontracting plan goals and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 45%
SDB 3%
HUBZone SB 5%
WOSB 5%
SBVOSB 15%
Small businesses identified by name shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e).
See the Small Business Subcontracting Plan Template (Attachment E) for format.
(1) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00700 of the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Technical Factors:
Non-price binder: The offeror shall submit one (1) original, marked “Original”, and four (4) copies, marked “Copy”, each in a separate three ring binder with the following:
Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and Email Address;
8 ½ x 11 paper, 12-point font;
Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated;
Additionally, include an electronic version of the price and non-price proposals on one CD-
ROM.
As with the price proposal, in the event of a discrepancy between the original and copies (or CD-ROM), the original version of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered.
(b) Non-cost/price Factors:
Factor 1 – Corporate Experience:
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information:
Submit a minimum of two (2) up to a maximum of five (5) relevant construction projects that best demonstrates experience on relevant projects that are similar in size, scope and complexity to the RFP. For the purposes of this evaluation, a relevant project is further defined as:
Size: Building with a total square footage of 10,000 SF or greater.
Scope: New construction of a dental facility or a medical mixed-use medical facility. Renovations will not be considered.
Complexity: Experience managing a multi-storied project on a constrained or congested site.
Projects submitted for the offeror shall be completed within the past seven (7) years of the date of issuance of this
RFP.
Ensure that the project description clearly identifies whether the project is new construction or repair/renovation, addresses how the project meets the size, scope, and complexity requirements as delineated above, and provides the final construction cost.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather offerors shall submit the work performed under a task order as a project. Projects which are not complete as of the date of issuance of this RFP shall not be considered by the SSEB.
The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium.
Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two(2) single-sided pages). The Government will not consider information beyond this page limit.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). Projects that are not sufficiently described so as to demonstrate compliance with the above Size, Scope, and Complexity requirements may be deemed not relevant.
If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined.
If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
Experience of proposed subcontractors will not be considered. Likewise, the offeror’s experience as a subcontractor will not be considered.
(ii) Basis of Evaluation:
The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant construction as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects total. Any projects submitted in excess of the first five (5) for Corporate Experience will not be considered. An offeror that does not submit a minimum of two (2) relevant projects as defined above will receive a rating of “Unacceptable” and will not be eligible for award unless corrected through discussions, if held.
Factor 2 – Safety
(2) Factor 2, Safety:
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)
Experience Modification Rate (EMR): Include three previous complete calendar years’ (2016, 2017, 2018) worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, the offeror must affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends must be addressed as part of the factor submission.
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: Submit three previous complete calendar years’ (2016, 2017, 2018) worth of data. If an offeror cannot submit an OSHA DART, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA and DART data negatively must be addressed as part of this factor submission.
Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ (2016, 2017, 2018) worth of data. If an offeror cannot submit TRC rates, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data negatively must be addressed as part of this factor submission.
Technical Approach for Safety: The technical approach to safety narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages), and must address all items below.
The offeror shall describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
The offeror shall fully describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.
The offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
The offeror shall describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(ii) Basis of Evaluation: The evaluation will collectively consider the following:
Experience Modification Rate (EMR) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Total Recordable Case (TRC) Rates Offeror Technical Approach to Safety Other sources of information available to the Government
Experience Modification Rate (EMR): For the three previous complete calendar years the offeror will submit EMR.
If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates: For the three previous complete calendar years (2016, 2017, 2018), the offeror will submit their OSHA DART, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
Total Recordable Case (TRC) Rates: For the three previous complete calendar years (2016, 2017, 2018), the offeror will submit their TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration.
If unable to submit TRC rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the TRC rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.
(c) Past Performance
(1) Factor 3, Past Performance:
(i) Solicitation Submittal Requirements:
FOR EACH PROJECT SUBMITTED WITH ITS PROPOSAL FOR FACTOR 1 – CORPORATE EXPERIENCE, IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE
PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 – Corporate Experience. AN OFFEROR SHALL NOT
SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror must complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Crystal Chatmon, via email at crystal.chatmon@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror. It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Offerors are strongly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Offerors are also strongly encouraged to address any adverse past performance issues. Such explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
Performance award or additional information submitted will not be considered.
(ii) Basis of Evaluation:
This evaluation focuses on how well the offeror performed on the relevant projects submitted under Factor 1 – Corporate Experience and past performance on other relevant projects currently documented in known sources.
The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance including, but not limited to:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand and
- A respect for stewardship of Government funds
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the
Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT:
DATE & TIME: Tuesday, 16 July 2019, at 9:00am EST LOCATION: Building 1005, Michael Road, Camp Lejeune POC: Rachel Ashton via email at rachel.a.ashton@navy.mil
A pre-proposal conference/site visit will be held on: Tuesday, 16 July 2019, at 9:00am EST. Participants shall meet at Building 1005, Michael Road, Camp Lejeune no later than 9:00AM Local Time. All participants shall submit a list of attendees to Rachel Ashton via email at rachel.a.ashton@navy.mil no later than 1:00 PM Local Time on Thursday, July 11, 2019. This list should also indicate whether each attendee has Base access or will require sponsorship at the Visitor’s Center on the day of the site visit. All participants without DBIDS access to Camp Lejeune shall list the name of each attendee exactly as it appears on the ID to be presented at the Visitor’s Center.
Participants requiring sponsorship should be aware that wait times at the Visitor’s Center vary, but can be as long as two hours, and that the site visit will begin promptly at 9:00AM without delay.
4.2 PROPOSAL SUBMISSION INSTRUCTIONS: In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for each Factor and as described in this Solicitation and as follows:
4.2.1 The Price Proposal and the Non-Cost/Price Proposal shall be submitted in separate 3-ring binders. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor. Price and Non-Cost/Price Proposals must be submitted in sealed envelopes/boxes. Any pricing information included in the Non-Cost/Price Proposal will not be considered.
Similarly, any Non-Cost/Price information included in the Price Proposal will not be considered. Proposals shall be labeled “PRICE PROPOSAL OR NON-COST/PRICE PROPOSAL FOR RFP N40085-19-R-9124, ATTN:CRYSTAL CHATMON; DO NOT OPEN IN MAIL ROOM”.
PLEASE NOTE: Electronic submission of ONLY the PRICE PROPOSAL FORM (See FBO Website for Form under additional documents) is hereby authorized and will be accepted on the Proposal due date by no later than 2:00 p.m. The Forms SHALL be submitted via email to the following:
Crystal.chatmon@navy.mil: SUBJECT LINE OF EMAIL: N4008519R9124- P9838 PRICE PROPOSAL
FORM
If an offeror chooses to submit Price Proposal Form via e-mail, then such offeror does not need to include these forms within the hard copy (or CD-ROM copy) of the full price and non-price proposals to be mailed or hand delivered.
Email shall be received by no later than 2:00 p.m. on the proposal due date – late submissions may be consider late as prescribed in FAR 15.208.
4.2.2 The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated herein, for non-conformance may result in an unfavorable proposal evaluation.
4.2.3 All proposals shall be mailed or hand carried to the following address: Naval Facilities Engineering Command, Mid-Atlantic
Naval Facilities Engineering Command, Mid-Atlantic, Acquisition, ACQ21
9324 Virginia Avenue Building Z-140, Room 225 Norfolk, VA 23511-3624 Attn: Crystal Chatmon
4.2.4 Hand Carried Proposals: Offerors who would like to hand deliver their proposal and who do not currently have a valid badge issued by the Department of Defense (DoD) to enter Naval Station Norfolk must do the following:
Submit the completed one day pass request PDF document (form SEC-NAV_5512_1_11787 (Attachment B) NO LESS THAN 10 BUSINESS DAYS prior to the proposal due date. The pass request is upload under Additional Documents in FBO. The request form shall be completed in its entirety and sent to Crystal Chatmon at crystal.chatmon@navy.mil. Note that Item 25, BASE SPONSER’S NAME should include the following name and telephone number: CRYSTAL CHATMON (757-341-1999). This request is separate from the site visit request. The PDF document is uploaded with this solicitation under Additional Documents Present the following information at the pass office: Two forms of ID (i.e. Valid Driver’s License and (one of the following) US Social Security Card or Birth Certificate), , Current Vehicle Registration and/or Rental Car Contract, Current State Safety Inspection, Current Proof of Insurance.
Naval Station Norfolk Pass & ID Office is located in Bldg. CD9 at 9040 Hampton Boulevard across from Gate 5.
All potential offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level security at the Naval Station Norfolk may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval Station also increases. Early arrival is advised. To verify identity, visitors MUST present a second form of identification at the pass office format he list of A or B Documents found at http:www.uscis.gov/i-9-central/acceptable-documents. Submission of a pass request form is no guarantee you will be able to get on the base. If for any reason you get to the gate and are not allowed onto the base (even if you have submitted a request form), you will need to find another way to get your proposal delivered. Government personnel may not be able to sponsor you on base to deliver your proposal. Ultimately, it is the contractor's responsibility to ensure timely proposal submission to the specified location. Due to heightened security, it is recommended that you allow sufficient time to get into the building and turn in your proposal. The submitted pass request only allows access on the proposal due date. If the proposal due date is extended, it is the contractor's responsibility to work with the Government to revise the date on the pass request. Submission of a new pass request may not be necessary. If any other information listed on a submitted pass request form changes, a new pass request form with the updated information must be submitted.
4.2.5 PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR PROPOSAL MUST BE
RECEIVED NO LATER THAN THE DATE AND TIME SPECIFIED IN BLOCK 13A OF THE SF1442.
Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors - Competitive Acquisitions” and may be rejected.
4.3 PRE-PROPOSAL INQUIRIES (PPIs) (ATTACHMENT A): All inquiries must be submitted in writing and received by the Contract Specialist by 01 August 2019 at 5:00pm EST in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to crystal.chatmon@navy.mil. Use of the PPI Log template is required.
This is the start of the file's text. The full file is on GovTribe.