1582438-spc1of1-AMEND0001.pdf
PDF 3 MB Posted
- Solicitation number
- N4008519R9124
About this file
1582438-spc1of1-AMEND0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| P9838_Price_Proposal_Form_Amendment2.docx | DOCX document | |
| 1582438-Continuation_Sheet-AMEND0001R.pdf | ||
| Amendment_0001.pdf | ||
| Revised_P9838_Price_Proposal_Form.docx | DOCX document | |
| 1582438spc1of1.pdf | ||
| 1582438-02of33-CIVIL_1of11.pdf | ||
| P9838_RFP.pdf | ||
| 1582438-01of33-GENERAL_INFO-LIFE_SAFETY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-9838 Ambulatory Care Center / Dental Clinic 1582438 MCAS New River
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 22 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 56 14 CLAY BARRIER LAYER
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 12 13 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 43 00 SLOTTED CHANNEL FRAMING SYSTEMS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
PROJECT TABLE OF CONTENTS Page 1 July 18, 2019
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 42 29 AUTOMATIC ENTRANCES
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 66 23 RESINOUS MATRIX TERRAZZO FLOORING (ALTERNATE)
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 11 - EQUI PMENT
11 27 13 RADIOGRAPHIC DARKROOM EQUIPMENT
PROJECT TABLE OF CONTENTS Page 2
11 47 00 ICE MACHINES
11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT
11 71 00 WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT
11 72 13 MEDICAL EQUIPMENT, MISCELLANEOUS
11 74 00 DENTAL EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 35 70 HEALTHCARE CASEWORK
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 48 PREFABRICATED AUDIOMETRIC ROOMS
13 49 10 X-RAY SHIELDING
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 70 PLUMBING, HEALTHCARE FACILITIES
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 46.00 20 LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR
OUTPUT)
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
PROJECT TABLE OF CONTENTS Page 3
AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 20 SINGLE OPERATION GENERATOR SETS
26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
27 52 24 NURSE CALL SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76.00 22 INTERIOR COMBINATION EMERGENCY COMMUNICATIONS SYSTEMS
DI VI SI ON 31 - EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.13 CHEMICAL TERMITE CONTROL
31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 15 CONCRETE BLOCK PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 31 26 WIRE FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
PROJECT TABLE OF CONTENTS Page 4
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 61 14 EXTERIOR BURIED PREINSULATED CHILLED WATER PIPING
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
ATTACHMENT LIST
This report lists all attachments in the text.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION SUBPART ATTACHMENT
01 30 00 1.8.1 NAVFAC Redzone Checklist-POAM Items 01 30 00 1.8.2 NAVFAC Redzone Facility Turnover Planning
Meetings 01 30 00 1.11 Performance Assessment Plan 01 33 00 1.8 Appendix A - Submittal Register 01 35 26 3.10 Contractor Electrical Energized Work Permit 01 45 00.00 20 1.3 Quality Control Reports 01 45 00.00 20 3.2 Acceptance Testing of Critical Systems 01 45 35 1.2 Statement of Special Inspections 01 45 35 1.2 Schedule of Special Inspections 01 58 00 1.4 project sign detail 01 78 00 1.7 Attachment A MCIEAST - MCB CAMLEJ
SPECIFICATIONS FOR GEOSPEATIAL DATA
DELIVERABLES
01 78 00 3.5 Draft DD FORM 1354 01 78 00 3.5 Interim DD FORM 1354 01 78 24.00 20 2.3 eOMSI Facility Data Workbook 01 91 00.15 22 3.1.2 Commissioning Plan
01 91 00.15 22 3.3.2 APPENDIX A -COMMISSIONING PLAN
07 05 23 3.5.7 Pressure Test Data Analysis 07 05 23 3.10 Appendix A - Air Leakage Test Form 07 05 23 3.10 Appendix B - Air Leakage Test Results Form 07 05 23 3.10 Appendix C - Test Agency Qualifications
Sheet 08 71 00 3.6 Hardware Set Schedule 10 14 00.10 1.2 Exterior Signage Schedule 10 14 00.20 1.4.2 Interior Signage Schedule
25 08 10 3.4.2 ATTACHMENT A
25 10 10 1.6 QC Checklist 31 62 13.20 1.6.3 Pile and Driving Equipment Data Form 31 62 13.20 3.4.3 pile driving log 33 40 00 3.12.2.2 LID Verification Report
Attachment List Page 1
MCAS New River 4:34 PM
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment List Page 2
07/18/2019 SEALS PAGE – Page 1
SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
1.1.1 Architect, Interiors, and Wayfinding
Thomas Briggs
07/18/2019
1.1.2 Civil Engineer – Transportation, Site Design
Christopher C. Moore
06/26/2019
1.1.3 Civil Engineer – Storm Water Design
John G. Drake
07/18/2019 SEALS PAGE – Page 2
1.1.4 Civil Engineer –Water and Sewer Design
Timothy P. Anderson
1.1.5 Geotech Engineer – Geotech and Surcharge Design
Ian J. Chaney
1.1.6 Landscape Architect
David L. Patterson
Ian Chaney
Tim Anderson
07/18/2019 SEALS PAGE – Page 3
1.1.7 Structural Engineer
Larry A. Johnson
1.1.8 ATFP Engineer
Weiying S. Chiang
1.1.9 Mechanical Engineer
James S. Buckley
07/18/2019 SEALS PAGE – Page 4
1.1.10 Life Safety, Fire Protection Engineer
Robert S. Hicks
1.1.11 Plumbing, Electrical, and Telecommunications Engineer
Jonathan Carter
END OF SEALS PAGE
PROGRESS SET FOR REVIEW ONLY
THESE DOCUMENTS ARE FOR
DESIGN REVIEW AND NOT
INTENDED FOR CONSTRUCTION,
BIDDING, OR PERMIT PURPOSES.
THEY WERE PREPARED BY OR
UNDER SUPERVISION OF:
DOUGLAS T. CALHOUN
4/17/
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are represented in multiple bindings as enumerated below:
BINDING 1 contains the following:
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GI001 12794493 COVER SHEET - BINDING 1
GI011 12794494 BINDING INDEX - BINDING 1
GI021 1 12794495 INDEX OF DRAWINGS - BINDING 1
GI022 12794496 INDEX OF DRAWINGS - BINDING 2
GI023 12794497 INDEX OF DRAWINGS - BINDING 3
GI024 12794498 INDEX OF DRAWINGS - BINDING 3
GI100 12794499 PROJECT INFORMATION
GI101 12794500 SHEET NAMING SYSTEM DIAGRAMS
GI102 12794501 LIFE SAFETY CODE COMPLIANCE INFORMATION
GI110 1 12794502 LIFE SAFETY SITE PLAN
GI111 12794503 LIFE SAFETY PLAN - LEVEL 01 OVERALL
GI112 12794504 LIFE SAFETY PLAN - LEVEL 02 OVERALL
C-001 12794505 KEY PLAN
C-002 12794506 ABBREVIATIONS, SYMBOLS LEGEND
V-101 12794507 EXISTING CONDITIONS PLAN
V-102 12794508 EXISTING CONDITIONS PLAN
V-103 12794509 EXISTING CONDITIONS PLAN
DOCUMENT 00 01 15 Page 1
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
V-104 12794510 EXISTING CONDITIONS PLAN
V-105 12794511 EXISTING TREE INVENTORY PLAN
V-106 12794512 EXISTING TREE INVENTORY PLAN
V-107 12794513 EXISTING TREE INVENTORY PLAN
V-108 12794514 EXISTING TREE INVENTORY PLAN
V-109 12794515 EXISTING TREE INVENTORY PLAN
V-601 12794516 EXISTING TREE INVENTORY SCHEDULE
V-602 12794517 EXISTING TREE INVENTORY SCHEDULE
V-701 12794518 BLDG AS4020-SITE DEMOLITION PLAN
V-702 12794519 BLDG AS4020-SITE DEMOLITION PLAN
CD101 12794520 SITE DEMOLITION PLAN
CD102 12794521 SITE UTILITY DEMOLITION PLAN
CD103 12794522 SITE DEMOLITION LIMITS PLAN
CD104 1 12794523 BUILDING AS100 SITE DEMOLITION PLAN
CD105 1 12794524 BUILDING AS100 SITE UTILITY DEMOLITION PLAN
CD106 1 12794525 BUILDING AS100 SITE GRADING PLAN-BID ALTERNATE 9
CD107 1 12794526 BUILDING AS100 SITE GRADING PLAN-BID ALTERNATE 4
CD108 12794527 BUILDING AS100 SITE DEMOLITION LIMITS PLAN
CD601 12794528 SITE DEMOLITION SCHEDULE
CS101 12794529 SITE PLAN
CS102 12794530 SITE PLAN
CS103 12794531 DRAINAGE PLAN
CS121 12794532 ALIGNMENT GEOMETRY PLAN
CS122 12794533 ALIGNMENT GEOMETRY REPORT
CS123 12794534 ALIGNMENT GEOMETRY PLAN
CS124 12794535 CURB DATA PLAN
DOCUMENT 00 01 15 Page 2
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
CS131 12794536 SIGNING AND PAVEMENT MARKING PLAN
CS201 12794537 ROADWAY PROFILE
CS211 12794538 DRAINAGE PROFILES
CS212 12794539 DRAINAGE PROFILES
CS213 12794540 DRAINAGE PROFILES
CS214 12794541 COMMUNICATION DUCT BANK PROFILE
CS301 12794542 TYPICAL SECTIONS
CS302 12794543 SITE SECTIONS
CS303 12794544 TYPICAL SECTIONS
CS304 12794545 STORMWATER DETAILS - STORMWATER SAND FILTER SF-1
CS305 12794546 STORMWATER DETAILS - STORMWATER SAND FILTER SF-2
CS501 12794547 SITE DETAILS
CS502 12794548 SITE DETAILS
CS503 12794549 SITE DETAILS
CS504 12794550 SITE DETAILS
CS505 12794551 SITE DETAILS
CS506 12794552 SITE DETAILS
CS507 12794553 SITE DETAILS
CS508 12794554 SITE DETAILS
CS509 12794555 SITE DETAILS
CS510 12794556 SITE DETAILS
CS511 12794557 SITE DETAILS
CS512 12794558 SITE DETAILS
CS513 12794559 SITE DETAILS
CS514 12794560 SITE DETAILS
CS515 12794561 SIGNING AND PAVEMENT MARKING DETAILS
DOCUMENT 00 01 15 Page 3
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
CS516 12794562 SIGNING AND PAVEMENT MARKING DETAILS
CS517 12794563 SIGNING AND PAVEMENT MARKING NOTES, LEGEND AND
DETAILS
CS518 12794564 SITE DETAILS
CS601 12794565 CURB DATA SCHEDULE
CS602 12794566 EXISTING DRAINAGE AND SANITARY SCHEDULE
CS603 12794567 DRAINAGE DESCRIPTIONS
CG101 12794568 GRADING PLAN
CU001 12794569 WATER AND SEWER UTILITY NOTES
CU101 1 12794570 WATER AND SEWER UTILITY PLAN
CU201 1 12794571 WATER PROFILES
CU202 1 12794572 SEWER PROFILES
CU501 12794573 UTILITY DETAILS
CU502 12794574 UTILITY DETAILS
CU503 12794575 UTILITY DETAILS
CU504 12794576 UTILITY DETAILS
CU505 1 12794577 UTILITY DETAILS
CU506 12794578 UTILITY DETAILS
CU601 12794579 UTILITIES SCHEDULE
GC002 12794580 EROSION AND SEDIMENT CONTROL NOTES
GC003 12794581 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
GC004 12794582 EROSION AND SEDIMENT CONTROL INSPECTION NOTES
GC005 12794583 STORMWATER MANAGEMENT AND MAINTENANCE NOTES
GC006 12794584 DRAINAGE AREA MAP
GC101 12794585 SITE CONSTRUCTION PHASE I
GC102 12794586 SITE CONSTRUCTION PHASE II
GC103 12794587 SITE CONSTRUCTION PHASE III
DOCUMENT 00 01 15 Page 4
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GC104 12794588 SITE CONSTRUCTION PHASE III
GC105 12794589 SITE CONSTRUCTION PHASE IV
GC106 12794590 SITE CONSTRUCTION PHASE V
GC107 1 12794591 SITE CONSTRUCTION PHASE VI
GC108 12794592 TEMPORARY SEWER PLAN
GC109 12794593 EROSION AND SEDIMENT CONTROL PHASE I
GC110 12794594 EROSION AND SEDIMENT CONTROL PHASE II
GC111 12794595 EROSION AND SEDIMENT CONTROL PHASE III
GC112 12794596 EROSION AND SEDIMENT CONTROL PHASE III
GC113 12794597 EROSION AND SEDIMENT CONTROL PHASE IV
GC114 12794598 EROSION AND SEDIMENT CONTROL PHASE V
GC115 1 12794599 EROSION AND SEDIMENT CONTROL PHASE VI
GC201 1 12794600 TEMPORARY SEWER PROFILE
GC501 12794601 EROSION AND SEDIMENT CONTROL DETAILS
GC502 12794602 EROSION AND SEDIMENT CONTROL DETAILS
GC503 12794603 EROSION AND SEDIMENT CONTROL DETAILS
GC504 12794604 EROSION AND SEDIMENT CONTROL DETAILS
LP101 12794605 LANDSCAPE PLAN
LP501 12794606 SITE FURNITURE AND LANDSCAPE AMENITIES
LP502 12794607 LANDSCAPE DETAILS
LP601 12794608 MASTER PLANT SCHEDULE AND GENERAL NOTES
B-001 12794609 BORING NOTES AND LEGEND
B-101 12794610 SURCHARGE PLAN DETAILS AND NOTES
B-102 12794611 BORING PLAN
BB601 12794612 BORING LOGS
BB602 12794613 BORING LOGS
DOCUMENT 00 01 15 Page 5
DRAWING
NO.
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
BB603 12794614 BORING LOGS
BB604 12794615 BORING LOGS
BB605 12794616 BORING LOGS
BB606 12794617 BORING LOGS
BB607 12794618 BORING LOGS
BB608 12794619 BORING LOGS
BB609 12794620 BORING LOGS
BB610 12794621 BORING LOGS
BB611 12794622 BORING LOGS
BB612 12794623 BORING LOGS
BB613 12794624 BORING LOGS
BB614 12794625 BORING LOGS
BB615 12794626 BORING LOGS
BB616 12794627 BORING LOGS
BB617 12794628 BORING LOGS
BB618 12794629 BORING LOGS
BB619 12794630 BORING LOGS
BB620 12794631 BORING LOGS
BB621 12794632 BORING LOGS
BB622 12794633 BORING LOGS
BB623 12794634 BORING LOGS
BINDING 2 contains the following:
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GI002 12794635 COVER SHEET - BINDING 2
GI012 12794636 BINDING INDEX - BINDING 2
DOCUMENT 00 01 15 Page 6
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GI021 12794637 INDEX OF DRAWINGS - BINDING 1
GI022 1 12794638 INDEX OF DRAWINGS - BINDING 2
GI023 12794639 INDEX OF DRAWINGS - BINDING 3
GI024 12794640 INDEX OF DRAWINGS - BINDING 3
S-001 12794641 GENERAL NOTES
S-002 12794642 GENERAL NOTES
S-501 12794643 TYPICAL DETAILS
S-502 12794644 TYPICAL DETAILS
S-503 12794645 TYPICAL DETAILS
S-504 12794646 TYPICAL DETAILS
S-505 12794647 TYPICAL DETAILS
S-506 12794648 TYPICAL DETAILS
S-507 12794649 TYPICAL DETAILS
S-508 12794650 TYPICAL DETAILS
S-509 12794651 TYPICAL DETAILS
SB111 12794652 FOUNDATION PLAN - SECTOR 01
SB112 12794653 FOUNDATION PLAN - SECTOR 02
SB113 12794654 PARTIAL FOUNDATION & FRAMING PLANS - CANOPY
SF121 12794655 FRAMING PLAN - SECTOR 01
SF122 12794656 RAFTER FRAMING PLAN - SECTOR 01
SF123 12794657 FRAMING PLAN - SECTOR 02
SF124 12794658 RAFTER FRAMING PLAN - SECTOR 02
SF131 12794659 FRAMING PLAN - SECTOR 01
SF132 12794660 RAFTER FRAMING PLAN - SECTOR 01
SB301 12794661 SECTIONS & DETAILS
SB302 12794662 SECTIONS & DETAILS
DOCUMENT 00 01 15 Page 7
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
SB303 12794663 SECTIONS & DETAILS
SF301 12794664 SECTIONS & DETAILS
SF302 12794665 SECTIONS & DETAILS
SF303 12794666 SECTIONS & DETAILS
SF304 12794667 SECTIONS & DETAILS
SF401 12794668 ENVELOPE STRUCTURAL ELEVATION
SF501 12794669 ENVELOPE STRUCTURAL DETAILS
AS01 12794670 ARCHITECTURAL SITE PLAN
A-01 12794671 ABBREVIATIONS, SYMBOL LEGEND
A-12 12794672 FUNCTIONAL FLOOR PLANS
A-13 12794673 FUNCTIONAL FLOOR PLANS ROOF LEVEL
A-111 1 12794674 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1
A-112 1 12794675 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2
A-121 1 12794676 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1
AF121 12794677 FIRE PROTECTION PLAN - LEVEL 2 - SECTOR 1
AI111A 12794678 PARTIAL RCP - LEVEL 1 - QUADRANT 1A
AI111B 12794679 PARTIAL RCP - LEVEL 1 - QUADRANT 1B
AI111C 12794680 PARTIAL RCP - LEVEL 1 - QUADRANT 1C
AI111D 12794681 PARTIAL RCP - LEVEL 1 - QUADRANT 1D
AI112A 12794682 PARTIAL RCP - LEVEL 1 - QUADRANT 2A
AI112B 12794683 PARTIAL RCP - LEVEL 1 - QUADRANT 2B
AI112C 12794684 PARTIAL RCP - LEVEL 1 - QUADRANT 2C
AI112D 12794685 PARTIAL RCP - LEVEL 1 - QUADRANT 2D
AI121A 1 12794686 PARTIAL RCP - LEVEL 2 - QUADRANT 1A
AI121B 1 12794687 PARTIAL RCP - LEVEL 2 - QUADRANT 1B
AI121C 12794688 PARTIAL RCP - LEVEL 2 - QUADRANT 1C
DOCUMENT 00 01 15 Page 8
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
AI121D 12794689 PARTIAL RCP - LEVEL 2 - QUADRANT 1D
AI401 12794690 EQUIPMENT ELEVATIONS
AI402 12794691 EQUIPMENT ELEVATIONS
AI403 12794692 EQUIPMENT ELEVATIONS
AI404 12794693 EQUIPMENT ELEVATIONS
AI405 12794694 EQUIPMENT ELEVATIONS
AI511 12794695 MILLWORK PLANS, SECTIONS, AND ELEVATIONS
AI512 12794696 MILLWORK PLANS, SECTIONS, AND ELEVATIONS
AI513 12794697 MILLWORK PLANS, FLOORING TRANSITIONS, BASE DETAILS
AI520 12794698 INTERIOR PLAN DETAILS
AI521 12794699 INTERIOR PLAN DETAILS
AI522 12794700 INTERIOR PLAN DETAILS
AI523 12794701 INTERIOR PLAN DETAILS
AI524 12794702 INTERIOR PLAN DETAILS
AI601 12794703 PARTITION TYPES
AI602 12794704 PARTITION TYPES
AI603 12794705 PARTITION HEAD DETAILS
AI604 12794706 PARTITION FRAMING DETAILS
AI605 12794707 LEAD PARTITION FRAMING DETAILS
AI606 1 12794708 LEAD SHIELDING
AI607 12794709 GYP BD DETAILS
AI608 12794710 CEILING DETAILS
AI609 1 12794711 CEILING DETAILS
AI611 1 12794712 METAL FABRICATIONS
AI612 12794713 DOOR AND SAFETY GLAZING INFORMATION
AI613 12794714 DOOR DETAILS, BORROWED LITES AND LOUVERS INFO
DOCUMENT 00 01 15 Page 9
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
AI614 12794715 DOOR SCHEDULE
AI615 12794716 DOOR SCHEDULE
AI616 12794717 DOOR SCHEDULE
AI620 12794718 SHOWER DETAILS
AI621 12794719 TOILET TYPES
AI622 12794720 ARCHITECTURAL EQUIPMENT SCHEDULE
AI623 12794721 EQUIPMENT MOUNTING DIAGRAMS
AI624 1 12794722 LOG CAT C EQUIPMENT MOUNTING DIAGRAMS
AI625 12794723 AUDIO BOOTH DETAILS
AE201 12794724 OVERALL EXTERIOR ELEVATIONS
AE310 12794725 AIR BARRIER DIAGRAMS
AE311 12794726 EXTERIOR WALL SECTIONS
AE312 12794727 EXTERIOR WALL SECTIONS
AE410 12794728 STEEL STAIR PLANS, SECTIONS, AND DETAILS
AE411 12794729 STAIR PLANS AND SECTIONS
AE420 12794730 ELEVATOR PLANS
AE421 12794731 ELEVATOR DETAILS
AE500 12794732 TYPICAL BRICK DETAILS
AE501 12794733 TYPICAL BRICK DETAILS
AE502 1 12794734 TYPICAL BRICK DETAILS
AE503 12794735 TYPICAL BRICK DETAILS
AE505 12794736 TYPICAL METAL ROOFING DETAILS
AE511 12794737 EXTERIOR SECTION DETAILS
AE512 12794738 EXTERIOR SECTION DETAILS
AE513 12794739 EXTERIOR SECTION DETAILS
AE514 12794740 EXTERIOR SECTION DETAILS
DOCUMENT 00 01 15 Page 10
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
AE531 12794741 EXTERIOR PLAN DETAILS
AE532 12794742 EXTERIOR PLAN DETAILS
AE540 12794743 CANOPY ADD ALTERNATE
AG101 12794744 SIGN PLAN - SITE
AG111 12794745 PARTIAL SIGN PLAN - LEVEL 1 - SECTOR 1
AG112 12794746 PARTIAL SIGN PLAN - LEVEL 1 - SECTOR 2
AG121 12794747 PARTIAL SIGN PLAN - LEVEL 2 - SECTOR 1
AG501 12794748 GENERAL SIGNAGE INFORMATION
AG502 12794749 EXTERIOR SIGN DETAILS
AG503 12794750 EXTERIOR SIGN DETAILS
AG504 12794751 EXTERIOR SIGN DETAILS
AG505 12794752 INTERIOR SIGN DETAILS
AG506 12794753 INTERIOR SIGN DETAILS
AG507 12794754 INTERIOR SIGN DETAILS
AG508 12794755 INTERIOR SIGN DETAILS
AG509 12794756 INTERIOR SIGN DETAILS
AG510 12794757 INTERIOR SIGN DETAILS
AG511 12794758 INTERIOR SIGN DETAILS
AG512 12794759 INTERIOR SIGN DETAILS
I-001 12794760 FINISH INFORMATION
I-002 12794761 ROOM FINISH SCHEDULE - LEVEL 01
I-003 12794762 ROOM FINISH SCHEDULE - LEVEL 02
I-111 12794763 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 1
I-112 12794764 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 2
I-113 12794765 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 1 ADD
ALTERNATE
I-114 12794766 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 2 ADD
ALTERNATE
DOCUMENT 00 01 15 Page 11
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
I-121 1 12794767 PARTIAL FINISH PLAN - LEVEL 2 - SECTOR 1
I-122 12794768 PARTIAL - FINISH PLAN - LEVEL 2 - SECTOR 1 ADD
ALTERNATE
IN211 12794769 INTERIOR ELEVATIONS - LEVEL 1 - SECTOR 1
IN212 12794770 INTERIOR ELEVATIONS LEVEL 1 - SECTOR 1 & 2
IN213 12794771 INTERIOR ELEVATIONS LEVEL 2 - SECTOR 1
IN901 12794772 INTERIOR PERSPECTIVES
QA111A 12794773 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1A
QA111B 12794774 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1B
QA111C 12794775 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1C
QA111D 12794776 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1D
QA112A 12794777 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2A
QA112B 12794778 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2B
QA112C 12794779 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2C
QA112D 12794780 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2D
QA121A 1 12794781 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1A
QA121B 12794782 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1B
QA121C 12794783 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1C
QA121D 12794784 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1D
BINDING 3 contains the following:
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GI003 12794785 COVER SHEET - BINDING 3
GI013 12794786 BINDING INDEX - BINDING 3
GI021 12794787 INDEX OF DRAWINGS - BINDING 1
GI022 12794788 INDEX OF DRAWINGS - BINDING 2
GI023 1 12794789 INDEX OF DRAWINGS - BINDING 3
DOCUMENT 00 01 15 Page 12
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
GI024 1 12794790 INDEX OF DRAWINGS - BINDING 3
FA001 12794791 FIRE ALARM GENERAL NOTES & LEGENDS
FA111 12794792 PARTIAL FIRE ALARM FLOOR PLAN - LEVEL 1 - SECTOR 1
FA112 12794793 PARTIAL FIRE ALARM FLOOR PLAN - LEVEL 1 - SECTOR 2
FA121 12794794 PARTIAL FIRE ALARM FLOOR PLAN - LEVEL 2 - SECTOR 1
FA601 12794795 FIRE ALARM RISER
FX001 12794796 GENERAL NOTES & SYMBOLS - FIRE PROTECTION
FX111 12794797 PARTIAL FIRE PROTECTION FLOOR PLAN - LEVEL 1 -
SECTOR 1
FX112 12794798 PARTIAL FIRE PROTECTION FLOOR PLAN - LEVEL 1 -
SECTOR 2
FX121 12794799 PARTIAL FIRE PROTECTION FLOOR PLAN - LEVEL 2 -
SECTOR 1
FX501 12794800 DETAILS - FIRE PROTECTION
P-001 12794801 GENERAL NOTES & SYMBOLS - PLUMBING
P-101A 12794802 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 -
QUADRANT A
P-101B 12794803 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 -
QUADRANT B
P-101C 12794804 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 -
QUADRANT C
P-101D 12794805 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 -
QUADRANT D
P-102A 12794806 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 -
QUADRANT A
P-102B 12794807 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 -
QUADRANT B
P-102C 12794808 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 -
QUADRANT C
P-102D 12794809 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 -
QUADRANT D
P-111A 1 12794810 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT A
P-111B 12794811 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT B
P-111C 12794812 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT C
P-111D 12794813 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT D
P-112A 12794814 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT A
P-112B 12794815 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT B
DOCUMENT 00 01 15 Page 13
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
P-112C 12794816 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT C
P-112D 12794817 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT D
P-121A 1 12794818 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT A
P-121B 12794819 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT B
P-121C 12794820 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT C
P-121D 12794821 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT D
P-131 1 12794822 PARTIAL PLUMBING ROOF PLAN - SECTOR 01
P-132 12794823 PARTIAL PLUMBING ROOF PLAN - SECTOR 02
PP111A 12794824 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR
01 - QUADRANT A
PP111B 12794825 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR
01 - QUADRANT B
PP111C 12794826 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR
01 - QUADRANT C
PP111D 12794827 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR
01 - QUADRANT D
PP121A 12794828 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR
01 - QUADRANT A
PP121B 12794829 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR
01 - QUADRANT B
PP121C 12794830 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR
01 - QUADRANT C
PP121D 12794831 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR
01 - QUADRANT D
P-401 12794832 PLUMBING ENLARGED PLANS
P-402 12794833 PLUMBING ENLARGED PLANS
P-403 12794834 PLUMBING ENLARGED PLANS
P-404 12794835 PLUMBING ENLARGED PLANS
P-501 12794836 DETAILS - PLUMBING
P-502 12794837 DETAILS - PLUMBING
P-503 12794838 DETAILS - PLUMBING
P-504 12794839 DETAILS - PLUMBING
P-505 12794840 DETAILS - PLUMBING
P-506 12794841 DETAILS - PLUMBING
DOCUMENT 00 01 15 Page 14
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
P-507 12794842 DETAILS - PLUMBING
P-508 12794843 DETAILS - PLUMBING
P-509 12794844 DETAILS - PLUMBING
P-510 12794845 DETAILS - PLUMBING
P-511 12794846 DETAILS - PLUMBING
P-512 12794847 DETAILS - PLUMBING
P-601 12794848 RISER DIAGRAMS - PLUMBING
P-602 12794849 RISER DIAGRAMS - PLUMBING
P-603 12794850 RISER DIAGRAMS - MED GAS
P-604 12794851 RISER DIAGRAMS - NATURAL GAS
P-605 12794852 RISER DIAGRAMS
P-606 12794853 RISER DIAGRAMS
P-607 12794854 RISER DIAGRAMS
P-608 12794855 RISER DIAGRAMS
P-609 12794856 RISER DIAGRAM
P-611 12794857 SCHEDULES - PLUMBING
P-612 12794858 SCHEDULES - PLUMBING
M-001 12794859 COVER SHEET
M-002 12794860 GENERAL NOTES
M-131 12794861 PARTIAL FLOOR PLAN - ROOF - SECTOR 01 - HVAC
MS11 12794862 MECHANICAL SITE PLAN
MH111A 1 12794863 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT A
MH111B 12794864 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT B
MH111C 12794865 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT C
MH111D 12794866 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT D
MH112A 12794867 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT A
DOCUMENT 00 01 15 Page 15
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
MH112B 12794868 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT B
MH112C 12794869 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT C
MH112D 12794870 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT D
MH1A1A 12794871 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT A
MH1A1C 12794872 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT C
MH1A2A 12794873 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT A
MH1A2B 12794874 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT B
MH1A2C 12794875 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT C
MH1A2D 12794876 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT D
MH121A 1 12794877 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT A
MH121B 1 12794878 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT B
MH121C 12794879 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT C
MH121D 12794880 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
MH1A3A 1 12794881 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT A
MH1A3B 1 12794882 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT B
MH1A3C 12794883 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT C
MH1A3D 12794884 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
MP111A 12794885 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT A
MP111B 12794886 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT B
MP111C 12794887 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT C
MP111D 12794888 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT D
MP112A 12794889 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT A
MP112B 12794890 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT B
MP112C 12794891 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT C
MP112D 12794892 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT D
MP1A1A 12794893 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT A
DOCUMENT 00 01 15 Page 16
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
MP1A1C 12794894 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT C
MP1A2A 12794895 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT A
MP1A2B 12794896 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT B
MP1A2C 12794897 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT C
MP1A2D 12794898 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT D
MP121A 12794899 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT A
MP121B 1 12794900 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT B
MP121C 12794901 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT C
MP121D 12794902 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
MP1A3A 12794903 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT A
MP1A3B 1 12794904 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT B
MP1A3C 12794905 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT C
MP1A3D 12794906 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
M-401 1 12794907 HVAC ENLARGED PLANS
M-402 12794908 HVAC ENLARGED PLANS
M-403 12794909 HVAC SECTIONS
M-404 12794910 HVAC SECTIONS
M-405 1 12794911 HVAC SECTIONS
M-406 12794912 HVAC SECTIONS
M-407 12794913 HVAC SECTIONS
M-501 12794914 DETAILS - MECHANICAL
M-502 12794915 DETAILS - MECHANICAL
M-503 12794916 DETAILS - MECHANICAL
M-504 12794917 DETAILS - MECHANICAL
M-505 12794918 DETAILS - MECHANICAL
M-506 12794919 DETAILS - MECHANICAL
DOCUMENT 00 01 15 Page 17
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
M-507 12794920 DETAILS - MECHANICAL
M-601 12794921 MECHANICAL RISERS
M-602 12794922 MECHANICAL RISERS
M-603 12794923 MECHANICAL RISERS
M-604 12794924 MECHANICAL RISERS
M-611 1 12794925 SCHEDULES - MECHANICAL
M-612 1 12794926 SCHEDULES - MECHANICAL
M-613 12794927 SCHEDULES - MECHANICAL
M-614 1 12794928 SCHEDULES - MECHANICAL
M-615 12794929 SCHEDULES - MECHANICAL
M-616 12794930 SCHEDULES - MECHANICAL
M-617 1 12794931 SCHEDULES - MECHANICAL
MH711 12794932 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 01 -
SECTOR 01
MH712 12794933 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 01 -
SECTOR 02
MH721 12794934 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 02 -
SECTOR 01
MI801 12794935 CONTROLS
MI802 12794936 CHILLED WATER SYSTEM CONTROLS
MI803 12794937 HOT WATER BOILER CONTROLS
MI804 12794938 SEQUENCE OF OPERATIONS - HEATING HOT WATER SYSTEM
MI805 12794939 AIR HANDLING UNIT CONTROLS
MI806 1 12794940 SEQUENCE OF OPERATIONS - VARIABLE VOLUME AIR
HANDLING UNIT
MI807 1 12794941 VAV TERMINAL UNIT CONTROLS
MI808 12794942 FAN COIL UNIT / EXHAUST FAN CONTROLS
MI809 12794943 MISCELLANEOUS CONTROL CONNECTIONS
MI810 12794944 MISCELLANEOUS HVAC CONTROLS
E-001 12794945 GENERAL INFORMATION SHEET - ELECTRICAL
DOCUMENT 00 01 15 Page 18
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
E-002 12794946 GENERAL INFORMATION SHEET - ELECTRICAL
ES00 12794947 ELECTRICAL SITE PLAN - OVERALL
ES01 12794948 ELECTRICAL SITE PLAN - UTILITIES - AREA 01
ES02 12794949 ELECTRICAL SITE PLAN - AREA 02 & 03
ES03 12794950 ELECTRICAL SITE PLAN - LIGHTING - AREA 01
EG101 12794951 ROOF PLAN - LIGHTNING PROTECTION
EG501 12794952 DETAILS - LIGHTNING PROTECTION
EG502 12794953 DETAILS - LIGHTNING PROTECTION
EP111A 12794954 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT A
EP111B 12794955 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT B
EP111C 12794956 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT C
EP111D 12794957 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -
QUADRANT D
EP112A 12794958 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 02 -
QUADRANT A
EP112B 12794959 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT B
EP112C 12794960 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 02 -
QUADRANT C
EP112D 12794961 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
EP121A 12794962 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT A
EP121B 12794963 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT B
EP121C 12794964 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT C
EP121D 12794965 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -
QUADRANT D
EP411A 12794966 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 01 - QUADRANT A
EP411B 12794967 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 01 - QUADRANT B
EP411C 12794968 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 01 - QUADRANT C
EP411D 12794969 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 01 - QUADRANT D
EP412A 12794970 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 02 - QUADRANT A
EP412B 12794971 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 02 - QUADRANT B
DOCUMENT 00 01 15 Page 19
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
EP412C 12794972 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 02 - QUADRANT C
EP412D 12794973 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 -
SECTOR 02 - QUADRANT D
EP421A 1 12794974 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 -
SECTOR 01 - QUADRANT A
EP421B 1 12794975 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 -
SECTOR 01 - QUADRANT B
EP421C 12794976 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 -
SECTOR 01 - QUADRANT C
EP421D 12794977 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 -
SECTOR 01 - QUADRANT D
EL111A 12794978 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT A
EL111B 12794979 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT B
EL111C 12794980 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT C
EL111D 12794981 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01
- QUADRANT D
EL112A 12794982 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT A
EL112B 12794983 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT B
EL112C 12794984 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT C
EL112D 12794985 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02
- QUADRANT D
EL121A 12794986 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT A
EL121B 12794987 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT B
EL121C 12794988 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT C
EL121D 12794989 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01
- QUADRANT D
EL701 12794990 SITE PLAN - PHOTOMETRIC
EL711 12794991 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 01 - SECTOR 01
EL712 12794992 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 01 - SECTOR 02
EL721 12794993 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 02 - SECTOR 01
EL731 12794994 PHOTOMETRIC LIGHTING LEVELS - LEVEL 1 -
CALCULATIONS 1
EL732 12794995 PHOTOMETRIC LIGHTING LEVELS - LEVEL 1 -
CALCULATIONS 2
EL733 12794996 PHOTOMETRIC LIGHTING LEVELS - LEVEL 2 -
CALCULATIONS 1
E-401 12794997 ENLARGED ELECTRICAL EQUIPMENT ROOMS
DOCUMENT 00 01 15 Page 20
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
E-402 12794998 ENLARGED ELECTRICAL EQUIPMENT ROOMS
E-403 12794999 ELECTRICAL ELEVATION
E-501 12795000 DETAILS - ELECTRICAL
E-502 12795001 DETAILS - ELECTRICAL
E-503 12795002 DETAILS - ELECTRICAL
E-504 12795003 DETAILS - ELECTRICAL
E-505 12795004 DETAILS - ELECTRICAL
E-506 12795005 DETAILS - ELECTRICAL
E-507 12795006 DETAILS - ELECTRICAL
E-508 12795007 DETAILS - ELECTRICAL
E-509 12795008 DETAILS - ELECTRICAL
E-510 12795009 DETAILS - ELECTRICAL
E-511 12795010 DETAILS - ELECTRICAL
E-512 12795011 DETAILS - ELECTRICAL
E-513 12795012 DETAILS - ELECTRICAL
E-514 12795013 DETAILS - ELECTRICAL
E-515 12795014 DETAILS - ELECTRICAL POLE DETAILS
E-516 12795015 DETAILS - ELECTRICAL LIGHTING CONTROLS
E-517 12795016 ELECTRICAL DUCTBANK DETAILS
E-518 12795017 ELECTRICAL DUCTBANK DETAILS
E-519 12795018 DETAILS - ELECTRICAL
E-601 12795019 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM
E-602 1 12795020 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM
E-603 12795021 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM
E-604 12795022 DIAGRAMS & SCHEMATICS - GROUNDING RISER
E-611 12795023 SCHEDULES - GENERAL
DOCUMENT 00 01 15 Page 21
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
E-612 12795024 SCHEDULES - GENERAL
E-613 12795025 SCHEDULES - LIGHTING
E-614 12795026 SCHEDULES - LIGHTING
E-615 12795027 SCHEDULES LIGHTING CONTROLS
E-616 12795028 SCHEDULES LIGHTING CONTROLS
E-617 12795029 SCHEDULES - ELECTRICAL
E-618 12795030 SCHEDULES - ELECTRICAL
E-619 12795031 SCHEDULES - ELECTRICAL
E-620 12795032 SCHEDULES - ELECTRICAL
E-621 12795033 SCHEDULES - ELECTRICAL
T-001 12795034 GENERAL INFORMATION SHEET - TELECOMMUNICATIONS
TN111 12795035 PARTIAL COMMUNICATION FLOOR PLAN - LEVEL 1 - SECTOR 1
TN112 12795036 PARTIAL COMMUNICATION FLOOR PLAN - LEVEL 1 - SECTOR 2
TN121 12795037 PARTIAL COMMUNICATION FLOOR PLAN - LEVEL 2 - SECTOR
TA111 12795038 PARTIAL AUDIO VISUAL FLOOR PLAN - LEVEL 1 - SECTOR 1
TA112 12795039 PARTIAL AUDIO VISUAL FLOOR PLAN - LEVEL 1 - SECTOR 2
TA121 12795040 PARTIAL AUDIO VISUAL FLOOR PLAN - LEVEL 2 - SECTOR 1
T-111 12795041 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - CABLETRAY
T-112 12795042 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - CABLETRAY
T-121 12795043 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - CABLETRAY
TI111 12795044 PARTIAL LOW VOLTAGE FLOOR PLAN - LEVEL 1 - SECTOR 1
TI112 12795045 PARTIAL LOW VOLTAGE FLOOR PLAN - LEVEL 1 - SECTOR 2
TI121 12795046 PARTIAL LOW VOLTAGE FLOOR PLAN - LEVEL 2 - SECTOR 1
TY01 12795047 SECURITY SITE PLAN
TY211 12795048 PARTIAL SECURITY FLOOR PLAN - LEVEL 1 - SECTOR 1
TY212 12795049 PARTIAL SECURITY FLOOR PLAN - LEVEL 1 - SECTOR 2
DOCUMENT 00 01 15 Page 22
DRAWING
NUMBER
REVISION
NO.
NAVFAC
NUMBER
DRAWING NAME
TY221 12795050 PARTIAL SECURITY FLOOR PLAN - LEVEL 2 - SECTOR 1
T-401 12795051 ENLARGED PLANS
T-402 12795052 ENLARGED PLANS
T-403 12795053 ENLARGED PLANS
T-501 12795054 DETAILS - TELECOMMUNICATIONS
T-502 12795055 DETAILS - TELECOMMUNICATIONS
T-503 12795056 DETAILS - TELECOMMUNICATIONS
T-504 12795057 DETAILS - TELECOMMUNICATIONS
T-601 12795058 RISER DIAGRAMS
T-602 12795059 RISER DIAGRAMS
T-603 12795060 NURSE CALL - ZONE LIGHT ACTIVATION MATRIX
T-604 12795061 SECURITY CAMERA SCHEDULE
1.3 NOT USED
-- End of Document --
DOCUMENT 00 01 15 Page 23
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 24
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
Submittals that are required prior to or commencing with the start of work on site.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Baseline Network Analysis Schedule (NAS)
Submittal Register
Schedule Of Prices Or Earned Value Report
Accident Prevention Plan
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SECTION 01 33 00 Page 1
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification
SECTION 01 33 00 Page 2 requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
SECTION 01 33 00 Page 3
1.1.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.1.3 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor QC approval.for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register ; G
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."
1.3.2 For Information Only
Submittals not requiring Government approval will be for information only. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."
1.3.3 Sustainability Reporting Submittals (S)
Submittals for Guiding Principle Validation (GPV) or Third Party Certification (TPC) are indicated with an "S" designation. These submittals are for information only and for use as specified in Section
01 33 29 SUSTAINABILITY REPORTING.
Schedule submittals for these items throughout the course of construction as provided; do not wait until closeout.
1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
As soon as practicable after award of contract, and before procurement or fabrication, forward to the Commander, NAVFAC , Code CI4, submittals required in the technical sections of this specification, including shop drawings, product data and samples. In addition, forward a copy of the
SECTION 01 33 00 Page 4 submittals to the Contracting Officer.
1.4.1 O&M Data
Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
In the event the Contractor fails to deliver O&M data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the items to which such O&M data apply.
1.4.2 Submittals Reserved for NAVFAC Approval
As an exception to the standard submittal procedure for Government Approval, submit the following to the Commander, NAVFAC , Code CI4, :
d. Section 14 24 23: All elevator submittals
e. Section 23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS: SD-06 field test report submittals
f. Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC: All submittals
h. Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS: All submittals
j. Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION: Transformer submittals
1.5 PREPARATION
1.5.1 Transmittal Form
Transmit each submittal, except sample installations and sample panels to the office of the approving authority using the transmittal form prescribed by the Contracting Officer. Include all information prescribed by the transmittal form and required in paragraph IDENTIFYING SUBMITTALS.
Use the submittal transmittal forms to record actions regarding samples.
1.5.2 Identifying Submittals
The Contractor's Quality Control Manager must prepare, review and stamp submittals, including those provided by a subcontractor, before submittal to the the Government.
Identify submittals, except sample installations and sample panels, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
a. Project title and location
b. Construction…