1582438spc1of1.pdf

PDF 14 MB Posted

Attached to
New River Ambulatory Care Center/Dental Clinic Replacement
Solicitation number
N4008519R9124
Issued by

View the file

Other files

File Type Posted
Amendment_03.pdf PDF
Amendment_02.pdf PDF
P9838_Price_Proposal_Form_Amendment2.docx DOCX document
1582438-spc1of1-AMEND0001.pdf PDF
1582438-Continuation_Sheet-AMEND0001R.pdf PDF
Amendment_0001.pdf PDF
Revised_P9838_Price_Proposal_Form.docx DOCX document
1582438-02of33-CIVIL_1of11.pdf PDF
P9838_RFP.pdf PDF
1582438-01of33-GENERAL_INFO-LIFE_SAFETY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL

eProjects Work Order Number(s):

1582438

Appropriation: MCON

AMBULATORY CARE CENTER

DENTAL CLINIC REPLACEMENT

MCAS New River Jacksonville, NC

(P-9838)

DESIGNED BY:

HKS|WSP Joint Venture

350 N SAINT PAUL STREET, SUITE 100

DALLAS, TEXAS 75201-4240

SPECIFICATION PREPARED BY:

Architectural, Interiors, Wayfinding: Thomas Briggs, AIA Civil, Transportation, Site Design: Christopher C. Moore, PE Civil, Storm Water: John Drake, PE Civil, Water and Sewer: Timothy P. Anderson, PE Geotechnical, Geotech and Surcharge: Ian J. Chaney, PE Landscape: David L. Patterson, RLA Structural: Larry A. Johnson, PE ATFP: Weiying S. Chiang, PE Mechanical: James S. Buckley, PE Life Safety, Fire Protection: Robert S. Hicks, PE Plumbing, Electrical and Telecommunications: Jonathan Carter, PE

Date: June 26, 2019

SPECIFICATION APPROVED BY:

For Commander, NAVFAC MID-ATLANTIC:

Date:

FINAL

This page blank intentionally.

P-9838 Ambulatory Care Center / Dental Clinic 1582438

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 22 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 56 14 CLAY BARRIER LAYER

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 12 13 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 43 00 SLOTTED CHANNEL FRAMING SYSTEMS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

PROJECT TABLE OF CONTENTS Page 1

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS

08 42 29 AUTOMATIC ENTRANCES

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 23 STEEL WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING (ALTERNATE)

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 21 23.16 CUBICLE TRACK AND HARDWARE

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 11 - EQUI PMENT

11 27 13 RADIOGRAPHIC DARKROOM EQUIPMENT

11 47 00 ICE MACHINES

11 70 00 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL EQUIPMENT

11 71 00 WARMING CABINETS, STERILIZERS, AND ASSOCIATED EQUIPMENT

11 72 13 MEDICAL EQUIPMENT, MISCELLANEOUS

11 74 00 DENTAL EQUIPMENT

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 35 70 HEALTHCARE CASEWORK

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 21 48 PREFABRICATED AUDIOMETRIC ROOMS

13 49 10 X-RAY SHIELDING

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 70 PLUMBING, HEALTHCARE FACILITIES

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 60 70 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 46.00 20 LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR

OUTPUT)

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 00.00 20 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

PROJECT TABLE OF CONTENTS Page 3

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 PUBLIC ADDRESS SYSTEMS

27 52 24 NURSE CALL SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76.00 22 INTERIOR COMBINATION EMERGENCY COMMUNICATIONS SYSTEMS

DI VI SI ON 31 - EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 31 16.13 CHEMICAL TERMITE CONTROL

31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 15 CONCRETE BLOCK PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 31 26 WIRE FENCES AND GATES

32 92 19 SEEDING

PROJECT TABLE OF CONTENTS Page 4

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING

33 40 00 STORM DRAINAGE UTILITIES

33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES

33 61 14 EXTERIOR BURIED PREINSULATED CHILLED WATER PIPING

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6

ATTACHMENT LIST

This report lists all attachments in the text.

HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.

SECTION SUBPART ATTACHMENT

01 30 00 1.8.1 NAVFAC Redzone Checklist-POAM Items 01 30 00 1.8.2 NAVFAC Redzone Facility Turnover Planning

Meetings 01 30 00 1.11 Performance Assessment Plan 01 33 00 1.8 Appendix A - Submittal Register 01 35 26 3.10 Contractor Electrical Energized Work Permit 01 45 00.00 20 1.3 Quality Control Reports 01 45 00.00 20 3.2 Acceptance Testing of Critical Systems 01 45 35 1.2 Statement of Special Inspections 01 45 35 1.2 Schedule of Special Inspections 01 57 19 3.8.1 Contractor Hazardous Material Inventory Log 01 58 00 1.4 project sign detail 01 78 00 3.5 Draft DD FORM 1354 01 78 00 3.5 Interim DD FORM 1354 01 78 24.00 20 2.3 eOMSI Facility Data Workbook

01 91 00.15 22 3.3.2 APPENDIX A - DESIGN PHASE COMMISSIONING PLAN

07 05 23 3.5.7 Pressure Test Data Analysis 07 05 23 3.10 Appendix A - Air Leakage Test Form 07 05 23 3.10 Appendix B - Air Leakage Test Results Form 07 05 23 3.10 Appendix C - Test Agency Qualifications

Sheet 08 71 00 3.6 Hardware Set Schedule 10 14 00.10 1.2 Exterior Signage Schedule 10 14 00.20 1.4.2 Interior Signage Schedule

25 08 10 3.4.2 ATTACHMENT A

25 10 10 1.6 QC Checklist 31 62 13.20 1.6.3 Pile and Driving Equipment Data Form 31 62 13.20 3.4.3 pile driving log 33 40 00 3.12.2.2 LID Verification Report

Attachment List

THIS PAGE INTENTIONALLY LEFT BLANK

Attachment List

SEALS PAGE – Page 1

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

1.1.1 Architect, Interiors, and Wayfinding

Thomas Briggs

06/26/2019

1.1.2 Civil Engineer – Transportation, Site Design

Christopher C. Moore

1.1.3 Civil Engineer – Storm Water Design

John G. Drake

SEALS PAGE – Page 2

1.1.4 Civil Engineer –Water and Sewer Design

Timothy P. Anderson

1.1.5 Geotech Engineer – Geotech and Surcharge Design

1.1.6 Landscape Architect

David L. Patterson

Tim Anderson

Ian ChaneyIan J. Chaney

SEALS PAGE – Page 3

1.1.7 Structural Engineer

Larry A. Johnson

1.1.8 ATFP Engineer

Weiying S. Chiang

1.1.9 Mechanical Engineer

James S. Buckley

SEALS PAGE – Page 4

1.1.10 Life Safety, Fire Protection Engineer

Robert S. Hicks

1.1.11 Plumbing, Electrical, and Telecommunications Engineer

Jonathan Carter

END OF SEALS PAGE

PROGRESS SET FOR REVIEW ONLY

THESE DOCUMENTS ARE FOR

DESIGN REVIEW AND NOT

INTENDED FOR CONSTRUCTION,

BIDDING, OR PERMIT PURPOSES.

THEY WERE PREPARED BY OR

UNDER SUPERVISION OF:

DOUGLAS T. CALHOUN

4/17/

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are represented in multiple bindings as enumerated below:

BINDING 1 contains the following:

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

GI001 12794493 COVER SHEET - BINDING 1

GI011 12794494 BINDING INDEX - BINDING 1

GI021 12794495 INDEX OF DRAWINGS - BINDING 1

GI022 12794496 INDEX OF DRAWINGS - BINDING 2

GI023 12794497 INDEX OF DRAWINGS - BINDING 3

GI024 12794498 INDEX OF DRAWINGS - BINDING 3

GI100 12794499 PROJECT INFORMATION

GI101 12794500 SHEET NAMING SYSTEM DIAGRAMS

GI102 12794501 LIFE SAFETY CODE COMPLIANCE INFORMATION

GI110 12794502 LIFE SAFETY SITE PLAN

GI111 12794503 LIFE SAFETY PLAN - LEVEL 01 OVERALL

GI112 12794504 LIFE SAFETY PLAN - LEVEL 02 OVERALL

C-001 12794505 KEY PLAN

C-002 12794506 ABBREVIATIONS, SYMBOLS LEGEND

V-101 12794507 EXISTING CONDITIONS PLAN

V-102 12794508 EXISTING CONDITIONS PLAN

V-103 12794509 EXISTING CONDITIONS PLAN

V-104 12794510 EXISTING CONDITIONS PLAN

V-105 12794511 EXISTING TREE INVENTORY PLAN

V-106 12794512 EXISTING TREE INVENTORY PLAN

V-107 12794513 EXISTING TREE INVENTORY PLAN

DOCUMENT 00 01 15 Page 1

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

V-108 12794514 EXISTING TREE INVENTORY PLAN

V-109 12794515 EXISTING TREE INVENTORY PLAN

V-601 12794516 EXISTING TREE INVENTORY SCHEDULE

V-602 12794517 EXISTING TREE INVENTORY SCHEDULE

V-701 12794518 BLDG AS4020-SITE DEMOLITION PLAN

V-702 12794519 BLDG AS4020-SITE DEMOLITION PLAN

CD101 12794520 SITE DEMOLITION PLAN

CD102 12794521 SITE UTILITY DEMOLITION PLAN

CD103 12794522 SITE DEMOLITION LIMITS PLAN

CD104 12794523 BUILDING AS100 SITE DEMOLITION PLAN

CD105 12794524 BUILDING AS100 SITE UTILITY DEMOLITION PLAN

CD106 12794525 BUILDING AS100 SITE GRADING PLAN-BASE BID

CD107 12794526 BUILDING AS100 SITE GRADING PLAN-BID ALTERNATE

CD108 12794527 BUILDING AS100 SITE DEMOLITION LIMITS PLAN

CD601 12794528 SITE DEMOLITION SCHEDULE

CS101 12794529 SITE PLAN

CS102 12794530 SITE PLAN

CS103 12794531 DRAINAGE PLAN

CS121 12794532 ALIGNMENT GEOMETRY PLAN

CS122 12794533 ALIGNMENT GEOMETRY REPORT

CS123 12794534 ALIGNMENT GEOMETRY PLAN

CS124 12794535 CURB DATA PLAN

CS131 12794536 SIGNING AND PAVEMENT MARKING PLAN

CS201 12794537 ROADWAY PROFILE

CS211 12794538 DRAINAGE PROFILES

CS212 12794539 DRAINAGE PROFILES

CS213 12794540 DRAINAGE PROFILES

CS214 12794541 COMMUNICATION DUCT BANK PROFILE

CS301 12794542 TYPICAL SECTIONS

CS302 12794543 SITE SECTIONS

CS303 12794544 TYPICAL SECTIONS

DOCUMENT 00 01 15 Page 2

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

CS304 12794545 STORMWATER DETAILS - STORMWATER SAND FILTER SF-1

CS305 12794546 STORMWATER DETAILS - STORMWATER SAND FILTER SF-2

CS501 12794547 SITE DETAILS

CS502 12794548 SITE DETAILS

CS503 12794549 SITE DETAILS

CS504 12794550 SITE DETAILS

CS505 12794551 SITE DETAILS

CS506 12794552 SITE DETAILS

CS507 12794553 SITE DETAILS

CS508 12794554 SITE DETAILS

CS509 12794555 SITE DETAILS

CS510 12794556 SITE DETAILS

CS511 12794557 SITE DETAILS

CS512 12794558 SITE DETAILS

CS513 12794559 SITE DETAILS

CS514 12794560 SITE DETAILS

CS515 12794561 SIGNING AND PAVEMENT MARKING DETAILS

CS516 12794562 SIGNING AND PAVEMENT MARKING DETAILS

CS517 12794563 SIGNING AND PAVEMENT MARKING NOTES, LEGEND AND DETAILS

CS518 12794564 SITE DETAILS

CS601 12794565 CURB DATA SCHEDULE

CS602 12794566 EXISTING DRAINAGE AND SANITARY SCHEDULE

CS603 12794567 DRAINAGE DESCRIPTIONS

CG101 12794568 GRADING PLAN

CU001 12794569 WATER AND SEWER UTILITY NOTES

CU101 12794570 WATER AND SEWER UTILITY PLAN

CU201 12794571 WATER PROFILES

CU202 12794572 SEWER PROFILES

CU501 12794573 UTILITY DETAILS

CU502 12794574 UTILITY DETAILS

CU503 12794575 UTILITY DETAILS

DOCUMENT 00 01 15 Page 3

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

CU504 12794576 UTILITY DETAILS

CU505 12794577 UTILITY DETAILS

CU506 12794578 UTILITY DETAILS

CU601 12794579 UTILITIES SCHEDULE

GC002 12794580 EROSION AND SEDIMENT CONTROL NOTES

GC003 12794581 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS

GC004 12794582 EROSION AND SEDIMENT CONTROL INSPECTION NOTES

GC005 12794583 STORMWATER MANAGEMENT AND MAINTENANCE NOTES

GC006 12794584 DRAINAGE AREA MAP

GC101 12794585 SITE CONSTRUCTION PHASE I

GC102 12794586 SITE CONSTRUCTION PHASE II

GC103 12794587 SITE CONSTRUCTION PHASE III

GC104 12794588 SITE CONSTRUCTION PHASE III

GC105 12794589 SITE CONSTRUCTION PHASE IV

GC106 12794590 SITE CONSTRUCTION PHASE V

GC107 12794591 SITE CONSTRUCTION PHASE VI

GC108 12794592 TEMPORARY SEWER PLAN

GC109 12794593 EROSION AND SEDIMENT CONTROL PHASE I

GC110 12794594 EROSION AND SEDIMENT CONTROL PHASE II

GC111 12794595 EROSION AND SEDIMENT CONTROL PHASE III

GC112 12794596 EROSION AND SEDIMENT CONTROL PHASE III

GC113 12794597 EROSION AND SEDIMENT CONTROL PHASE IV

GC114 12794598 EROSION AND SEDIMENT CONTROL PHASE V

GC115 12794599 EROSION AND SEDIMENT CONTROL PHASE VI

GC201 12794600 TEMPORARY SEWER PROFILE

GC501 12794601 EROSION AND SEDIMENT CONTROL DETAILS

GC502 12794602 EROSION AND SEDIMENT CONTROL DETAILS

GC503 12794603 EROSION AND SEDIMENT CONTROL DETAILS

GC504 12794604 EROSION AND SEDIMENT CONTROL DETAILS

LP101 12794605 LANDSCAPE PLAN

LP501 12794606 SITE FURNITURE AND LANDSCAPE AMENITIES

DOCUMENT 00 01 15 Page 4

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

LP502 12794607 LANDSCAPE DETAILS

LP601 12794608 MASTER PLANT SCHEDULE AND GENERAL NOTES

B-001 12794609 BORING NOTES AND LEGEND

B-101 12794610 SURCHARGE PLAN DETAILS AND NOTES

B-102 12794611 BORING PLAN

BB601 12794612 BORING LOGS

BB602 12794613 BORING LOGS

BB603 12794614 BORING LOGS

BB604 12794615 BORING LOGS

BB605 12794616 BORING LOGS

BB606 12794617 BORING LOGS

BB607 12794618 BORING LOGS

BB608 12794619 BORING LOGS

BB609 12794620 BORING LOGS

BB610 12794621 BORING LOGS

BB611 12794622 BORING LOGS

BB612 12794623 BORING LOGS

BB613 12794624 BORING LOGS

BB614 12794625 BORING LOGS

BB615 12794626 BORING LOGS

BB616 12794627 BORING LOGS

BB617 12794628 BORING LOGS

BB618 12794629 BORING LOGS

BB619 12794630 BORING LOGS

BB620 12794631 BORING LOGS

BB621 12794632 BORING LOGS

BB622 12794633 BORING LOGS

DOCUMENT 00 01 15 Page 5

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

BB623 12794634 BORING LOGS

BINDING 2 contains the following:

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

GI002 12794635 COVER SHEET - BINDING 2

GI012 12794636 BINDING INDEX - BINDING 2

GI021 12794637 INDEX OF DRAWINGS - BINDING 1

GI022 12794638 INDEX OF DRAWINGS - BINDING 2

GI023 12794639 INDEX OF DRAWINGS - BINDING 3

GI024 12794640 INDEX OF DRAWINGS - BINDING 3

S-001 12794641 GENERAL NOTES

S-002 12794642 GENERAL NOTES

S-501 12794643 TYPICAL DETAILS

S-502 12794644 TYPICAL DETAILS

S-503 12794645 TYPICAL DETAILS

S-504 12794646 TYPICAL DETAILS

S-505 12794647 TYPICAL DETAILS

S-506 12794648 TYPICAL DETAILS

S-507 12794649 TYPICAL DETAILS

S-508 12794650 TYPICAL DETAILS

S-509 12794651 TYPICAL DETAILS

SB111 12794652 FOUNDATION PLAN - SECTOR 01

SB112 12794653 FOUNDATION PLAN - SECTOR 02

SB113 12794654 PARTIAL FOUNDATION & FRAMING PLANS - CANOPY

SF121 12794655 FRAMING PLAN - SECTOR 01

SF122 12794656 RAFTER FRAMING PLAN - SECTOR 01

DOCUMENT 00 01 15 Page 6

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

SF123 12794657 FRAMING PLAN - SECTOR 02

SF124 12794658 RAFTER FRAMING PLAN - SECTOR 02

SF131 12794659 FRAMING PLAN - SECTOR 01

SF132 12794660 RAFTER FRAMING PLAN - SECTOR 01

SB301 12794661 SECTIONS & DETAILS

SB302 12794662 SECTIONS & DETAILS

SB303 12794663 SECTIONS & DETAILS

SF301 12794664 SECTIONS & DETAILS

SF302 12794665 SECTIONS & DETAILS

SF303 12794666 SECTIONS & DETAILS

SF304 12794667 SECTIONS & DETAILS

SF401 12794668 ENVELOPE STRUCTURAL ELEVATION

SF501 12794669 ENVELOPE STRUCTURAL DETAILS

AS01 12794670 ARCHITECTURAL SITE PLAN

A-01 12794671 ABBREVIATIONS, SYMBOL LEGEND

A-12 12794672 FUNCTIONAL FLOOR PLANS

A-13 12794673 FUNCTIONAL FLOOR PLANS ROOF LEVEL

A-111 12794674 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1

A-112 12794675 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2

A-121 12794676 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1

AF121 12794677 FIRE PROTECTION PLAN - LEVEL 2 - SECTOR 1

AI111A 12794678 PARTIAL RCP - LEVEL 1 - QUADRANT 1A

AI111B 12794679 PARTIAL RCP - LEVEL 1 - QUADRANT 1B

AI111C 12794680 PARTIAL RCP - LEVEL 1 - QUADRANT 1C

AI111D 12794681 PARTIAL RCP - LEVEL 1 - QUADRANT 1D

AI112A 12794682 PARTIAL RCP - LEVEL 1 - QUADRANT 2A

AI112B 12794683 PARTIAL RCP - LEVEL 1 - QUADRANT 2B

AI112C 12794684 PARTIAL RCP - LEVEL 1 - QUADRANT 2C

AI112D 12794685 PARTIAL RCP - LEVEL 1 - QUADRANT 2D

AI121A 12794686 PARTIAL RCP - LEVEL 2 - QUADRANT 1A

AI121B 12794687 PARTIAL RCP - LEVEL 2 - QUADRANT 1B

AI121C 12794688 PARTIAL RCP - LEVEL 2 - QUADRANT 1C

DOCUMENT 00 01 15 Page 7

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

AI121D 12794689 PARTIAL RCP - LEVEL 2 - QUADRANT 1D

AI401 12794690 EQUIPMENT ELEVATIONS

AI402 12794691 EQUIPMENT ELEVATIONS

AI403 12794692 EQUIPMENT ELEVATIONS

AI404 12794693 EQUIPMENT ELEVATIONS

AI405 12794694 EQUIPMENT ELEVATIONS

AI511 12794695 MILLWORK PLANS, SECTIONS, AND ELEVATIONS

AI512 12794696 MILLWORK PLANS, SECTIONS, AND ELEVATIONS

AI513 12794697 MILLWORK PLANS, FLOORING TRANSITIONS, BASE DETAILS

AI520 12794698 INTERIOR PLAN DETAILS

AI521 12794699 INTERIOR PLAN DETAILS

AI522 12794700 INTERIOR PLAN DETAILS

AI523 12794701 INTERIOR PLAN DETAILS

AI524 12794702 INTERIOR PLAN DETAILS

AI601 12794703 PARTITION TYPES

AI602 12794704 PARTITION TYPES

AI603 12794705 PARTITION HEAD DETAILS

AI604 12794706 PARTITION FRAMING DETAILS

AI605 12794707 LEAD PARTITION FRAMING DETAILS

AI606 12794708 LEAD SHIELDING

AI607 12794709 GYP BD DETAILS

AI608 12794710 CEILING DETAILS

AI609 12794711 CEILING DETAILS

AI611 12794712 METAL FABRICATIONS

AI612 12794713 DOOR AND SAFETY GLAZING INFORMATION

AI613 12794714 DOOR DETAILS, BORROWED LITES AND LOUVERS INFO

AI614 12794715 DOOR SCHEDULE

AI615 12794716 DOOR SCHEDULE

AI616 12794717 DOOR SCHEDULE

AI620 12794718 SHOWER DETAILS

AI621 12794719 TOILET TYPES

AI622 12794720 ARCHITECTURAL EQUIPMENT SCHEDULE

DOCUMENT 00 01 15 Page 8

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

AI623 12794721 EQUIPMENT MOUNTING DIAGRAMS

AI624 12794722 LOG CAT C EQUIPMENT MOUNTING DIAGRAMS

AI625 12794723 AUDIO BOOTH DETAILS

AE201 12794724 OVERALL EXTERIOR ELEVATIONS

AE310 12794725 AIR BARRIER DIAGRAMS

AE311 12794726 EXTERIOR WALL SECTIONS

AE312 12794727 EXTERIOR WALL SECTIONS

AE410 12794728 STEEL STAIR PLANS, SECTIONS, AND DETAILS

AE411 12794729 STAIR PLANS AND SECTIONS

AE420 12794730 ELEVATOR PLANS

AE421 12794731 ELEVATOR DETAILS

AE500 12794732 TYPICAL BRICK DETAILS

AE501 12794733 TYPICAL BRICK DETAILS

AE502 12794734 TYPICAL BRICK DETAILS

AE503 12794735 TYPICAL BRICK DETAILS

AE505 12794736 TYPICAL METAL ROOFING DETAILS

AE511 12794737 EXTERIOR SECTION DETAILS

AE512 12794738 EXTERIOR SECTION DETAILS

AE513 12794739 EXTERIOR SECTION DETAILS

AE514 12794740 EXTERIOR SECTION DETAILS

AE531 12794741 EXTERIOR PLAN DETAILS

AE532 12794742 EXTERIOR PLAN DETAILS

AE540 12794743 CANOPY ADD ALTERNATE

AG101 12794744 SIGN PLAN - SITE

AG111 12794745 PARTIAL SIGN PLAN - LEVEL 1 - SECTOR 1

AG112 12794746 PARTIAL SIGN PLAN - LEVEL 1 - SECTOR 2

AG121 12794747 PARTIAL SIGN PLAN - LEVEL 2 - SECTOR 1

AG501 12794748 GENERAL SIGNAGE INFORMATION

AG502 12794749 EXTERIOR SIGN DETAILS

AG503 12794750 EXTERIOR SIGN DETAILS

AG504 12794751 EXTERIOR SIGN DETAILS

AG505 12794752 INTERIOR SIGN DETAILS

DOCUMENT 00 01 15 Page 9

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

AG506 12794753 INTERIOR SIGN DETAILS

AG507 12794754 INTERIOR SIGN DETAILS

AG508 12794755 INTERIOR SIGN DETAILS

AG509 12794756 INTERIOR SIGN DETAILS

AG510 12794757 INTERIOR SIGN DETAILS

AG511 12794758 INTERIOR SIGN DETAILS

AG512 12794759 INTERIOR SIGN DETAILS

I-001 12794760 FINISH INFORMATION

I-002 12794761 ROOM FINISH SCHEDULE - LEVEL 01

I-003 12794762 ROOM FINISH SCHEDULE - LEVEL 02

I-111 12794763 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 1

I-112 12794764 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 2

I-113 12794765 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 1 ADD ALTERNATE

I-114 12794766 PARTIAL FINISH PLAN - LEVEL 1 - SECTOR 2 ADD ALTERNATE

I-121 12794767 PARTIAL FINISH PLAN - LEVEL 2 - SECTOR 1

I-122 12794768 PARTIAL - FINISH PLAN - LEVEL 2 - SECTOR 1 ADD ALTERNATE

IN211 12794769 INTERIOR ELEVATIONS - LEVEL 1 - SECTOR 1

IN212 12794770 INTERIOR ELEVATIONS LEVEL 1 - SECTOR 1 & 2

IN213 12794771 INTERIOR ELEVATIONS LEVEL 2 - SECTOR 1

IN901 12794772 INTERIOR PERSPECTIVES

QA111A 12794773 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1A

QA111B 12794774 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1B

QA111C 12794775 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1C

QA111D 12794776 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 1D

QA112A 12794777 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2A

QA112B 12794778 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2B

QA112C 12794779 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2C

QA112D 12794780 PARTIAL EQUIPMENT PLAN - LEVEL 1 - QUADRANT 2D

QA121A 12794781 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1A

QA121B 12794782 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1B

QA121C 12794783 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1C

DOCUMENT 00 01 15 Page 10

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

QA121D 12794784 PARTIAL EQUIPMENT PLAN - LEVEL 2 - QUADRANT 1D

BINDING 3 contains the following:

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

GI003 12794785 COVER SHEET - BINDING 3

GI013 12794786 BINDING INDEX - BINDING 3

GI021 12794787 INDEX OF DRAWINGS - BINDING 1

GI022 12794788 INDEX OF DRAWINGS - BINDING 2

GI023 12794789 INDEX OF DRAWINGS - BINDING 3

GI024 12794790 INDEX OF DRAWINGS - BINDING 3

FA001 12794791 FIRE ALARM GENERAL NOTES & LEGENDS

FA111 12794792 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - FIRE ALARM

FA112 12794793 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - FIRE ALARM

FA121 12794794 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - FIRE ALARM

FA601 12794795 FIRE ALARM RISER

FX001 12794796 GENERAL NOTES & SYMBOLS - FIRE PROTECTION

FX111 12794797 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - FIRE

PROTECTION

FX112 12794798 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - FIRE

PROTECTION

FX121 12794799 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - FIRE

PROTECTION

FX501 12794800 DETAILS - FIRE PROTECTION

P-001 12794801 GENERAL NOTES & SYMBOLS - PLUMBING

P-101A 12794802 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 - QUADRANT

A

P-101B 12794803 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 - QUADRANT

B

DOCUMENT 00 01 15 Page 11

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

P-101C 12794804 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 - QUADRANT

C

P-101D 12794805 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 01 - QUADRANT

D

P-102A 12794806 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 - QUADRANT

A

P-102B 12794807 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 - QUADRANT

B

P-102C 12794808 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 - QUADRANT

C

P-102D 12794809 PARTIAL PLUMBING UNDERFLOOR PLAN - SECTOR 02 - QUADRANT

D

P-111A 12794810 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

P-111B 12794811 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

P-111C 12794812 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

P-111D 12794813 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

P-112A 12794814 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

P-112B 12794815 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

P-112C 12794816 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

P-112D 12794817 PARTIAL PLUMBING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

P-121A 12794818 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

P-121B 12794819 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

P-121C 12794820 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

P-121D 12794821 PARTIAL PLUMBING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

P-131 12794822 PARTIAL PLUMBING ROOF PLAN - SECTOR 01

P-132 12794823 PARTIAL PLUMBING ROOF PLAN - SECTOR 02

PP111A 12794824 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

PP111B 12794825 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

PP111C 12794826 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

PP111D 12794827 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

PP121A 12794828 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

PP121B 12794829 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

DOCUMENT 00 01 15 Page 12

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

PP121C 12794830 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

PP121D 12794831 PARTIAL DENTAL GAS FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

P-401 12794832 PLUMBING ENLARGED PLANS

P-402 12794833 PLUMBING ENLARGED PLANS

P-403 12794834 PLUMBING ENLARGED PLANS

P-404 12794835 PLUMBING ENLARGED PLANS

P-501 12794836 DETAILS - PLUMBING

P-502 12794837 DETAILS - PLUMBING

P-503 12794838 DETAILS - PLUMBING

P-504 12794839 DETAILS - PLUMBING

P-505 12794840 DETAILS - PLUMBING

P-506 12794841 DETAILS - PLUMBING

P-507 12794842 DETAILS - PLUMBING

P-508 12794843 DETAILS - PLUMBING

P-509 12794844 DETAILS - PLUMBING

P-510 12794845 DETAILS - PLUMBING

P-511 12794846 DETAILS - PLUMBING

P-512 12794847 DETAILS - PLUMBING

P-601 12794848 RISER DIAGRAMS - PLUMBING

P-602 12794849 RISER DIAGRAMS - PLUMBING

P-603 12794850 RISER DIAGRAMS - MED GAS

P-604 12794851 RISER DIAGRAMS - NATURAL GAS

P-605 12794852 RISER DIAGRAMS

P-606 12794853 RISER DIAGRAMS

P-607 12794854 RISER DIAGRAMS

P-608 12794855 RISER DIAGRAMS

DOCUMENT 00 01 15 Page 13

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

P-609 12794856 RISER DIAGRAM

P-611 12794857 SCHEDULES - PLUMBING

P-612 12794858 SCHEDULES - PLUMBING

M-001 12794859 COVER SHEET

M-002 12794860 GENERAL NOTES

M-131 12794861 PARTIAL FLOOR PLAN - ROOF - SECTOR 01 - HVAC

MS11 12794862 MECHANICAL SITE PLAN

MH111A 12794863 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

MH111B 12794864 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

MH111C 12794865 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

MH111D 12794866 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

MH112A 12794867 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

MH112B 12794868 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

MH112C 12794869 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

MH112D 12794870 PARTIAL HVAC FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

MH1A1A 12794871 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

MH1A1C 12794872 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

MH1A2A 12794873 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

MH1A2B 12794874 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

MH1A2C 12794875 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

MH1A2D 12794876 PARTIAL HVAC ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

MH121A 12794877 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

MH121B 12794878 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

MH121C 12794879 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

MH121D 12794880 PARTIAL HVAC FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

MH1A3A 12794881 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

DOCUMENT 00 01 15 Page 14

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

MH1A3B 12794882 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

MH1A3C 12794883 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

MH1A3D 12794884 PARTIAL HVAC ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

MP111A 12794885 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

MP111B 12794886 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

MP111C 12794887 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

MP111D 12794888 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

MP112A 12794889 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

MP112B 12794890 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

MP112C 12794891 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

MP112D 12794892 PARTIAL PIPING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

MP1A1A 12794893 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

MP1A1C 12794894 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

MP1A2A 12794895 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

MP1A2B 12794896 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

MP1A2C 12794897 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

MP1A2D 12794898 PARTIAL PIPING ATTIC PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

MP121A 12794899 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

MP121B 12794900 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

MP121C 12794901 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

MP121D 12794902 PARTIAL PIPING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

MP1A3A 12794903 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

MP1A3B 12794904 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

MP1A3C 12794905 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

MP1A3D 12794906 PARTIAL PIPING ATTIC PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

M-401 12794907 HVAC ENLARGED PLANS

DOCUMENT 00 01 15 Page 15

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

M-402 12794908 HVAC ENLARGED PLANS

M-403 12794909 HVAC SECTIONS

M-404 12794910 HVAC SECTIONS

M-405 12794911 HVAC SECTIONS

M-406 12794912 HVAC SECTIONS

M-407 12794913 HVAC SECTIONS

M-501 12794914 DETAILS - MECHANICAL

M-502 12794915 DETAILS - MECHANICAL

M-503 12794916 DETAILS - MECHANICAL

M-504 12794917 DETAILS - MECHANICAL

M-505 12794918 DETAILS - MECHANICAL

M-506 12794919 DETAILS - MECHANICAL

M-507 12794920 DETAILS - MECHANICAL

M-601 12794921 MECHANICAL RISERS

M-602 12794922 MECHANICAL RISERS

M-603 12794923 MECHANICAL RISERS

M-604 12794924 MECHANICAL RISERS

M-611 12794925 SCHEDULES - MECHANICAL

M-612 12794926 SCHEDULES - MECHANICAL

M-613 12794927 SCHEDULES - MECHANICAL

M-614 12794928 SCHEDULES - MECHANICAL

M-615 12794929 SCHEDULES - MECHANICAL

M-616 12794930 SCHEDULES - MECHANICAL

M-617 12794931 SCHEDULES - MECHANICAL

MH711 12794932 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 01 -

SECTOR 01

MH712 12794933 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 01 -

SECTOR 02

DOCUMENT 00 01 15 Page 16

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

MH721 12794934 PARTIAL HVAC PRESSURIZATION FLOOR PLAN - LEVEL 02 -

SECTOR 01

MI801 12794935 CONTROLS

MI802 12794936 AIR COOLED CHILLER CONTROLS

MI803 12794937 HOT WATER BOILER CONTROLS

MI804 12794938 SEQUENCE OF OPERATIONS - HEATING HOT WATER SYSTEM

MI805 12794939 AIR HANDLING UNIT CONTROLS

MI806 12794940 SEQUENCE OF OPERATIONS - VARIABLE VOLUME AIR HANDLING

UNIT

MI807 12794941 VAV TERMINAL UNIT CONTROLS

MI808 12794942 FAN COIL UNIT / EXHAUST FAN CONTROLS

MI809 12794943 MISCELLANEOUS CONTROL CONNECTIONS

MI810 12794944 MISCELLANEOUS HVAC CONTROLS

E-001 12794945 GENERAL INFORMATION SHEET - ELECTRICAL

E-002 12794946 GENERAL INFORMATION SHEET - ELECTRICAL

ES00 12794947 ELECTRICAL SITE PLAN - OVERALL

ES01 12794948 ELECTRICAL SITE PLAN - UTILITIES - AREA 01

ES02 12794949 ELECTRICAL SITE PLAN - AREA 02 & 03

ES03 12794950 ELECTRICAL SITE PLAN - LIGHTING - AREA 01

EG101 12794951 ROOF PLAN - LIGHTNING PROTECTION

EG501 12794952 DETAILS - LIGHTNING PROTECTION

EG502 12794953 DETAILS - LIGHTNING PROTECTION

EP111A 12794954 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

EP111B 12794955 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

EP111C 12794956 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

EP111D 12794957 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

EP112A 12794958 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

EP112B 12794959 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

DOCUMENT 00 01 15 Page 17

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

EP112C 12794960 PARTIAL POWER FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

EP112D 12794961 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

EP121A 12794962 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

EP121B 12794963 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

EP121C 12794964 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

EP121D 12794965 PARTIAL POWER FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

EP411A 12794966 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

01 - QUADRANT A

EP411B 12794967 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

01 - QUADRANT B

EP411C 12794968 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

01 - QUADRANT C

EP411D 12794969 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

01 - QUADRANT D

EP412A 12794970 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

02 - QUADRANT A

EP412B 12794971 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

02 - QUADRANT B

EP412C 12794972 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

02 - QUADRANT C

EP412D 12794973 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 01 - SECTOR

02 - QUADRANT D

EP421A 12794974 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 - SECTOR

01 - QUADRANT A

EP421B 12794975 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 - SECTOR

01 - QUADRANT B

EP421C 12794976 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 - SECTOR

01 - QUADRANT C

EP421D 12794977 PARTIAL EQUIPMENT POWER FLOOR PLAN - LEVEL 02 - SECTOR

01 - QUADRANT D

EL111A 12794978 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT A

EL111B 12794979 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT B

EL111C 12794980 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT C

EL111D 12794981 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 01 -

QUADRANT D

EL112A 12794982 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT A

EL112B 12794983 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT B

EL112C 12794984 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT C

EL112D 12794985 PARTIAL LIGHTING FLOOR PLAN - LEVEL 01 - SECTOR 02 -

QUADRANT D

DOCUMENT 00 01 15 Page 18

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

EL121A 12794986 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT A

EL121B 12794987 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT B

EL121C 12794988 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT C

EL121D 12794989 PARTIAL LIGHTING FLOOR PLAN - LEVEL 02 - SECTOR 01 -

QUADRANT D

EL701 12794990 SITE PLAN - PHOTOMETRIC

EL711 12794991 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 01 - SECTOR 01

EL712 12794992 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 01 - SECTOR 02

EL721 12794993 PARTIAL PHOTOMETRIC FLOOR PLAN - LEVEL 02 - SECTOR 01

EL731 12794994 PHOTOMETRIC LIGHTING LEVELS - LEVEL 1 - CALCULATIONS 1

EL732 12794995 PHOTOMETRIC LIGHTING LEVELS - LEVEL 1 - CALCULATIONS 2

EL733 12794996 PHOTOMETRIC LIGHTING LEVELS - LEVEL 2 - CALCULATIONS 1

E-401 12794997 ENLARGED ELECTRICAL EQUIPMENT ROOMS

E-402 12794998 ENLARGED ELECTRICAL EQUIPMENT ROOMS

E-403 12794999 ELECTRICAL ELEVATION

E-501 12795000 DETAILS - ELECTRICAL

E-502 12795001 DETAILS - ELECTRICAL

E-503 12795002 DETAILS - ELECTRICAL

E-504 12795003 DETAILS - ELECTRICAL

E-505 12795004 DETAILS - ELECTRICAL

E-506 12795005 DETAILS - ELECTRICAL

E-507 12795006 DETAILS - ELECTRICAL

E-508 12795007 DETAILS - ELECTRICAL

E-509 12795008 DETAILS - ELECTRICAL

E-510 12795009 DETAILS - ELECTRICAL

E-511 12795010 DETAILS - ELECTRICAL

E-512 12795011 DETAILS - ELECTRICAL

DOCUMENT 00 01 15 Page 19

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

E-513 12795012 DETAILS - ELECTRICAL

E-514 12795013 DETAILS - ELECTRICAL

E-515 12795014 DETAILS - ELECTRICAL POLE DETAILS

E-516 12795015 DETAILS - ELECTRICAL LIGHTING CONTROLS

E-517 12795016 ELECTRICAL DUCTBANK DETAILS

E-518 12795017 ELECTRICAL DUCTBANK DETAILS

E-519 12795018 DETAILS - ELECTRICAL

E-601 12795019 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM

E-602 12795020 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM

E-603 12795021 DIAGRAMS & SCHEMATICS - ONE LINE DIAGRAM

E-604 12795022 DIAGRAMS & SCHEMATICS - GROUNDING RISER

E-611 12795023 SCHEDULES - GENERAL

E-612 12795024 SCHEDULES - GENERAL

E-613 12795025 SCHEDULES - LIGHTING

E-614 12795026 SCHEDULES - LIGHTING

E-615 12795027 SCHEDULES LIGHTING CONTROLS

E-616 12795028 SCHEDULES LIGHTING CONTROLS

E-617 12795029 SCHEDULES - ELECTRICAL

E-618 12795030 SCHEDULES - ELECTRICAL

E-619 12795031 SCHEDULES - ELECTRICAL

E-620 12795032 SCHEDULES - ELECTRICAL

E-621 12795033 SCHEDULES - ELECTRICAL

T-001 12795034 GENERAL INFORMATION SHEET - TELECOMMUNICATIONS

TN111 12795035 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - COMMUNICATION

TN112 12795036 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - COMMUNICATION

TN121 12795037 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - COMMUNICATION

DOCUMENT 00 01 15 Page 20

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

TA111 12795038 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - AUDIO VISUAL

TA112 12795039 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - AUDIO VISUAL

TA121 12795040 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - AUDIO VISUAL

T-111 12795041 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - CABLETRAY

T-112 12795042 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - CABLETRAY

T-121 12795043 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - CABLETRAY

TI111 12795044 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - LOW VOLTAGE

TI112 12795045 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - LOW VOLTAGE

TI121 12795046 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - LOW VOLTAGE

TY01 12795047 SECURITY SITE PLAN

TY211 12795048 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 1 - SECURITY

TY212 12795049 PARTIAL FLOOR PLAN - LEVEL 1 - SECTOR 2 - SECURITY

TY221 12795050 PARTIAL FLOOR PLAN - LEVEL 2 - SECTOR 1 - SECURITY

T-401 12795051 ENLARGED PLANS

T-402 12795052 ENLARGED PLANS

T-403 12795053 ENLARGED PLANS

T-501 12795054 DETAILS - TELECOMMUNICATIONS

T-502 12795055 DETAILS - TELECOMMUNICATIONS

T-503 12795056 DETAILS - TELECOMMUNICATIONS

T-504 12795057 DETAILS - TELECOMMUNICATIONS

T-601 12795058 RISER DIAGRAMS

T-602 12795059 RISER DIAGRAMS

T-603 12795060 NURSE CALL - ZONE LIGHT ACTIVATION MATRIX

DOCUMENT 00 01 15 Page 21

DRAWING

NUMBER

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

T-604 12795061 SECURITY CAMERA SCHEDULE

1.3 SUPPLEMENTARY DRAWINGS

These supplementary drawings may not be a part of the contract but are included with the drawings for information.

1.3.1 Reference Drawings

The following reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract. The drawings are half size. Full-size drawings are available at the bidder's or Contractor's expense. Information on procuring these full-size drawings may be obtained from the Contracting Officer.

BINDING 4 contains the following:

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

GI004 12795062 COVER SHEET - BINDING QU

GI014 12795063 BINDING INDEX - BINDING QU

GI021 12795064 INDEX OF DRAWINGS - BINDING 1

GI022 12795065 INDEX OF DRAWINGS - BINDING 2

GI023 12795066 INDEX OF DRAWINGS - BINDING 3

GI024 12795067 INDEX OF DRAWINGS - BINDING 3

GI025 12795068 INDEX OF DRAWINGS - BINDING QU

QU111A 12795069 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 1A

QU111B 12795070 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 1B

DOCUMENT 00 01 15 Page 22

DRAWING

NO.

REVISION

NO.

NAVFAC

NUMBER

DRAWING NAME

QU111C 12795071 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 1C

QU111D 12795072 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 1D

QU112A 12795073 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 2A

QU112B 12795074 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 2B

QU112C 12795075 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 2C

QU112D 12795076 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 1 - QUADRANT 2D

QU121A 12795077 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 2 - QUADRANT 1A

QU121B 12795078 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 2 - QUADRANT 1B

QU121C 12795079 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 2 - QUADRANT 1C

QU121D 12795080 PARTIAL EQUIPMENT/UTILITY PLAN - LEVEL 2 - QUADRANT 1D

-- End of Document --

DOCUMENT 00 01 15 Page 23

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 24

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes construction of a new two-story Medical and Dental Clinic AS4021 and the demolition of the old Medical and Dental Clinic AS100 after the new clinic has been occupied and incidental related work.

1.2.2 Location

The new construction work is located at AS4021 on Canal Street and the demolition work is located at AS100 on White Street at Marine Corps Air Station New River, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 72 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating

SECTION 01 11 00 Page 1

Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.5 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS

1.5.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel ; G

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.2.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.2.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for

SECTION 01 14 00 Page 1 access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.2.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.