N4008519R9031-0009_UN_PRICED_ELINS_19-R-9031.xls
XLS spreadsheet 429 KB Posted
- Solicitation number
- N4008519R9031
About this file
N4008519R9031-0009_UN_PRICED_ELINS_19-R-9031.xls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_J-0200000-06.pdf | ||
| N4008519R9031-0009.pdf | ||
| N4008519R9031-0008.pdf | ||
| Vehicle-_CESE_Inventory_for_Consolidated_Service_Contract.xlsx | XLSX spreadsheet | |
| ATTACHMENT_C-_PPQ.pdf | ||
| N4008519R9031-0007.pdf | ||
| N4008519R9031-0006.pdf | ||
| N4008519R9031_Questions_and_Responses.pdf | ||
| J-1502000-03_thru_08_Inventory.xlsx | XLSX spreadsheet | |
| Channels_2017.xlsx | XLSX spreadsheet | |
| N4008519R9031-0005.pdf | ||
| N4008519R9031-Attachments.zipx | ZIPX file | |
| 1502000_J_Facility_Investment_ver_2.4.pdf | ||
| Attachment_J-1502000-07.zipx | ZIPX file | |
| N4008519R9031-0004.pdf | ||
| N4008519R9031-0003.zipx | ZIPX file | |
| J-1502000-03_thru_08_Inventory.xlsx | XLSX spreadsheet | |
| N4008519R9031-0003.pdf | ||
| 1501000_FAP_Facility_Management_v2.0.pdf | ||
| Amendment_0002.pdf | ||
| UN_PRICED_ELINS_19-R-9031.xls | XLS spreadsheet | |
| N4008519R9031-Section_J_Attachments.zipx | ZIPX file | |
| N4008519R9031-0001.pdf | ||
| N4008519R9031.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| CLIN 0001 | CLIN 0002 | |
| CLIN 0003 | CLIN 0004 | |
| CLIN 0005 | CLIN 0006 | |
| CLIN 0007 | CLIN 0008 | |
| CLIN 0009 | CLIN 0010 | |
| Total RP | Total NRP | |
| Est. Total |
Base Period Recurring
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0001 Recurring Work - Base Period | ||||||
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A008 | ||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| CNIC | Facility Investment 1502000 | |||||
| Newport, RI | ||||||
| A001 | Region Spec Item 3 | |||||
| A001AA | Emergency Service Orders | 1 | EA | |||
| A001AB | Urgent Service Orders | 3 | EA | |||
| A001AC | Routine Service Orders | 7 | EA | |||
| A001AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| A001AE | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| A001AF | Preventive Maintenance (Plymo-Vent System) | 12 | Month | |||
| A001AG | Preventive Maintenance (Swimming Pool Equipment and System) | 12 | Month | |||
| A002 | Other (Training Pool) 1503040 | |||||
| A002AA | Pool Maintenance Bldg. 1357 | 12 | Month | |||
| A002AB | Water Treatment Bldg. 1357 | 12 | Month | |||
| A002AC | Pool Maintenance Bldg. 1109 | 12 | Month | |||
| A002AD | Water Treatment Bldg. 1109 | 12 | Month | |||
| A003 | Facility Management 1501000 | |||||
| A003AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL CNIC | ||||||
| NUWC | ||||||
| A004 | Facility Investment 1502000 | |||||
| A004AA | Emergency Service Orders | 4 | EA | |||
| A004AB | Urgent Service Orders | 4 | EA | |||
| A004AC | Routine Service Orders | 11 | EA | |||
| A004AD | Preventive Maintenance (Overhead Doors) | 12 | Month | |||
| A004AE | Preventive Maintenance (Dock Levelers) | 12 | Month | |||
| A004AF | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| A004AG | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| A005 | Facility Management 1501000 | |||||
| A005AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NUWC | ||||||
| NWC | ||||||
| A006 | Facility Investment 1502000 | |||||
| A006AA | Reserved for Future Use | |||||
| A006AB | Urgent Service Orders | 2 | EA | |||
| A006AC | Routine Service Orders | 4 | EA | |||
| A006AD | Preventive Maintenance (SCADA for Boilers) | 12 | Month | |||
| TOTAL NWC | ||||||
| NHCNE | ||||||
| A007 | Facility Investment 1502000 | |||||
| A007AA | Reserved for Future Use | |||||
| A007AB | Urgent Service Orders | 1 | EA | |||
| A007AC | Routine Service Orders | 3 | EA | |||
| A007AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| A008 | Facility Management 1501000 | |||||
| A008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NHCNE | ||||||
| TOTAL RECURRING LINE ITEMS |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Base Period-Non-Recurring
| ATTACHMENT J-0200000-15 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0002 Non-Recurring Work - Base Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A703 | |||||||
| ELIN | Facility Investment | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 500 | HR | |||
| ELIN | Vehicle Repair | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| A701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | |||
| ELIN | Boiler Rental | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 12 | Month | |||
| A703 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $20,000.00 | $ 20,000.00 | |
| TOTAL NON-RECURRING WORK |
1st Opt Period-Recurring
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0003 Recurring Work Price - 1st Opt Period | ||||||
| PROVIDE PRICES FOR RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 through B008 | ||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| CNIC | Facility Investment 1502000 | |||||
| Newport, RI | ||||||
| B001 | Region Spec Item 3 | |||||
| B001AA | Emergency Service Orders | 1 | EA | |||
| B001AB | Urgent Service Orders | 3 | EA | |||
| B001AC | Routine Service Orders | 7 | EA | |||
| B001AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| B001AE | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| B001AF | Preventive Maintenance (Plymo-Vent System) | 12 | Month | |||
| B001AG | Preventive Maintenance (Swimming Pool Equipment and System) | 12 | Month | |||
| B002 | Other (Training Pool) 1503040 | |||||
| B002AA | Pool Maintenance Bldg. 1357 | 12 | Month | |||
| B002AB | Water Treatment Bldg. 1357 | 12 | Month | |||
| B002AC | Pool Maintenance Bldg. 1109 | 12 | Month | |||
| B002AD | Water Treatment Bldg. 1109 | 12 | Month | |||
| B003 | Facility Management 1501000 | |||||
| B003AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL CNIC | ||||||
| NUWC | ||||||
| B004 | Facility Investment 1502000 | |||||
| B004AA | Emergency Service Orders | 4 | EA | |||
| B004AB | Urgent Service Orders | 4 | EA | |||
| B004AC | Routine Service Orders | 11 | EA | |||
| B004AD | Preventive Maintenance (Overhead Doors) | 12 | Month | |||
| B004AE | Preventive Maintenance (Dock Levelers) | 12 | Month | |||
| B004AF | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| B004AG | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| B005 | Facility Management 1501000 | |||||
| B005AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NUWC | ||||||
| NWC | ||||||
| B006 | Facility Investment 1502000 | |||||
| B006AA | Reserved for Future Use | |||||
| B006AB | Urgent Service Orders | 2 | EA | |||
| B006AC | Routine Service Orders | 4 | EA | |||
| B006AD | Preventive Maintenance (SCADA for Boilers) | 12 | Month | |||
| TOTAL NWC | ||||||
| NHCNE | ||||||
| B007 | Facility Investment 1502000 | |||||
| B007AA | Reserved for Future Use | |||||
| B007AB | Urgent Service Orders | 1 | EA | |||
| B007AC | Routine Service Orders | 3 | EA | |||
| B007AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| B008 | Facility Management 1501000 | |||||
| B008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NHCNE | ||||||
| TOTAL RECURRING LINE ITEMS |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
1st Opt Non-Recurring
| ATTACHMENT J-0200000-15 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0004 Non-Recurring Work - 1st Opt Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B703 | |||||||
| ELIN | Facility Investment | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 500 | HR | |||
| ELIN | Vehicle Repair | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| B701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | |||
| ELIN | Boiler Rental | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| B702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 12 | Month | |||
| B703 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $20,000.00 | $ 20,000.00 | |
| TOTAL NON-RECURRING WORK |
2nd Opt-Recurring
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0005 Recurring Work Price - 2nd Opt Period | ||||||
| PROVIDE PRICES FOR RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs C001 through C008 | ||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| CNIC | Facility Investment 1502000 | |||||
| Newport, RI | ||||||
| C001 | Region Spec Item 3 | |||||
| C001AA | Emergency Service Orders | 1 | EA | |||
| C001AB | Urgent Service Orders | 3 | EA | |||
| C001AC | Routine Service Orders | 7 | EA | |||
| C001AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| C001AE | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| C001AF | Preventive Maintenance (Plymo-Vent System) | 12 | Month | |||
| C001AG | Preventive Maintenance (Swimming Pool Equipment and System) | 12 | Month | |||
| C002 | Other (Training Pool) 1503040 | |||||
| C002AA | Pool Maintenance Bldg. 1357 | 12 | Month | |||
| C002AB | Water Treatment Bldg. 1357 | 12 | Month | |||
| C002AC | Pool Maintenance Bldg. 1109 | 12 | Month | |||
| C002AD | Water Treatment Bldg. 1109 | 12 | Month | |||
| C003 | Facility Management 1501000 | |||||
| C003AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL CNIC | ||||||
| NUWC | ||||||
| C004 | Facility Investment 1502000 | |||||
| C004AA | Emergency Service Orders | 4 | EA | |||
| C004AB | Urgent Service Orders | 4 | EA | |||
| C004AC | Routine Service Orders | 11 | EA | |||
| C004AD | Preventive Maintenance (Overhead Doors) | 12 | Month | |||
| C004AE | Preventive Maintenance (Dock Levelers) | 12 | Month | |||
| C004AF | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| C004AG | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| C005 | Facility Management 1501000 | |||||
| C005AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NUWC | ||||||
| NWC | ||||||
| C006 | Facility Investment 1502000 | |||||
| C006AA | Reserved for Future Use | |||||
| C006AB | Urgent Service Orders | 2 | EA | |||
| C006AC | Routine Service Orders | 4 | EA | |||
| C006AD | Preventive Maintenance (SCADA for Boilers) | 12 | Month | |||
| TOTAL NWC | ||||||
| NHCNE | ||||||
| C007 | Facility Investment 1502000 | |||||
| C007AA | Reserved for Future Use | |||||
| C007AB | Urgent Service Orders | 1 | EA | |||
| C007AC | Routine Service Orders | 3 | EA | |||
| C007AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| C008 | Facility Management 1501000 | |||||
| C008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NHCNE | ||||||
| TOTAL RECURRING LINE ITEMS |
2nd Opt -Non-Recurring
| ATTACHMENT J-0200000-15 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0006 Non-Recurring Work - 2nd Opt Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C700 through C703 | |||||||
| ELIN | Facility Investment | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 500 | HR | |||
| ELIN | Vehicle Repair | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| C701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | |||
| ELIN | Boiler Rental | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| C702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 12 | Month | |||
| C703 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $20,000.00 | $ 20,000.00 | |
| TOTAL NON-RECURRING WORK |
3rd Opt Recurring
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0007 Recurring Work Price - 3rd Opt Period | ||||||
| PROVIDE PRICES FOR RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs D001 through D008 | ||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| CNIC | Facility Investment 1502000 | |||||
| Newport, RI | ||||||
| D001 | Region Spec Item 3 | |||||
| D001AA | Emergency Service Orders | 1 | EA | |||
| D001AB | Urgent Service Orders | 3 | EA | |||
| D001AC | Routine Service Orders | 7 | EA | |||
| D001AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| D001AE | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| D001AF | Preventive Maintenance (Plymo-Vent System) | 12 | Month | |||
| D001AG | Preventive Maintenance (Swimming Pool Equipment and System) | 12 | Month | |||
| D002 | Other (Training Pool) 1503040 | |||||
| D002AA | Pool Maintenance Bldg. 1357 | 12 | Month | |||
| D002AB | Water Treatment Bldg. 1357 | 12 | Month | |||
| D002AC | Pool Maintenance Bldg. 1109 | 12 | Month | |||
| D002AD | Water Treatment Bldg. 1109 | 12 | Month | |||
| D003 | Facility Management 1501000 | |||||
| D003AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL CNIC | ||||||
| NUWC | ||||||
| D004 | Facility Investment 1502000 | |||||
| D004AA | Emergency Service Orders | 4 | EA | |||
| D004AB | Urgent Service Orders | 4 | EA | |||
| D004AC | Routine Service Orders | 11 | EA | |||
| D004AD | Preventive Maintenance (Overhead Doors) | 12 | Month | |||
| D004AE | Preventive Maintenance (Dock Levelers) | 12 | Month | |||
| D004AF | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| D004AG | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| D005 | Facility Management 1501000 | |||||
| D005AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NUWC | ||||||
| NWC | ||||||
| D006 | Facility Investment 1502000 | |||||
| D006AA | Reserved for Future Use | |||||
| D006AB | Urgent Service Orders | 2 | EA | |||
| D006AC | Routine Service Orders | 4 | EA | |||
| D006AD | Preventive Maintenance (SCADA for Boilers) | 12 | Month | |||
| TOTAL NWC | ||||||
| NHCNE | ||||||
| D007 | Facility Investment 1502000 | |||||
| D007AA | Reserved for Future Use | |||||
| D007AB | Urgent Service Orders | 1 | EA | |||
| D007AC | Routine Service Orders | 3 | EA | |||
| D007AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| D008 | Facility Management 1501000 | |||||
| D008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NHCNE | ||||||
| TOTAL RECURRING LINE ITEMS |
3rd Opt Non-Recurring
| ATTACHMENT J-0200000-15 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0008 NON-RECURRING WORK - 3rd Opt Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D700 through D703 | |||||||
| ELIN | Facility Investment | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 500 | HR | |||
| ELIN | Vehicle Repair | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| D701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | |||
| ELIN | Boiler Rental | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| D702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 12 | Month | |||
| D703 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $20,000.00 | $20,000.00 | |
| TOTAL NON-RECURRING WORK |
4th Opt Recurring
| ATTACHMENT J-0200000-15 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0009 Recurring Work Price - 4th Opt Period | ||||||
| PROVIDE PRICES FOR RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs E001 through E008 | ||||||
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| CNIC | Facility Investment 1502000 | |||||
| Newport, RI | ||||||
| E001 | Region Spec Item 3 | |||||
| E001AA | Emergency Service Orders | 1 | EA | |||
| E001AB | Urgent Service Orders | 3 | EA | |||
| E001AC | Routine Service Orders | 7 | EA | |||
| E001AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| E001AE | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| E001AF | Preventive Maintenance (Plymo-Vent System) | 12 | Month | |||
| E001AG | Preventive Maintenance (Swimming Pool Equipment and System) | 12 | Month | |||
| E002 | Other (Training Pool) 1503040 | |||||
| E002AA | Pool Maintenance Bldg. 1357 | 12 | Month | |||
| E002AB | Water Treatment Bldg. 1357 | 12 | Month | |||
| E002AC | Pool Maintenance Bldg. 1109 | 12 | Month | |||
| E002AD | Water Treatment Bldg. 1109 | 12 | Month | |||
| E003 | Facility Management 1501000 | |||||
| E003AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL CNIC | ||||||
| NUWC | ||||||
| E004 | Facility Investment 1502000 | |||||
| E004AA | Emergency Service Orders | 4 | EA | |||
| E004AB | Urgent Service Orders | 4 | EA | |||
| E004AC | Routine Service Orders | 11 | EA | |||
| E004AD | Preventive Maintenance (Overhead Doors) | 12 | Month | |||
| E004AE | Preventive Maintenance (Dock Levelers) | 12 | Month | |||
| E004AF | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| E004AG | Preventive Maintenance (Disabled Doors) | 12 | Month | |||
| E005 | Facility Management 1501000 | |||||
| E005AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NUWC | ||||||
| NWC | ||||||
| E006 | Facility Investment 1502000 | |||||
| E006AA | Reserved for Future Use | |||||
| E006AB | Urgent Service Orders | 2 | EA | |||
| E006AC | Routine Service Orders | 4 | EA | |||
| E006AD | Preventive Maintenance (SCADA for Boilers) | 12 | Month | |||
| TOTAL NWC | ||||||
| NHCNE | ||||||
| E007 | Facility Investment 1502000 | |||||
| E007AA | Reserved for Future Use | |||||
| E007AB | Urgent Service Orders | 1 | EA | |||
| E007AC | Routine Service Orders | 3 | EA | |||
| E007AD | Preventive Maintenance (Automatic Doors) | 12 | Month | |||
| E008 | Facility Management 1501000 | |||||
| E008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | Month | |||
| TOTAL NHCNE | ||||||
| TOTAL RECURRING LINE ITEMS |
4th Opt Non-Recurring
| ATTACHMENT J-0200000-15 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT # N40085-19-R-9031 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0010 Non-Recurring Work - 4th Opt Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E700 through E703 | |||||||
| ELIN | Facility Investment | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 500 | HR | |||
| ELIN | Vehicle Repair | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| E701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | |||
| ELIN | Boiler Rental | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| E702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate month of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate month of effort. | 12 | Month | |||
| E703 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 1 | LS | $20,000.00 | $ 20,000.00 | |
| TOTAL NON-RECURRING WORK |
File details come from the government source that posted it.