About this file

N4008519R9031-0007.pdf

View the file

Other files

File Type Posted
N4008519R9031-0009_UN_PRICED_ELINS_19-R-9031.xls XLS spreadsheet
Attachment_J-0200000-06.pdf PDF
N4008519R9031-0009.pdf PDF
N4008519R9031-0008.pdf PDF
Vehicle-_CESE_Inventory_for_Consolidated_Service_Contract.xlsx XLSX spreadsheet
ATTACHMENT_C-_PPQ.pdf PDF
N4008519R9031-0006.pdf PDF
N4008519R9031_Questions_and_Responses.pdf PDF
J-1502000-03_thru_08_Inventory.xlsx XLSX spreadsheet
Channels_2017.xlsx XLSX spreadsheet
N4008519R9031-0005.pdf PDF
N4008519R9031-Attachments.zipx ZIPX file
1502000_J_Facility_Investment_ver_2.4.pdf PDF
Attachment_J-1502000-07.zipx ZIPX file
N4008519R9031-0004.pdf PDF
N4008519R9031-0003.zipx ZIPX file
J-1502000-03_thru_08_Inventory.xlsx XLSX spreadsheet
N4008519R9031-0003.pdf PDF
1501000_FAP_Facility_Management_v2.0.pdf PDF
Amendment_0002.pdf PDF
UN_PRICED_ELINS_19-R-9031.xls XLS spreadsheet
N4008519R9031-Section_J_Attachments.zipx ZIPX file
N4008519R9031-0001.pdf PDF
N4008519R9031.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

BASE OPERATION AND SUPPORT (BOS) CONTRACT FOR FACILITY INVESTMENT AND FACILITY MANAGEMENT SERVICES AT NAVAL STATION NEWPORT (NAVSTA), NEWPORT, RHODE ISLAND AND LOCATIONS WITHIN THE MID-ATLANTIC AREAS OF RESPONSIBILITY

This amendment is issued to provide proposal inquires and responses related to the proposal.

This amendment is also to extend the proposal due date from Monday, March 4, 2019 to Wednesday, March 6, 2019.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9031

X 9B. DATED (SEE ITEM 11)

28-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Feb-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

Proposal Inquiry Questions and Answers

1. Section L.4 Disposition of Proposals, paragraph b (1) Offeror shall submit one (1) marked “Original” and two (2) copies, each in a separate three-ring binder with following characteristics” and Paragraph L.4, paragraph (i) Solicitation Submittal Requirements: Offerors shall submit one (1) original and one (1) copy of the price proposal.

Answer: See Amendment 0001

2. Section M, page 211, 252.211-7002. Availability for Examination of Specifications, Standards, Plans, Drawings, Data Item Descriptions, and Other Pertinent Documents Could you please clarify where the technical library for documents associated with this solicitation is located? Is it located at NAVSTA Newport, RI or in the Naval Facilities Engineering Command in Norfolk, VA Answer: See Amendment 0003

3. Reference Sub Annex 15020000, Facility Investment • 3.1 Service Orders – The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements.

Given that 1) the Government is not providing historical data for service orders, and 2) lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified, what materials and equipment is the Contractor to stock?

Answer: Attachment J-1502000-01 Definitions and Acronyms. See Definition for Service Order.

4. 3.2 Preventive Maintenance (PM) Program – The Contractor is fully responsible for and shall perform any repairs...up to a total of $250 per occurrence….under the recurring work portion of the contract. Reference Sub Annex 15020000, Facility Investment

Historical data (past estimates) is required to price this requirement. Will the Government please provide this historical data?

Answer: See Amendment 0003

5. Reference Sub Annex 15020000, Facility Investment 2.2.1 Certification, Training &

Licensing –

What is the workload/quantity on boilers and UPVs? What is the workload/quantity on cranes and railroad trackage? What is the workload/quantity on backflow preventers?

What is the workload/quantity on VTEs? What is the workload/quantity on engine test facilities? What is the workload/quantity on lighting arrestors and grounding devices?

What is the workload/quantity on transformers? What is the workload/quantity on cathodic protection?

6. Reference Section C – Descriptions 1.1 Outline of Services, Annex 17 Base Support Vehicles and Equipment N/A, and Sub Annex 1700000 – Base Support Vehicles and Equipment and ELIN B701 Vehicle Repair

The “N/A” included in listing of Annex 17 BSVE indicates it does not apply; please confirm that BSVE is a requirement under this contract.

If BSVE is a requirement, Please provide the BSVE vehicle and equipment list. Please provide historical data of money spent on repairs. Will the Government pay for all BSVE parts and materials?

7. Reference Annex 1, General Information 1.2 Project Location

Would the Government please provide the inventory for SCADA (Boilers)?

8. Reference Annex 2, Management and Administration and Attachment J-0200000-06, Government-Furnished Property, Materials, and Services 2.5 Contractor-Furnished Items. “Except for the items identified as Attachment J-0200000-06, Government- Furnished Property, Materials, and Services. “To be Given after Contract Award.

“Government Furnished….

A Contractor cannot provide a credible bid without knowing what these property, services and materials are. Will the Government please provide the list of Government- Furnished Property, Materials, and Services?

9. Reference Annex 2, Management and Administration 2.6.4 Deliverables. “The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F….”

Is this secured website maintained on government systems?

10. Reference Annex 2, Management and Administration 2.4.2 Government-furnished Utilities. “…. Provide and maintain backflow prevention devices on connections ….”

What is the quantity of backflow prevention devices?

What is the workload for this maintenance?

11. Reference Annex 2, Management and Administration 2.6.6 NAVFAC MAXIMO and

2.6.6.1 MAXIMO Data. “Work order asset, specification……Annex 16 Utilities sub-annexes and Annex 1700000 BSVE.”

Are utilities, electrical, water and BSVE included in this contract?

12. Reference Annex 2, Management and Administration 2.8.7 Security Clearances

Please clarify what level(s) of security clearance are required?

Please clarify which employees require a security clearance?

13. Reference Annex 2, Management and Administration 2.9.3.4 Critical Lift Plan

What are the quantities, types and sizes of cranes assigned to this contract?

14. Reference Annex 2, Management and Administration 2.9.4 Crane Operations and

2.9.4.3 Crane Operators

Please clarify if the Contractor is responsible for providing the crane operators?

Who is responsible for paying for crane weight certifications?

15. Reference Annex 2, Management and Administration 2.9.4.2 Rigging Gear

Please clarify if the Contractor is responsible for providing rigging personnel?

16. Reference Annex 2, Management and Administration 2.9.6 Fire Protection

Would the Government please provide a map of fire alarm locations?

Answer: Fire alarms are not on this contract

17. Reference Attch J-0200000-01 Definitions and Acronyms Pre-Expended Bin and Materials and Supplies

Who funds these items?

Answer: Contractor's Responsibility

18. Reference Attch J-1503040-4 Pools Historical Data Bldg 1357, Combat Training Pool, Does the Government pay for CO2, Chlorine and UV bulbs?

Answer: Contractor's Responsibility

19. Reference Attch J-0200000-15, Exhibit Line Item Numbers (ELINS)

Would the Government please provide the ELINs for Fire Suppression Systems and the Disabled Access Swing Door?

Answer: See Amendment 0001- Excel Spreadsheet- Unpriced ELINS

20. Reference Attch J-0200000-15, Exhibit Line Item Numbers (ELINs) 0002, 0004, 0006, 0008, 0010 A700, B700, C700, D700 and E700, Unit Prices Labor Work. “Provide labor to perform all Unit Priced Labor work ……” Would the Government please identify the labor categories that fall under into these

ELINS?

Answer: See Amendment 0001

21. Reference Attch J-020000-15, Exhibit Line Item Numbers (ELINS), Line Item 0001 Would the Government please provide the ELIN for Cranes?

Answer: No ELIN will be provided for cranes. Reference 0200000 Management and Administration Spec Item 2.9.4

22. Reference Attachment J-15020000-01, Definitions and Acronyms Integrated Maintenance Program (IMP)

Please provide list of the systems and equipment the Contractor is responsible for maintaining/repairing under IMP When repairs are required with these systems and equipment, are they at the expense of the

Contractor?

Answer: IMP is not part of this contract

23. Reference Annex 0100000, General Information; 0200000, Management and

Administration; and Sub Annex 15010000, Facility Management 1.5 Verification of Workload and Conditions; 2.12 Technical Library; and 1.1 Concept of Operations

What are the hours of operation and location of the technical library?

24. Reference Sub Annex 1502000, Facility Investment 1.1 Concept of Operations

“…... Facility Investment includes maintenance only for auxiliary generators serving individual facilities.”

How many auxiliary generators are there?

Is load bank testing included in contractor responsibilities?

What is the auxiliary generators maintenance schedule?

Who supplies the fuel for the auxiliary generators?

Answer: Generators are not part of this contract

25. Reference 3.1. Will the contractor be required to have cac cards to update the inventory in MAXIMO? ICAP services what is the allotted time to perform the inventory and condition reports? Maintenance equipment items 151- 160 if this equipment is found unrepairable is the contractor reasonable for replacement?

Answer: (1) Yes and a CAC Card Reader. (2) Reference 1501000-C Facility Management Spec Item 3.1 for ICAP (3) No

26. Section C- Spec Item 2.3.3.3, 2.7.1.1-4. Are offerors allowed to “dual-hat” key personnel, i.e. Quality Manager and Site Safety and Health Officer? Please confirm that the successful contractor is required to provide an Environmental/Energy Manager.

Answer: (1) Reference 0200000-Management and Administration 2.7.1.1 thru

2.7.1.3 (2) Reference 0200000-Management and Administration 2.7.1.4

27. ATTACHMENT J-0200000-05-01-5. Are the forms referenced in Attachment J-

0200000-05-01-5 required in the performance of the contract?

Answer: Yes

28. Reference: L.4.b.1, L.4.2 Factor 2. Please confirm that an approved Joint Venture

Agreement is not required since this procurement is being solicited as a full and open/unrestricted procurement.

Answer: Refer to RFP Section M

29. Reference: Attachment J-0200000-16. Is the form referenced in Attachment J-0200000- 16 still required since procurement is being solicited as a full and open/unrestricted procurement?

Answer: Yes

30. Reference: Attachment J-0200000-17. Please provide Attachment J-0200000-17 in a file that can be edited.

Answer: See Amendment 0005 Attachments

31. Reference: L.4.b.1.2 Factor 2- Recent/Relevant Experience of the Firm. Please provide

Attachment D referenced in L.4.b.1.2 Factor 2- Recent/Relevant Experience of the Firm Answer: See Amendment 0005 Attachments

32. Reference: L.4.b.1.4 Factor 4- Small Business Utilization. Please confirm that Factor 4 does not apply to offerors who are considered “Small” in NAICS 561210 Facilities Support Services.?

Answer: Refer to RFP Section M- Factor 4

33. Reference: J-0200000-18 – Past Performance Questionnaire Letter. The link to the current NAVFAC Form PPQ-0 dated 7 December 2011 does not work and returns the following “HTTP Error 404. The requested resource is not found.”. Please provide the NAVFAC Form PPQ as a separate file?

Answer: See Amendment 0005 Attachments

34. Can you please provide me with the list of contractor's who attended the site visit for

N4008519R9031 BOS Facility Management services at Naval Station Newport?

Answer: See Amendment 0005

35. RFP M.4, Section 2 (i) references Attachment D. There is no Attachment D included.

However, there is ATTACHMENT J-0200000-17, CORPORATE EXPERIENCE INDIVIDUAL PROJECT DATA SHEET. First is this the Mandatory Attachment D?

Second, it appears that ATTACHMENT J-0200000-17 is missing the second page of that Attachment, which typically contains boxes 11 – 15. Was it the government’s intent to only provide the first page?

Answer: See Amendment 0005 Attachments

36. Section M, Factor 4, paragraph (ii) a. Attachment C as Small Business Subcontracting

Record. This form is also referenced as Attachment G. There is no Attachment C or G and nothing called a Small Business Contracting Record Form? Will the government please provide that form?

Answer: See Amendment 0005 Attachments

37. Section M Factor 4, Paragraph (ii) on page 219. Lists attachment H as Small Business

Participation and Commitment Strategy form. There is no attachment H and no attachments in J 0200000 named: Small Business Participation and Commitment Strategy. Please provide that form.

Answer: See Amendment 0005 Attachments

38. Attachment E, is referenced as both CONTRACTOR’S SELF-PERFORMANCE

CERTIFICATION AND NOTIFICATION OF SUBCONTRACTING and as the Small Business Participation and Commitment Strategy. Please confirm that attachment E is actually ATTACHMENT J-0200000-16 - CONTRACTOR’S SELF-PERFORMANCE

CERTIFICATION AND NOTIFICATION OF SUBCONTRACTING.

Answer: See Amendment 0005 Attachments

39. Attachment J-152000-03 and CNIC Power Doors tab. On row 16 of the file it provides partial information only. On row 23 for building 1312 the Quantity of doors is blank.

Answer: Row 16 has been deleted and requested information for Row 23 is not available.

40. Attachment J-152000-03 and CNIC Suppression System. There is an ELIN referenced, A001AG on this inventory. On the ELIN Schedule this same ELIN is used to price Preventive Maintenance (Swimming Pool Equipment and Systems). Would the Government please review and advise where we are to price CNIC Suppression System requirements?

Answer: Suppression Systems are not part of this contract

41. Attachment J-152000-03 and CNIC Ply-MO Vent tab. The tab references ELIN

A001AH. This ELIN does not exist on the ELIN Schedule. Would the Government please review and advise where we are to price CNIC Ply-Mo Vent requirements?

Answer: Inventory has been revised and Ply-Mo Vent shall be priced on ELIN A001AF, B001AF, C001AF, D001AF and E001AF

42. Solicitation, page 146, ATTACHMENT J-0200000-17 - CORPORATE EXPERIENCE

INDIVIDUAL PROJECT DATA SHEET, and Solicitation, Amendment 0003, page 10, the statement “The attached Relevant Experience Form (Attachment D) is MANDATORY and SHALL be used to submit project information. There does not appear to be an Attachment D in the solicitation.

Answer: See Amendment 0005 Attachments

43. Would the Government please clarify whether ATTACHMENT J-0200000-17 -

CORPORATE EXPERIENCE INDIVIDUAL PROJECT DATA SHEET is to be used in place of Attachment D?

Answer: See Amendment 0005 Attachments

44. Amendment 3, Attachment J-1502000-03 Overhead Doors Inventory. There are several line items in the inventory that do not indicate whether the “Opener Type” for the door is Manual or Electric. This includes some, but not necessarily all of the line items for buildings 47, 149, 654, and 35.

Answer: Information requested is not available

45. Would the Government please review the Overhead Doors Inventory and provide the

“Opener Type” for the inventory line items that do not have this information included?

Answer: Information requested is not available

46. Annex 1502000- Facility Investment, Specification Item 3.2.7 SCADA Systems for

Boilers, the statement “The contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair. Is the contractor responsible for firmware and software upgrades for the systems? If so is there any historical data on these costs? Does the limit of liability apply to these system updates?

Answer: Contractor's not responsible for upgrades, there is no historical data for such. Contractor is responsible for all hard wired (and wireless) input and output equipment associated with Delta V controllers. See "Channels 2017.xlsx" doc.

47. Reference L.4 (b) (4) Factor 4 Small Business Utilization. We are a small disadvantaged business submitting a proposal for this effort as a prime contractor. All of our Corporate Experience projects are small business set-asides and have no small business subcontracting plan requirements. We have no ISRs and would meet the 20% small business participation requirement simply by serving as the prime contractor. Question:

Are small businesses required to submit small business subcontracting information in support of Factor 4?

Answer: Yes. Refer to RFP- Factor 4- Small Business Utilization (i) 1a

48. Reference L.4 (b) (1) Non-cost/price Factors Submission Requirements. There are several references to Attachment E but we cannot locate Attachment E. Question: Is Attachment J-0200000-16 the proper Attachment we need to use for the Contractor’s Self- Performance Certification and Notification of Subcontracting?

Answer: Yes. Refer to RFP and also included in Amendment 0005

49. Reference L.4 (b) (2) Factor 2 Recent/Relevant Experience of the Firm. The RFP states that Attachment D for Corporate Relevant Experience is mandatory but we cannot locate Attachment D. Question 3A: Is Attachment J-0200000-17 the proper Attachment we need to use for the Relevant Experience Form? Question 3B: There is no block included on Attachment J-0200000-17 for Contract/Project Description. If this Attachment is mandatory for submittal of project information to determine relevance, where on this attachment are we to include project description?

Answer: See Amendment 0005 Attachments

50. Reference L.4 (b) (1) Factor 1 Management Approach (i) b. The RFP states “

Demonstrate your ability to provide key personnel in accordance with RFP Section 2.7.1 through 2.7.1.6 and provide a workforce management plan…” but there is no spec item

2.7.1.5 or 2.7.1.6. Question 4A: Should this read “RFP Section 2.7.1 through 2.7.1.4”?

Question 4B: Is the RFP requiring key personnel resumes or just a personnel recruitment plan to satisfy this requirement?

Answer: Refer to RFP- Factor 1 Management Approach (i)b

51. Reference L.4 (b) (1) Factor 1 Management Approach (i) b and Section C 0200000 2.7.1.

The RFP references the PM, Quality Manager, SSHO, and on-site supervisor(s) as key personnel. There is no Spec Item for On-Site Supervisor(s) but there is for Environmental/Energy Manager (2.7.1.4). Question: Are On-Site Supervisor and

Environmental/Energy Manager both key positions, and if so, can they be the same person?

Answer: Yes

52. Reference Amendment 0003. There is a file named: 1502000 J Facility Investment ver

2.4.pdf but appears to be the same file as 0200000 C Management and Administration ver 2.8.pdf. Question: Can the Government release the correct revised 1502000 J Facility Investment?

Answer: See Amendment 0004

53. Reference L.4 (b) (1) Non-cost/price Factors Submission Requirements. Can tables/charts/graphics be in a smaller font size than the 12 point Arial or Times New Roman narrative?

Answer: Refer to instructions in RFP

54. Reference L.4(b) Price Proposal (i) and M.1 B.3.(a)(1) Price Proposal. Section L does not call out a requirement for a Small Business Subcontracting Plan; however, Section M states: “Submit a Small Business Subcontracting Plan for this project in the format provided in Attachment F”. Question 8A: Is a small business subcontracting plan required for the Price Proposal? Question 8B: If so, are all offerors (including small business offerors) required to submit a plan? Question 8C: We cannot locate Attachment F; can the Government please release Attachment F?

Answer: See Revised Section L- Price Proposal. Amendment 0006

55. Reference Attachment F SMALL BUSINESS SUBCONTRACTING PLAN. This form states: “(TO BE SUBMITTED BY OTHER THAN SMALL BUSINESSES ONLY) (Also referred to as large businesses).” Are small businesses to omit this form from the Price Proposal?

Answer: Per Attachment F Small Business Subcontracting Plan. To be submitted by other than small business only (Also referred to as large businesses).

56. Amendment 6, Page 6 of 8, Paragraph 4 i 1 a States: All offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment C, Small Business Subcontracting Record

Answer: See Amendment 0005 Attachment F- Small Business Subcontracting Record

57. In addition, the Amendment also lists attachment C as the PPQ. I am sure that is just a carryover from the previous documents, but please clarify if Attachment C is the Small Business Subcontracting Record or the PPQ? Also, Attachment G from Amendment 5 is the Subcontracting Self-Performance Certification which cites FAR Clause 52.219-14, which applies only to set asides. This is a full and open competition and I am wondering if this form was supposed to be the record form and not the self-performance form?

Answer: See Amendment 0007- Attachment C-Past Performance Questionnaire .

Attachment G Subcontracting Self-Performance Certification form is included even though this procurement is unrestricted. The awardee could be a small business, and as such, would be required to adhere to FAR 52.219-14 Limitations of Subcontracting. The form does not apply to large business entities.

58. If the hours for ELIN X701 are required to be priced, the contractors would need information concerning the different types and size of equipment required to be maintained in-order that we would proposed and price the proper mechanics with the proper level of certifications and training.

Answer: See Amendment 0007- Vehicle & CESE Inventory Spreadsheet

59. In X702 we would need detailed information on the potential different types of boilers to be maintained /operated to ensure we price the proper technicians to accompany the boiler requirements.

Answer: See Amendment 0003

60. Will the Government please review these ELINS and provide direction? In X703, is this

ELIN for the boilers that we would be required to provide after negotiations?

(End of Summary of Changes)