Amendment_0001.pdf
PDF 149 KB Posted
- Solicitation number
- N4008519R9022
About this file
Amendment_0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Navy_Portsmouth_IHA_2019.pdf | ||
| Amendment_0015.pdf | ||
| Amendment_0014.pdf | ||
| Amendment_0013.pdf | ||
| Amendment_0012.pdf | ||
| Amendment_0011.pdf | ||
| Document_Security_P310_OP5_Manual.doc | DOC document | |
| Attachment_F_Rev._4-5_6_amendment_10_with_redesign.docx | DOCX document | |
| Amendment_0010.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| p310_p1074_spec_appE_GDR_addl_info.pdf | ||
| Attachment_F_Rev._4-5.docx | DOCX document | |
| PNSY_Stbliz_B1_2A_2B_Grt_Logs.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Log.pdf | ||
| Amendment_0002.pdf | ||
| SECNAV_5512_1_APPROVED_PASS_ID_FORM.pdf | ||
| RFP_N4008519R9022.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P-310 Dry Dock 1 Super Flood Basin & P-1074 Extend Portal Crane, Portsmouth Naval Shipyard, Kittery, ME
The purpose of this amendment is to replace the Pre-Proposal Conference/Site Visit Information in its entirety.
The proposal due date of 9 April 2019 remains unchanged.
See SF30 Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9022
X 9B. DATED (SEE ITEM 11)
19-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
Replace the text of the Pre-Proposal Conference/Site Visit Information section of 00 21 16 Instructions to Proposers with the following:
Pre-Proposal Conference/Site Visit Requirements and Information
Site Visit Date: Tuesday March 19, 2019 Time: 0900 Departure Location: Kittery Lions Club Parking Lot, 117 State Rd Kittery, ME 03904 Security Personnel and buses will meet attendees at the Lions Club Parking Lot to issue badges and board buses.
Buses will return everyone back to the Lions Club at the end of the site visit.
Base Access
1. Submit access requests no later than 2:00PM Friday March 8, 2019. Submit requests to Contract Specialist John Bishop, (757) 341-1979, john.p.bishop1@navy.mil DO NOT submit requests directly to the shipyard.
2. All site visitors are required to be listed on a visitor request written on company letter head with the following information:
a. First Name, Last Name, Middle Initial
b. US Citizen (Yes or No)
c. State of Residence
d. If individual holds a PNSY issued Green Badge and DBIDS (Yes or No)
e. Letter should state Site Visit is for solicitation N40085-19-R-9002 Dry Dock #1 Superflood Basin and P1074 Extend Portal Crane, Portsmouth Naval Shipyard, Kittery Me.
3. Each individual that does not have DBIDS shall complete the provided SECNAV 5512/1 form. Both social security number and drivers license number as well as state license is issued in are required.
4. A maximum of three attendees per contractor may be submitted.
5. All visitors must be U.S. Citizens.
6. All visitors shall be prepared to show a valid Government-issued photo ID to enter the facility. All visitors will be required to provide two of the following for proof of citizenship and access to the facility.
a. Valid United States Passport
b. Valid driver’s license
c. CERTIFIED copy of your birth certificate with raised seal
d. Please see the “REAL ID ACT” at https://www.dhs.gov/real-id/maine for more information on acceptable forms of ID while visiting the facility. If you do not have a valid license per the REAL ID Act, a passport or birth certificate and another form of ID listed from the website are required for access.
7. Electronics Restriction: Cameras, Cell phones with cameras, laptops, and other electronics are not permitted on the facility. Anyone found possessing these during the visit will be removed.
8. Contractors failing to provide complete information or submit information in a timely manner may be denied access.
N4008519R9022
(End of Summary of Changes)
File details come from the government source that posted it.