AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 12

AMENDMENT NO. 0006 12/23/19 1634017

ACQ1

NAVAL FACILITIES ENGINEERING COMMAND,

MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VA 23511-3095

See Item 6

✘ N4008519R8086

07/30/19

N4008519R8086 Design Build Marine Corps Air Station New River Facility Repairs, Phase II

The date and the hour for the receipt of proposals is extended to 22 January 2020 no later than 2:00 pm (EDT).

See continuation page(s).

19-0118 DB MCASNR Repairs, Phase 2 Solicitation N40085-19-R-8086 Marine Corps Air Station New River Amendment 0006

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. The following provides the Government’s responses to preaward inquiries:

REFERENCE

Page Section Para.

QUESTION GOVERNMENT RESPONSE

Part 3 - 4A.11.a

Building AS424 : "The roof to AS424 was replaced post-hurricane.

Coordinate with Public Works to ensure all work for the renovation is in accordance with and does not void the warranty." How and to whom do we proceed to contact specifically for this information and for pricing?

Contractor will need to contact roofing manufacturer, Cram Roofing.

RICARDO BELTRAN JR.

Assistant Project Manager ricardo@cramroofing.com

210.694.7815 x390

210.216.9730 cell 5171 Casa Bella San Antonio, TX 78249

Part 3 - 4B.9.a

Building AS3905 : "The roof to AS3905 was replaced post-hurricane.

Coordinate with Public Works to ensure all work for the renovation is in accordance with and does not void the warranty." How and to whom do we proceed to contact specifically for this information and for pricing?

Contractor will need to contact roofing manufacturer, Cram Roofing.

RICARDO BELTRAN JR.

Assistant Project Manager ricardo@cramroofing.com

210.694.7815 x390

210.216.9730 cell 5171 Casa Bella San Antonio, TX 78249

Part 3 - 4C.8.a

Building AS4108 : "The roof to AS4108 was replaced post-hurricane.

Coordinate with Public Works to ensure all work for the renovation is in accordance with and does not void the warranty." How and to whom do we proceed to contact specifically for this information and for pricing?

Contractor will need to contact roofing manufacturer, Cram Roofing.

RICARDO BELTRAN JR.

Assistant Project Manager ricardo@cramroofing.com

210.694.7815 x390

210.216.9730 cell 5171 Casa Bella San Antonio, TX 78249

Part 3 Chapter 4 Building Requirements repair ALL exterior concrete structures. Please provide assumed quantities for this requirement in order to ensure all bidders are including the same scope.

AS4108: The Contractor shall repair cracked and spalling concrete on all exterior concrete sidewalk, ramps, stairs, roads, and concrete pads up to 50 ft from hangar walls. The Contractor shall upgrade sidewalks to meet ADA requirements.

AS3905: The Contractor shall repair cracked and spalling concrete on all exterior concrete sidewalk, ramps, stairs, roads, and concrete pads up to 50 ft from hangar walls. The Contractor shall upgrade sidewalks to meet ADA requirements.

AS424: The Contractor shall repair cracked and spalling concrete on all exterior concrete loading dock, sidewalk, ramps, stairs, roads, and concrete pads up to 50 ft from warehouse walls. The Contractor shall upgrade sidewalks to meet ADA requirements.

Part 3 Chapters 4A, 4B, 4C

For each building, there is a requirement to conduct a code analysis to ensure compliance with current codes and standards. Please confirm that any deficiencies identified in this report which are not in the current RFP scope of work will be informational only, or will be performed as a change to the contract

It is the Contractor's responsibility to bring all elements of construction up to code, unless specifically excluded.

Due to the amount of forthcoming information, i.e. revised Part 3 and Part 6 per Amendment 4, and the responses to additional PPIs, please consider extending the proposal due date to provide at least 2 weeks from the issuance of all information

The Government will continue to answer PPIs submitted after the PPI due date to the best of its abilities.

For building AS424 Is the government's intention to keep the existing bathroom CMU partitions and update the fixtures within the existing floor plan, or demolish and reconfigure CMU walls with new layout to meet accessibility requirements of UFC 1- 200-01?

The Contractor shall provide a new layout to meet accessibility requirements. If required to meet ADA, demolish CMU partition.

The mezzanine in Building AS424 is constructed of steel posts and steel bar joists. Please confirm that this structure is to remain in place, and only the infilled stud walls are to be removed/replaced

Confirmed. The mezzanine structure is to remain in place, and metal studs with high impact moisture resistant GWB is to be added to the mezzanine storage.

3905 & 4108 - Are the new hangar doors required to be insulated? Is there a preference on insulated metal panel cladding or batt insulation if required?

Yes; follow UFC 4-211-01 guidance section 3-10.2. The Contractor shall provide insulation values equal to the minimum values required for the exterior walls of the Aircraft Maintenance Bay. The Contractor shall also provide waterproof weather stripping at all door system joints.

Insulated metal panel is preferred.

3905 & 4108 - Do to the hangar doors require metal wall cladding on the interior side of the doors?

Yes; follow UFC 4-211-01 guidance section 3-13.2. The Contractor shall provide a moisture-resistant interior face on the hangar door such as enameled metal panels up to 10 ft.

(3.0 m) above finished floor elevation.

Please confirm that the Government's intent is to replace the hangar doors with the same width as existing.

Confirmed. It is the Government's intent is to replace the hangar doors with the same width as existing.

3905 & 4108 - Is tow connection for manual operation of doors adequate or must each door be equipped with hand crank manual option?

Tow connection to allow the doors to be moved by aircraft tug in case of power failure is adequate.

Please confirm that per the PPI response in Amendment 4, the scope of the bridge crane upgrades is to replace the entire system from the rails down, to include the girder and trolley/ hoist

Confirmed. The scope of the bridge crane upgrades is to replace the entire system from the rails down, to include the girder and trolley/ hoist.

Two PPI responses in Amendment 4 address the existing crane capacity in Building 4108. One PPI response indicates the crane in 4108 is 2 ton while the other says 3 ton. Please confirm the capacity of the existing bridge crane to be upgraded in 4108.

The 2 ton crane hoist for 4108 is the correct value; 3 ton is an error.

Please provide owners/operating manual for existing bridge cranes in 3905 & 4108

No operations manual available; see excel sheet for manufacturer/serial number.

Please provide shop drawings and/or as-builts of existing crane system in hangars 3905 & 4108

See new attachments in Structural & Crane As-Builts.

Room data sheets call out rooms by name, RFP architectural drawings do not name rooms. Please provide room names to correlate to the appropriate room data sheets

See updated Part 6 drawings provided.

Finish schedule is organized by room type, however room types are not marked on RFP architectural drawings.

Please provide room type tags on the floor plans so that finishes can be quantified.

See updated Part 6 drawings provided.

Room data sheet for typical break room

- LVT, under Other/Special Requirements states, "provide space for base cabinet & countertop..." Please clarify if we are required to provide the cabinet or only a space for a cabinet.

The Contractor shall provide the space only for base cabinet and countertop, full size refrigerator, microwave, coffee maker, sink, and two (2) vending machines.

2 Part 3 1-A-8-d Part 3 paragraph 1-A-8-d states that "New floor plans must meet accessibility requirements per UFC 1- 200-01 to the maximum extent possible without major changes to the existing building." Please confirm "no major changes to existing building" means we are not demolishing CMU walls or partitions for new bathroom layouts in BLDG 424 and are to use the layout provided in the architectural RFP drawings.

The Contractor shall provide a new layout to meet accessibility requirements. If required to meet ADA, demolish CMU partition.

When a conflict occurs between the various Chapters of RFP Part 3, i.e. 1.

Project Description, 2. Project Objectives, 3. Site Analysis, 4.

Building Requirements, 5. Room Requirements, and 6. Engineering System Requirements, please identify the order of precedence which should be followed.

The following reflects the order of highest to lowest precedence: RFP Parts 3, 6, 2, 5, 4. Parts 4 or 5 are more general in nature and only apply to the extent that the product(s) identified are applicable to the project.

Please confirm that Part 3 Statement of Work / Project Program identifies project scope in Chapters 1, 2, 3 and 4 which will supersede any information found in Part 4 or 5, which are more general in nature and only apply to the extent that the product(s) identified are applicable to the project

Confirmed. This statement is correct.

Please clarify which takes precedence for any work shown in Part 6 but not identified in Part 3

RFP Part 3 shall take precedence.

Please define the intent of the Ktr QC- DOR personnel as it relates to the Engineering and Construction Bulletin included in Part 2. Is it anticipated that the Contractor's QC staff would fulfill these roles on behalf of the Ktr QC- DOR, or must a representative from the DOR fulfill these roles?

The Contractor QC staff may fulfill the role.

01 45 00.05 20 Para 1.5.5.4

Referenced specification notes that the Electrical and Telecommunications Systems QC Specialist is required onsite full time during installation testing. Please confirm that their presence is only required for testing and not installation.

The Electrical and Telecommunications Systems QC Specialist is only required for testing.

Based on the information provided in Part 6 of the RFP, it is our understanding that the contractor is not required to verify the preliminary system and equipment selections during the solicitation stage and these selections will form the basis of our pricing. It is understood that after award, the Contractor/DOR shall confirm suitability and sizing of the equipment during design development.

Please confirm

Confirmed. This statement is correct.

01 50 00.05 20 Para 1.5

Referenced specification states that reasonable amounts of utilities will be made available to the contractor at prevailing Government rates. Please provide the prevailing Government rates and/or consider providing available utility usage at no cost to the contractor.

There is no cost to the Contractor for utility usage.

Government Response from Amendment 4 says to refer to "Updated RFP Part 3" for exterior window requirements. Please provide updated Part 3

There are no exterior windows required to be replaced for AS424.

All Buildings: The demo plans in the architectural drawings do not show any demolition, please show extent of demolition for all spaces being demolished on the demolition plans to reflect RFP Part 3 scope of work.

See updated Part 6 drawings provided.

Due to the numerous PPIs regarding the extent of demolition shown on the RFP architectural drawings, and the conflicts with the mechanical drawings and RFP Part 3, please provide an updated set of the architectural plans to reconcile the discrepancies.

See updated Part 6 drawings provided.

A PPI Response in Amendment 4 states that Part 6 Attachment I2 is forthcoming, however this has not yet been received. Please provide the referenced as-built document.

Part 6 Attachment I2 is provided on

CD.

Several PPI Responses in Amendment 4 state that an updated Part 3 is forthcoming, however this has not yet been received. Please provide the referenced as-built document.

Updated Part 3 is provided on CD.

Please provide any structural calculations for the buildings that are available from the original construction design or any subsequent renovations

See updated Part 6 Attachment Structural & Crane As-Builts for all available structural drawings & calculations.

N/A N/A Site Walk & Previous PPI

Response (Amendment

0004, page 27)

In a previous NAVFAC PPI response, NAVFAC confirmed that the existing hanger door bottom support rails were NOT to be replaced. During the site walk significant corrosion was observed to AS4108 bottom rails. The existing detailing of the hanger door bottom rails is different for AS4108 versus AS3905. AS3905 has an intermittent drainage path for rain water to flow to a floor drain. The night before the site walk it rained.

The rails for Building AS4108 contained water while those at Building AS3905 did not.

The corrosion observed on the rails at Building AS4108 maybe a concern for warranty issues for the new Hanger Doors. Please consider evaluating the hanger door bottom rails and consider remedying the drainage problems as well as replacing damaged rails which could cause issues to the new hanger doors.

The Contractor shall replace door rails. Repairing drainage will be added to the SOW.

2 Part 3 1.A.3 & 1.A.4 Buildings AS4108 & AS3905 require 3 phases each for construction so that activities in the 2 phases not under construction can continue. What is the expectation of NAVFAC for the contractor to install a temporary partition between a phase under construction and a phase that is not?

Plastic sheeting, plywood over studs, gypsum wall board over studs, temporary fencing, or some combination?

The Contractor shall provide temporary plastic construction barrier to contain dust and debris. The Contractor shall also provide temporary fencing separating construction area from non-construction area.

N/A N/A Site Walk & Previous PPI

Response (Amendment 0004, page 6)

In a previous NAVFAC PPI response, NAVFAC confirmed that the walls are to be demolished and renovated but that there would be no changes to the wall locations for Building AS4108. During the site walk it was observed that the existing columns in the corridor on the second floor reduce the means of egress to approximately 40" at the larger columns and 42” at the smaller columns. We understand the minimum egress width to be 44".

The Life Safety Code does not address intermittent obstructions such as the columns in specific. It does have allowances for obstructions that are permitted at and below handrail height but not elements above handrail height.

Section 1003.3.3 of IBC allows up to 4” reduction on either side for horizontal projections between 27 and 80 inches (i.e. above handrail height).

Use of section 1003.3.3 would permit the intermittent reduction in width from the required 44” to a minimum of 40” for distances “less than 24-inches in width that are separated by at least 48-inches”.

Will we be able to use the allowances of the IBC regarding this issue or will contractors be required to provide the minimum egress widths per IBC?

Please advise.

Since second floor areas are not utilized for public functions and predominately serve military populations, the Contractor is only required to conform to the requirements of the Architectural Barriers Act of 1968 (ABA). The ABA allows the egress path to be reduced to 32 at obstructions on the second floor. Since the hangar bay first floor areas are utilized for public functions, the hangar floor and access paths to restrooms and exits should comply with both ABA and ADA.

72 Part 3 G102002 Section G102002 is regarding Aboveground Site Demolition and indicates that site elements that conflict with the ADA requirements such as ramps shall be replaced. Does this requirement apply to interiors also?

Specific example is Building AS4108 has several first floor interior doors between the hanger and the administrative spaces which have approximately 6" steps or ramps that are NOT ADA compliant. Are ADA ramps required interior to Buildings AS3905, AS4108 or AS424 to comply with ADA requirements?

Yes; the Contractor shall provide interior ramps for ADA in AS3905, AS4108, AS424.

85 Part 3 SOW G401007 Are manholes required only per UFC - 3-550-01 to accommodate long cable lenghts and pulling tensions?

Pad mounted junctions are required instead of manholes.

Part 6 Appendix I3 has asbuilts of the renovations in 1987 to the hangar AS4108, but does not include any information on the original building construction. Appendix I4 has an earlier renovation from 1981 where the hangar was expanded, but no information on the hangar structural system. Could you please provide these drawings/shop drawings from prior to 1981 for AS4108? Without this information extensive field documentation will be required to determine the existing structure which will be used to determine if the proposed 5 ton cranes and mechanical duct work can be supported.

See AS4108 original structural drawings in updated Part 6.

70 Part 3 F2010 1.1 There is no building demolition or foundation demolition of a whole building to 3' below grade. Does this section apply to this project scope of work?

This section does not apply to this scope of work and will be removed.

74 Part 3 G102002 If demolition is required for ADA access reasons, can you clarify the ADA building access requirements for each of the three buildings? Are ramps required at each exterior door entry to the building on the office/administration side?

The Contractor shall provide ramps for the steps and provide sufficient exit width to support the population.

Warehouses and second floor of the hangars are only used for military populations, so only the ABA applies.

75 Part 3 G102003 This section has a requirement for replacing all utilities within 10' of building. In section D301002, the gas system is to start work at the load side of the utility meter which is in conflict.

Please clarify if all utilities (Comm, electric, steam, gas, water, sewer) all need to be replaced within 10' of the building.

Confirmed; the Contractor shall replace gas system only within 10' of building.

76 Part 3 G1040 1.1 What are the requirements for any soils removed in foundation cuts for the utilities below? Are we required to import replacement backfill materials or can we place the original excavated material back?

Soil contamination is unknown. Any construction activities that require digging into the soil will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management for soils in accordance with the most current Waste Management Plan. Assume contaminated soils will need to be disposed of off-base at a permitted Subtitle D landfill as non-hazardous waste. All waste profiles and manifests will need to be approved and signed by base Environmental Management Division personnel.

78 Part 3 G201006 Is it correct to assume that because we are not working on any roads, there is no requirement to provide an bituminous overlay of any roads?

Bituminous overlay is not required.

79 Part 3 G202006 Is the parking lot bituminous overlay required for the temporary trailer areas for each area or does this section not apply to the project?

Bituminous overlay is not required.

79 Part 3 G2030 Is the pedestrian paving only required for any ADA correction issues or pedestrian paving cuts for utility services? Is it the intention to change the pedestrian circulation around each building and add new sidewalks/demolish old ones?

Yes; pedestrian paving only required for any ADA correction issues or pedestrian paving cuts for utility services.

80 Part 3 G2050 This section has a one year establishment and maintenance period that requires "routine lawn mowing, edging, pruning, pest inspection/treatment, re-mulching of mulch products, watering, weeding, fertilizing, and restaking, throughout the guarantee period." This does not appear to be in the governments best interest for such a small landscape area and the issue with keeping contractors on site for an extra year. Is this establishment and maintained period required?

This is not required.

82 Part 3 G303007 Why are LID features mentioned in this RFP(bioretention, grassed swales, bioretention swales, infiltration trenches, permeable pavement or pavers, and tree box filters), if we are not expanding the impervious cover of the project area with this construction?

Is this required for this project?

This is not required.

86 Part 3 G403001 Please confirm that we are to install just the conduits with innerduct and pull string for the telecom on the exterior of the buildings. Does the government intend to pull any conductors/fiber optic at a later date?

This requirement seems odd compared to the interior requirements in section D503001.

The Contractor shall provide one conduit with 3 cell fabric innerduct and copper cabling telecom. The Contractor shall also provide second spare conduit with innerduct and pull string for future upgrades.

17 Part 3 SOW C.22 Are compressed air drops required to be fixed or from hose reels?

Compressed air drops shall be fixed.

52 Part 3 SOW D30 Are DOAS systems with ventialtion air ducted directly to each space required in accordence with UFC 3-410-01 Section 3-2 or can the DOAS units be ducted to AHUs/FCUs?

Air from DOAS systems shall be ducted to each room. It is not to be ducted into AHUs.

52 Part 3 SOW D30 Is a LCCA required for the seleced equipment in accordence with UFC 3- 410-01 Section 3-1? If so, what is the alternate system that should be used to compare the designated units in the SOW against?

LCCA is not required.

52 Part 3 SOW D30 If the designated systems in the SOW are not LCC acceptable in accordence with UFC 3-410-01 Section 3-1, what systems should be considered?

LCCA is not required.

53 Part 3 SOW D30 Can the Gobernment provide examples for the "gas-packs with hot-gas reheat for dehumidification"?

Trane YHC (Precedent Gas/Electric Packaged Rooftop) is one example.

Other manufacturers can provide similar equipment with hot-gas reheat.

1 Part 6 Attch 28 Can a control diagram for the DOAS units be provided?

Control Diagram was provided on sheet M-607.

52 Part 3 SOW D30 Is energy modeling reuqired to show compliance with UFC 1-200-02, High Performance and Sustainable Building Requirements?

Energy modeling is not required.

52 Part 3 SOW D30 Is energy a 30% energy consumption reduction in compliance with UFC 1- 200-02, High Performance and Sustainable Building Requirements since the HVAC systems are bing dictated by the SOW?

Yes; a 30% energy consumption reduction is acceptable.

2 Part 3 1.A.2, 1.A.3 & 1.A.4

Per the description, the roof is to be replaced under separate contract. Is that prior to, concurrent with, or after the scope listed within this RFP is completed? Later in the RFP it is indicated that this work is complete for each building post hurricane.

The roof will be completed prior to the scope listed within this RFP.

2 Part 3 1.A.8.d Please further define "maximum extent possible without major changes to the existing building"

The Contractor shall provide ramps for the steps and provide sufficient exit width to support the population without rearranging building structure.

3 Part 3 2.D.3.b / 2.D.4.b / 2.D.5.b

As the trailers must be installed and functional prior to beginning work, each project would require an extra phase of construction, with the first to include the temporary trailers.

Additional NTP or schedule may be needed for this phase.

Early design submittal for trailer is permitted for this RFP.

B. This amendment incorporates the following updated attachments:

1. 19-0118 - Part 3

2. 19-0118 Part 6 TOC

3. 21DEC2019 Part 6 - ATTACHMENT A1 - 19-0118 Finish Schedule and

Architectural Plans

4. Part 6 - ATTACHMENT I4- Structural & Crane As-Builts, which include:

i. AS3905 Structural addition

ii. AS4108 Crane drawings

iii. AS4108 original structural drawings

iv. AS4108 Structural drawings

v. Current AS3905 & AS4108 Crane Info

vi. Typical Hangar Sliding Door Drawings AS3905 & AS4108

C. All other contract terms and conditions remain unchanged.