19-0118 Part 6 TOC.pdf

PDF 126 KB Posted

Attached to
DB MCASNR Facility Repairs, Phase II
Solicitation number
N4008519R8086
Issued by

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovation to Buildings AS424, AS3905, AS4108 Project #19-0118 MCAS New River, Jacksonville, NC

PART 6 - Page 1

Part 6 Attachments

A. ARCHITECTURAL SHEETS, HVAC ZONING PLANS, SCHEDULES, DIAGRAMS,

CONTROLS, AND SEQUENCING:

1. 19-0118 Finish Schedule and Architectural Renovations

2. AS4108 North Module (FRCE) Air, Power, Ground Tree Design

3. E-101 - Bldg AS3905 Partial Electrical Layout

4. E-102 - Bldg AS3905 Partial Electrical Layout

5. E-103 - Bldg AS3905 Partial Electrical Layout

6. E-104 - Bldg AS4108 Partial Electrical Layout

7. E-105 - Bldg AS4108 Partial Electrical Layout

8. E-106 - Bldg AS4108 Partial Electrical Layout

9. M-101 - Bldg AS424 First Floor Zoning Plan

10. M-102 - Bldg AS424 First Floor Zoning Plan

11. M-103 - Bldg AS3905 HVAC Partial Zoning Plan

12. M-104 - Bldg AS3905 HVAC Partial Zoning Plan

13. M-105 - Bldg AS3905 HVAC Partial Zoning Plan

14. M-106 - Bldg AS4108 HVAC Partial Zoning Plan

15. M-107 - Bldg AS4108 HVAC Partial Zoning Plan

16. M-108 - Bldg AS4108 HVAC Partial Zoning Plan

17. M-109 - Bldg AS4108 HVAC Partial Zoning Plan

18. M-601 - Bldg AS424 Mechanical Schedules

19. M-602 - Bldg AS3905 Mechanical Schedules

20. M-603 - Bldg AS3905 Mechanical Schedules

21. M-604 - Bldg AS4108 Mechanical Schedules

22. M-605 - Bldg AS4108 Mechanical Schedules

23. M-606 – Controls

24. M-607 – Controls

25. M-608 – Controls

26. M-609 – Controls

27. M-610 – Controls

PART 6 - Page 2

28. M-611 – Controls

29. TS-101- Electrical Partial Site Plan

B. Base Exterior Architectural Plan (BEAP)

C. 90-1218-1.1-x3301 flame detector

D. SITE WORK:

1. Temporary Trailer Locations - AS424, AS3905, AS4108

2. AS424 OSP Connections

3. AS3905 OSP Connections

4. AS4108 OSP Connections

E. MCBCL REQUIRMENTS:

1. ADA Checklist For Existing Buildings

2. MCBCL Signs Standards-Graphics 19feb2019

3. MCO 5530.14a

4. MCO 5110.6c

5. MCBCL Mech Design Guidance 7.17

6. UFC 4-211-01 - Aircraft Maintenance Hangars

7. UFC 4-440-01 - Warehouses and Storage Facilities

F. Example Mechanical Screen Wall

G. FAP DATA:

1. FAP Data – AS424

2. FAP Data - AS3905

3. FAP Data - AS4108

H. FURNITURE- INVENTORY INSPECTION LOG:

1. Furniture Inventory Inspection Log Bldg AS424

2. Furniture Inventory Inspection Log Bldg AS3905

3. Furniture Inventory Inspection Log Bldg AS4108

I. AS-BUILTS FROM PREVIOUS RENOVATIONS:

1. AS424 As-builts

2. AS3905 As-builts

3. AS4108 As-builts

PART 6 - Page 3

4. Structural & Crane As-Builts

J. ASBESTOS AND LEAD:

1. Bldg AS3905 - Asbestos and Lead-Based Paint Assessment

2. Bldg AS4108 - Asbestos and Lead-Based Paint Assessment

3. Bldg AS424 - Asbestos and Lead-Based Paint Assessment

File details come from the government source that posted it. Updated .