Amend_0007_198057.pdf
PDF 186 KB Posted
- Attached to
- Mechanical, Electrical, & Plumbing MACC Federal contract opportunity
- Solicitation number
- N4008519R8057
About this file
This document is an amendment to a solicitation for a Mechanical, Electrical, and Plumbing Multiple Award Construction Contract (MACC) issued by the Department of the Navy Naval Facilities Engineering Command. The amendment provides responses to contractor questions to clarify the scope of work. It specifies that all work associated with Air Handler 32 should be deleted, and identifies which rooms are associated with the referenced Pharmacy. A boiler platform layout is also attached to specify the configuration. The response deadline remains October 17, 2019, and contractors must acknowledge any amendments when submitting proposals. All other terms and conditions of the original solicitation remain unchanged.
Amendment 0007 - Answer Requests for Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0008 198057.pdf | ||
| Boiler_Platform.pdf | ||
| 02_82_00_ASBESTOS_REMEDIATION.pdf | ||
| NH100_Asbestos_Report.pdf | ||
| Amend_0006_198057.pdf | ||
| 198057_Amend_0005.pdf | ||
| Construction_Exp_Project_Data_Sheet_198057.docx | DOCX document | |
| 198057_Amend_0004.pdf | ||
| 198057_Amend_0003.pdf | ||
| Amend_0002_198057.pdf | ||
| 198057_Amend_0001.pdf | ||
| Attach_2_DWGS_1_of_3_198057.pdf | ||
| ATTACH_2(b)_DWGS_1_of_3_198057.pdf | ||
| ATTACH_2(a)_DWGS_1_of_3_198057.pdf | ||
| ATTACHMENT_6_PPQ.docx | DOCX document | |
| ATTACH_1_Spec_198057.pdf | ||
| ATTACHMENT_5_Construction_Exp_Project_Data_Sheet.docx | DOCX document | |
| ATTACH_4_DWGS_3_of_3_198057.pdf | ||
| ATTACH_3_DWGS_2_of_3_198057.pdf | ||
| RFP_N4008519R8057.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACC240M
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-19-R-8057, Mechanical, Electrical and Plumbing MACC Amendment 0007, Answ er Requests for Information
The time and date for receipt of proposals remains 1400, 17 October 2019.
This amendment should be acknow ledged w hen your proposal is submitted. Failure to acknow ledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R8057
X 9B. DATED (SEE ITEM 11)
21-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Oct-2019
CODE
NAVFAC MID ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R8057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMEND 0007
1. QUESTION: Drawing M‐602 calls for “platforms that connect boilers together giving 2 means of egress from platform.” However, there is no layout for the platforms provided. Can you provide the boiler platform layouts, please? Is it possible that we can field erect platforms after boiler installation?
ANSWER: Please see attached boiler platform layout. Platform may be field erected after installation. Platform must be in place before boiler startup.
2. QUESTION: RFI item #58 in Amendment #6 can be read two different ways and is very vague.
Does item #58 state: "Delete all work associated with the Pharmacy which is served by Air Handling Unit #32" or "Delete all work associated with the Pharmacy and everything associated with Air Handling Unit #32." The drawings do not identify which rooms are associated with the Pharmacy. Please identify which rooms are "associated" with the Pharmacy, or are we to simply to delete all work associated with Air Handling Unit #32?
ANSWER: Delete all work associated with Air Handler 32.
3. All other terms and conditions remain unchanged.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .