RFP_N4008519R8057.pdf

PDF 566 KB Posted

Attached to
Mechanical, Electrical, & Plumbing MACC Federal contract opportunity
Solicitation number
N4008519R8057
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This request for proposal (RFP) solicits proposals for multiple award construction contracts (MACC) for mechanical, electrical, and plumbing projects at Marine Corps installations in North Carolina. The Naval Facilities Engineering Command will award up to six firm fixed-price IDIQ contracts for a base year and four one-year options, with a total estimated value of $240 million over five years.

The initial task order is for replacing boilers and installing HVAC reheat coils at the Naval Medical Center Camp Lejeune, with subsequent task orders for projects valued between $150,000 and $10 million competing on lowest price among awardees. Offerors must submit separate technical and price proposals by September 20, 2019. Evaluation will consider corporate experience, management approach, safety, and past performance. The solicitation sets forth requirements for each evaluation factor and requests specific documents and information with the proposal.

RFP

View the file

Other files for this federal contract opportunity

Other files attached to Mechanical, Electrical, & Plumbing MACC, newest first.
File Type Posted
Amend 0008 198057.pdf PDF
Amend_0007_198057.pdf PDF
Boiler_Platform.pdf PDF
02_82_00_ASBESTOS_REMEDIATION.pdf PDF
NH100_Asbestos_Report.pdf PDF
Amend_0006_198057.pdf PDF
Construction_Exp_Project_Data_Sheet_198057.docx DOCX document
198057_Amend_0005.pdf PDF
198057_Amend_0004.pdf PDF
198057_Amend_0003.pdf PDF
Amend_0002_198057.pdf PDF
198057_Amend_0001.pdf PDF
Attach_2_DWGS_1_of_3_198057.pdf PDF
ATTACH_2(a)_DWGS_1_of_3_198057.pdf PDF
ATTACH_2(b)_DWGS_1_of_3_198057.pdf PDF
ATTACHMENT_6_PPQ.docx DOCX document
ATTACH_3_DWGS_2_of_3_198057.pdf PDF
ATTACH_1_Spec_198057.pdf PDF
ATTACHMENT_5_Construction_Exp_Project_Data_Sheet.docx DOCX document
ATTACH_4_DWGS_3_of_3_198057.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACC240M

INDEFINITE QUANTITY/INDEFINITE DELIVERY(IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, RENOVATIONS, ALTERATIONS, AND REPAIRS FOR MECHANICAL, ELECTRICAL, AND PLUMBING PROJECTS PRIMARILY AT MARINE CORPS

INSTALLATIONS IN NORTH CAROLINA

Solicitation No.: N40085-19-R-8057 Dated 21 Aug 2019 See Section 00 10 00 - Instruction to Offerors

The NAICS Code is 238220 and the size standard is $15,000,000.

The solicitation is issued as a total small business set-aside.

Facsimile transmission of offers, acknow ledgement of amendments, or modifications to offerors is not authorized.

NOTE: Offerors must execute blocks 14 through 20c. See Instructions to Offerors.

LAUREN F. LOCONTO 910-451-2582 EXT 5246

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

21-Aug-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________20 Sep 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC MID ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(910) 451-5629FAX:TEL: (910) 451-2582 TEL: FAX:

N4008519R8057 68

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008519R8057

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 240,000,000 Each

MEP MACC

FFP

INDEFINITE QUANTITY/INDEFINITE DELIVERY (IDIQ) MULTIPLE

AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW

CONSTRUCTION, RENOVATIONS, ALTERATIONS, AND REPAIRS FOR

MECHANICAL, ELECTRICAL, AND PLUMBING PROJECTS PRIMARILY

AT MARINE CORPS INSTALLATIONS IN NORTH CAROLINA

FOB: Destination

PURCHASE REQUEST NUMBER: MACC240M

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 540 dys. ADC 240,000,000 N/A

FOB: Destination

Section 00 70 00 - Conditions of the Contract

WAGE DETERMINATION

General Decision Number: NC190038 01/04/2019 NC38

Superseded General Decision Number: NC20180038

State: North Carolina

Construction Type: Building

County: Onslow County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019

* IRON0848-005 02/01/2018

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 25.00 13.50

PLUM0421-003 07/01/2017

Rates Fringes

PIPEFITTER.......................$ 28.65 10.45

SUNC2011-019 08/24/2011

Rates Fringes

BRICKLAYER.......................$ 19.00 0.00

CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00

CARPENTER (Form Work Only).......$ 13.38 1.80

CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 16.39 4.26

CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00

ELECTRICIAN......................$ 20.64 6.68

HVAC MECHANIC (HVAC Duct Installation Only)...............$ 17.37 1.82

LABORER: Common or General......$ 11.13 0.32

LABORER: Landscape & Irrigation.......................$ 9.13 0.28

LABORER: Pipelayer..............$ 13.35 2.80

LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.47 2.41

OPERATOR: Bulldozer.............$ 16.00 1.87

OPERATOR: Crane.................$ 19.77 4.48

OPERATOR: Forklift..............$ 13.86 0.00

OPERATOR: Grader/Blade..........$ 15.72 1.49

OPERATOR: Loader................$ 16.17 0.25

PAINTER: Brush, Roller and Spray............................$ 12.35 0.00

PLUMBER..........................$ 18.48 3.93

ROOFER...........................$ 11.75 1.06

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40

TRUCK DRIVER.....................$ 13.38 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.3 GENERAL OVERVIEW OF CONTRACT

2. GENERAL OVERVIEW OF THE SEED PROJECT

3. BASIS FOR AWARD

4. EVALUATION FACTORS FOR AWARD

5. PROPOSAL REQUIREMENTS

5.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

5.3 FEDERAL BUSINIESS OPPORTUNITIES (FBO)

5.4 INCORPORATION OF TECHNICAL PROPOSALS

6. ATTACHMENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.1.1 This solicitation is being issued as a total small business set-aside. The NAICS code for this procurement is 238220 and the size standard is $15M.

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.2.1 This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by Part 15 of the Federal Acquisition Regulation (FAR). This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of the offeror’s proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. This acquisition will be solicited as a competitively negotiated procurement as a total small business set-aside.

1.2.2 The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contracts to other than the offeror submitting the lowest total price; to award to other than the offeror submitting the highest technically rated proposal; and to award to the offeror submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. OFFERORS ARE

ADVISED THAT AWARD MAY BE MADE WITHOUT DISCUSSIONS OR ANY

CONTACT CONCERNING THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

1.3 GENERAL OVERVIEW OF CONTRACT

1.3.1 This acquisition will result in the award of up to six (6) Design-Bid-Build, Indefinite- Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contracts (MACC) for the Marine Corps Installation East Area of Responsibility for a range of mechanical, electrical and plumbing projects. The Government intends to award no more than six (6) contracts resulting from this solicitation to the responsible offerors whose proposals represent the best value, after evaluation, in accordance with the factors in the solicitation.

1.3.2 The resulting contracts will provide for new construction, renovation, alteration, and repair for mechanical, electrical and plumbing projects primarily located at Marine Corps Installations East (MCI East). The proposed seed project for this solicitation is titled Replace Boilers and Install HVAC Reheat Coils, NH100, Naval Medical Center Camp Lejeune. Task orders under the MACC will be design-bid-build. Work will be primarily performed at Marine Corps Base Camp Lejeune (including the New River Air Station and other related facilities) and Marine Corps Air Station Cherry Point. However, it may also be performed at other military and government installations/sites under the Marine Corps Installation East Area of Responsibility.

1.3.3 The completion date for the basic contract is one (1) year from the date of contract award with four (4) one-year option periods. The total five-year (base and four, one-year options) estimated construction cost for all contracts is not to exceed $240,000,000.00 for the life of the contract. Task orders will be firm fixed price and will be predominately in dollar value from $150,000 to $10,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000.00 to each successful offeror over the full term of the contract, including option years.

1.3.4 After award of the initial contracts and seed project, the successful IDIQ contractors will compete for task orders based on lowest price. Only the successful IDIQ contractors will compete for task orders.

1.3.5 The intent of this contract is that all IDIQ Contractors participate in pre-proposal conferences, site-visits, and submit proposals on each project. Contract awardees will be expected to submit a proposal for all Request for Proposals (RFP). However, in the event that a MACC awardee is unable to submit a proposal on a particular RFP the Contractor is required to notify the Contracting Officer, at the time proposals are due, that they will not be submitting a proposal. A MACC awardee can only elect to withdraw from submitting a proposal on three (3) task order RFPs during the course of each year of the contract. Additional withdrawal requests, in excess of three per year, may result in the Government choosing not to exercise remaining options.

2. GENERAL OVERVIEW OF THE SEED PROJECT

2.1 The initial project to be awarded as the first task order, along with the basic contract, will be Replace Boilers and Install HVAC Reheat Coils, NH100, Naval Medical Center Camp Lejeune.

The work includes replacing two (2) existing 350hp boilers and associated deaerator, replacing three (3) steam to hot water heat exchangers and associated pumps, air seperators and expansion tanks, and replacing one hundred eighty three (183) cooling only VAV boxes with new VAV boxes with hot water reheat coils and adding new steam to hot water heat exchange and pumping skid to provide hot water for replaced VAV boxes.

2.2 Pursuant to FAR 52.232-18, Availability of Funds, the Government’s obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.

3. BASIS FOR AWARD

3.1 The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, price and other factors considered.

3.2 The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3.3 The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

3.4 Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.

The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

4. EVALUATION FACTORS FOR AWARD

4.1 The solicitation requires the evaluation of price and the following non-cost/price factors:

Factor 1 – Corporate Experience Factor 2 – Management Approach Factor 3 – Safety Factor 4 – Past Performance

4.2 The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

4.3 The relative order of importance of the non-price evaluation factors is that the technical factors (Factors 1 through 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment (Factor 4).

When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are of approximately equal importance to price.

4.4 The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

4.5 Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements:

Provide one (1) marked original, one (1) marked copy and one (1) electronic copy (CD format) of the solicitation submittal requirements identified below. The electronic copy does not have to include the price for the seed project; however, the price for the seed project must be included in the original and hard copies. In case of variation, the original hard copy proposal takes precedence over electronic or copies.

(i) Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, Offeror shall provide its DUNS Number, CAGE code, and Federal Tax ID number with its proposal.

(ii) Completed Proposed Price for the Seed Project.

(iii) Bid bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3,000,000, whichever amount is less. The bid bond shall be in the name of the offeror identified on the SF1442. In addition, the offeror shall provide a letter from its bonding company confirming that it has a single award bonding capacity of at least $30,000,000 and the ability to bond multiple projects.

(iv) SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the representation or certification in your price proposal.

(v) FAPIIS Certification. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters.

(vi) VETS-4212 registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm, if the Offeror is required to submit. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS- 4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate Tab, the offeror shall provide the following information in the price proposal package:

1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

3. Description of offeror’s facilities and equipment.

4. Other offeror’s work presently under contract.

Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

(2) Basis of Evaluation: The Government will evaluate price based on the total price for the seed project. Total price consists of the basic requirements and all option items, if applicable.

The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

(b) Non-cost/price Factors:

The offeror shall submit one original, marked “Original”, four copies marked “copy”, each in a separate three-ring binder (1.5 inch. maximum), and one electronic copy on CD with the following characteristics:

Text pages 8 ½ x 11 format Drawings 11x17 inches and folded down to 8 ½ x 11 inches 12-point font, Times New Roman One complete electronic copy of the technical proposal factors as a single .pdf searchable file on a CD-ROM (include with the “Original” technical submission). If there are any conflicts between hard copies and/or electronic copies, the “Original” hard copy will govern.

Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Title, phone number, and email address.

Factor 1 – Corporate Experience:

(i) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

Submit a minimum of three (3) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this MACC. For purposes of this evaluation, a relevant project is further defined as:

Size: A final construction cost of $1,000,000 or greater. At least one (1) project must have a final construction cost of $5,000,000 or greater.

Scope/Complexity: Projects performing a range of mechanical, electrical or plumbing projects.

Additionally, submitted relevant projects shall demonstrate the following:

a) Offerors shall have acted as the prime contractor on submitted projects. Offeror’s experience performing as subcontractor will not be considered, nor will experience of companies proposed to work as subcontractors on the awarded contract.

b) Relevant projects must demonstrate experience with mechanical, electrical, and plumbing. All three do not need to be demonstrated on the same relevant project. However, collectively, the relevant projects shall demonstrate experience with mechanical, electrical, and plumbing.

Projects submitted for the Offeror must have been completed within five (5) years of the date of issuance of this RFP.

A project is defined as a complete project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Attachment 5) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods, self-performance).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the JV members. Offerors who fail to submit experience for all JV members may be rated lower. Offerors are still limited to a total of five (5) projects combined.

For a JV, the offeror shall submit the signed JV agreement. For 8(a) Mentor-Protégé Joint Ventures, the offeror shall submit the signed U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

Experience of proposed subcontractors will not be considered for corporate experience.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects. Any projects submitted in excess of the five (5) will not be considered.

Relevant projects that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.

Offerors who submit relevant projects that demonstrate experience self-performing relevant features of work may receive a higher rating than those who do not demonstrate self-performance.

Offerors whose relevant projects demonstrate a range/variety of mechanical, electrical, and plumbing projects may be considered more favorably.

Factor 2 – Management Approach:

Solicitation Submittal Requirements:

Offeror shall submit a detailed Management Approach describing how the offeror intends to successfully complete the work awarded under this MACC. The narrative plan, at a minimum, shall address the following:

Describe the company’s labor force, including skill levels; equipment (rented or owned);

Describe the types of work to be self-performed and the types of work to be subcontracted;

Provide a general summary of the proposed quality management system and the minimum quality controls to be used to ensure compliance during contract performance;

Provide historical information on the company’s primary area of trade expertise.

The management approach narrative shall be limited to two (2) double-sided pages (or four (4) single-sided pages). Pages beyond the limit will not be considered.

Basis of Evaluation:

The assessment of the Offeror’s management approach will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP and determine if the Offeror has the necessary technical capability to perform the subject requirements. This factor will be rated on an Acceptable or Unacceptable basis. Offerors that are rated Unacceptable will be found ineligible for award.

Factor 3 – Safety

(i) Solicitation Submittal Requirements: The Offeror shall submit the following information:

(For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)

(1) Experience Modification Rate (EMR): Include three previous complete calendar years’ worth of data (2016, 2017, and 2018). This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

Submit three previous complete calendar years’ worth of data (2016, 2017, and 2018). If an offeror cannot submit an OSHA DART rate for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data negatively must be addressed as part of this factor submission.

(3) OSHA Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ worth of data (2016, 2017, and 2018). If an offeror cannot submit an OSHA TRC rate for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA TRC rate data negatively must be addressed as part of this factor submission.

(4) Technical Approach for Safety: Provide a safety narrative that addresses the following:

Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.

Describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.

Describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.

Describe your methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.

The technical approach to safety narrative shall be limited to one double-sided page (or two single-sided pages).

(ii) Basis of Evaluation: The evaluation will collectively consider the following:

Experience Modification Rate (EMR) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) Rates Offeror Technical Approach to Safety Other sources of information available to the Government

(1) Experience Modification Rate (EMR): For the three previous complete calendar years (2016, 2017, and 2018) the offeror will submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART): For the three previous complete calendar years (2016, 2017, and 2018), the offeror will submit their OSHA DART, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART rates, affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.

(3) OSHA Total Recordable Case (TRC) Rates: For the three previous complete calendar years (2016, 2017, and 2018), the offeror will submit their OSHA TRC, as defined by the U.S.

Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA TRC rates, affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the OSHA TRC rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.

(4) Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels.

The Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

(5) Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.

Factor 4 - Past Performance:

(i) Solicitation Submittal Requirements: IF A COMPLETED CPARS EVALUATION IS

AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A

COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Corporate Experience. AN OFFEROR

SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Lauren Loconto, via email at lauren.loconto@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Performance award or additional information submitted will not be considered.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1, Corporate Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment 6.

(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and

- Recency of tasks performed that are identical to, similar to, or related to the task at hand

5. PROPOSAL REQUIREMENTS

5.1 PRE-PROPOSAL CONFERENCE AND SITE VIST

Information for the site visit pertaining to the seed project will be issued via Amendment once the final date/location has been determined.

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

In response to the request for proposal, the complete proposal shall include both the Price Proposal and the Non-Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for each factor as follows:

5.2.1 Price Proposal and Non-Price Factors Proposal – The Price Proposal and the Non-Price Factors Proposal shall be submitted in separate 3-ring binders. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor. Price and Non-Price Factors proposals must be submitted in sealed envelopes/boxes. Any pricing information included in the Non-Price Factors proposal will not be considered. Similarly, any Non-Price information included in the Price Proposal will not be considered. Proposal shall be labeled “PRICE PROPOSAL or NON-PRICE FACTORS PROPOSAL for RFP N40085-19-R-8057, MEP MACC, ATTN:

LAUREN LOCONTO; DO NOT OPEN IN MAIL ROOM”.

5.2.2 The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated herein for non-conformance may result in an unfavorable proposal evaluation.

5.2.3 All proposals shall be mailed or hand carried to the following address:

NAVFAC ROICC Camp Lejeune ATTN: Lauren Loconto 1005 Michael Road Camp Lejeune, NC 28547-2521

5.2.4 Hand Carried Proposals

Offerors who would like to hand deliver their proposal and who do not currently have a valid badge issued by the Department of Defense (DoD) to enter Marine Corps Base Camp Lejeune must do the following:

Submit the full name of the individual(s) requiring sponsorship as it appears on a valid driver’s license or state-issued identification card no later than three working days prior to the…