198057_Amend_0003.pdf
PDF 146 KB Posted
- Attached to
- Mechanical, Electrical, & Plumbing MACC Federal contract opportunity
- Solicitation number
- N4008519R8057
About this file
This document contains an amendment to a solicitation for a Mechanical, Electrical, and Plumbing Multiple Award Construction Contract (MACC) from the Department of the Navy Naval Facilities Engineering Command. The amendment provides answers to eight questions from potential offerors. It clarifies that pre-insulated single wall spiral ductwork is acceptable for new connections to existing systems. It confirms ball valves can be used in lieu of gate valves for specified water coil piping details. It attaches a pricing sheet for offerors to provide pricing for a seed project. It also provides information on the removal date for scaffolding in a boiler area and confirms telemetry is installed in all inpatient wards of the specified medical facility. All other terms and conditions of the original solicitation remain unchanged.
Amendment 0003 - Answer Requests for Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0008 198057.pdf | ||
| Boiler_Platform.pdf | ||
| Amend_0007_198057.pdf | ||
| 02_82_00_ASBESTOS_REMEDIATION.pdf | ||
| NH100_Asbestos_Report.pdf | ||
| Amend_0006_198057.pdf | ||
| 198057_Amend_0005.pdf | ||
| Construction_Exp_Project_Data_Sheet_198057.docx | DOCX document | |
| 198057_Amend_0004.pdf | ||
| Amend_0002_198057.pdf | ||
| 198057_Amend_0001.pdf | ||
| Attach_2_DWGS_1_of_3_198057.pdf | ||
| ATTACH_2(b)_DWGS_1_of_3_198057.pdf | ||
| ATTACH_2(a)_DWGS_1_of_3_198057.pdf | ||
| ATTACHMENT_6_PPQ.docx | DOCX document | |
| ATTACH_1_Spec_198057.pdf | ||
| ATTACHMENT_5_Construction_Exp_Project_Data_Sheet.docx | DOCX document | |
| ATTACH_4_DWGS_3_of_3_198057.pdf | ||
| ATTACH_3_DWGS_2_of_3_198057.pdf | ||
| RFP_N4008519R8057.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACC240M
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-19-R-8057, Mechanical, Electrical and Plumbing MACC Amendment 0003, Answ er Requests for Information
The time and date for receipt of proposals remains 1400, 10 October 2019.
This amendment should be acknow ledged w hen your proposal is submitted. Failure to acknow ledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R8057
X 9B. DATED (SEE ITEM 11)
21-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Sep-2019
CODE
NAVFAC MID ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R8057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMEND 0003
1. QUESTION: Spec section 23 00 00 – 2..10.1 (F) says, “supply air duct serving VAV/CAV systems shall be 1” minimum insulated double wall round or flat oval duct from the AHU’s to the boxes.” This type of ductwork is more commonly single wall spiral. If existing duct from the AHU to the VAV is single wall spiral, it will be difficult to splice in pre-insulated double wall spiral. Please confirm the government wants pre-insulated double wall spiral used to tie in to this existing system.
ANSWER: Pre-insulated double wall spiral ductwork is not required. Pre-insulated single wall spiral ductwork is to be utilized.
2. QUESTION: On drawing M-501 the water coil piping detail for 3-way and 2-way show both ball valves and gate valves being used. Spec Section 23 64 26 – 2.6.6 says ball valves may be provided in lieu of gate valves. Is it acceptable to use ball valves in lieu of gate valves for the water coil piping shown in details C2 and C4 on drawing M-501?
ANSWER: All valves other than the control valves on details C2/M-501 and C4/M-501 are shown as ball valves. In addition to that, the valve size chart shows valves under 3” to be ball valves and valves 3-6” to be butterfly valves. Therefore, ball valves are acceptable for sizes under 3”.
3. QUESTION: Per RFP Page 12; 4. Evaluation Factors for Award, Item 4.5 (a)(1)(ii), The offeror must provide the “completed proposed price for the seed project.” Is the Government going to provide a pricing template for the submission?
ANSWER: Use the attached pricing sheet for submission of the seed project price.
4. QUESTION: Per RFP Page 12; 4. Evaluation Factors for Award, Item 4.5 (a)(1) Page 13, Evaluation Factors for Award, Item 4.5 (b), Please confirm that the offeror should submit the following number of original binders, copy binders and CDs.
Price Factor: One (1) marked original, one (1) marked copy and one (1) electronic copy (CD format).
Non-Cost/Price Factor: One (1) original, marked “Original”, four (4) copies marked “copy”, each in a separate three-ring binder (1.5 inch. maximum), and one electronic copy on CD.
ANSWER: The information regarding submission of the Price and Non-Cost/Price Factor is correct as detailed in the Solicitation.
5. QUESTION: When will the scaffolding in the boiler area be removed?
ANSWER: The estimated date for removal is 1 October 2019.
6. QUESTION: Is there telemetry in the facility other than in the pre-op and PACU areas?
ANSWER: Telemetry is in all inpatient wards: Intensive Care Unit, Operating Rooms, radiology and Emergency Department.
7. QUESTION: The solicitation for the above referenced project details the number of projects and size range that we can submit for consideration in the Corporate Experience and Past Performance Factors. In selecting the projects, we are to use only projects where we were the prime contractor. Please clarify if Construction Manager at Risk projects qualify as prime experience. The CM@R was an agent of the owner and administered the daily construction activities but our contract was directly with the owner. Please advise.
ANSWER: Only projects where the Offeror is the Prime Contractor are acceptable for the Corporate Experience and Past Performance Evaluation factor.
8. All other terms and conditions remain unchanged.
SOLICITATION N40085-19-R-8057
PRICING SHEET
SEED PROJECT PRICE $________________________
(End of Summary of Changes)
File details come from the government source that posted it. Updated .