Attachment_F_Rev_2.doc
DOC document 91 KB Posted
- Attached to
- RM17-0145, CNIC Base Support Consolidation, Bldg. H1 at Portsmouth Naval Shipyard in Kittery, ME
- Solicitation number
- N4008518R8717
About this file
Attachment_F_Rev_2.doc
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_F-082718.doc | DOC document | |
| N4008518R8717_Amendment_0015.pdf | ||
| 01-00_41_00_BID_SCHEDULES-H1.pdf | ||
| Water_distribution_from_PNS_Base_Map.pdf | ||
| Amendment_0014_18R8717.pdf | ||
| Amendment_0013_18R8717.pdf | ||
| Amendment_0012_18R8717.pdf | ||
| Amendment_0011_18R8717.pdf | ||
| Amendment_0010_18R8717.pdf | ||
| Amendment_Attachments.pdf | ||
| Amendment_0009_18R8717.pdf | ||
| Amendment_0008_18R8717.pdf | ||
| 21603.22-AD100_-_updated.dwg | DWG drawing | |
| Amendment_0007_18R8717.pdf | ||
| 21603.22-AD100.dwg | DWG drawing | |
| Amendment_0006_18R8717.pdf | ||
| Binder1_Part2.pdf | ||
| Amendment_0005_18R8717.pdf | ||
| Binder1_Part1.pdf | ||
| Binder1_Part3.pdf | ||
| Site_Visit_18R8717_Sign_In.pdf | ||
| Amendment_0004_18R8717.pdf | ||
| Amendment_0003_18R8717.pdf | ||
| Amendment_0002_18R8717.pdf | ||
| Attachment_F_Rev.doc | DOC document | |
| Amendment_0001_18R8717.pdf | ||
| Updated_Solicitation_18R8717.pdf | ||
| Attachment_C.xls | XLS spreadsheet | |
| Attachment_B.pdf | ||
| Attachment_A.docx | DOCX document | |
| Solicitation_18R8717.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE PROPOSAL FORM – ATTACHMENT F
PART 1 GENERAL
1.1 CONTRACT LINE ITEM NUMBERS
1.1.1 General Notes
1. This contract will be solicited and awarded as one lump sum with Options as required for specifically selected work.
2. See specification section 01 11 00 SUMMARY OF WORK for detailed item descriptions.
CLIN 0001 - BASE PRICE: CLIN 0001 shall be the total amount for Items 000101 through 000104, complete in accordance with the drawings and specifications, including unit prices 0001a through 0001ii, but not including the work indicated or specified to be provided under any Options.
Item 000101 – Building H-1: Item 000101 shall be the entire work associated with the renovation of Building H-1, complete in accordance with the RFP requirements, but not including the work indicated or specified to be provided under any Option Item. Include general conditions, hazardous materials abatement, demolition, new improvements and associated miscellaneous work required.
Total Price for Item 000101
Item 000102 – Building H-10: Item 000102 shall be the entire work associated with the demolition of Building H-10 and the redevelopment of the H-10 site, complete in accordance with the RFP requirements, but not including the work indicated or specified to be provided under any Option Item. Include general conditions, hazardous materials abatement, demolition, new improvements, utility refeeds and associated miscellaneous work required.
Total Price for Item 000102
Item 000103 – Building 235: Item 000103 shall be the entire work associated with the demolition of Building 235 and the redevelopment of the Building 235 site, complete in accordance with the RFP requirements, but not including the work indicated or specified to be provided under any Option Item. Include general conditions, hazardous materials abatement, demolition, new improvements, utility refeeds and associated miscellaneous work required.
Total Price for Item 000103
Item 000104 – Building 241: Item 000104 shall be the entire work associated with the demolition of Building 241, and the redevelopment of the Building 241 site, complete in accordance with the RFP requirements, but not including the work indicated or specified to be provided under any Option Item. Include general conditions, hazardous materials abatement, demolition, new improvements, utility refeeds and associated miscellaneous work required.
Total Price for Item 000104
TOTAL PRICE FOR CLIN 0001 (ITEMS 000101 THROUGH 000104):
CLIN 0002 - OPTION 1, WATER LINE RELOCATION, REPLACEMENT AND EXTENSION: CLIN 0002 shall be the total amount for Water Line Relocation, Replacement, and Extension, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0002:
CLIN 0003 - OPTION 2, LOCATE CHILLERS NEAR BUILDING H-10: CLIN 0003 shall be the total amount for Locate Chillers Near Building H-10, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0003:
CLIN 0004 - OPTION 3, LOCATE EMERGENCY GENERATOR NEAR BUILDING H-10: CLIN 0004 shall be the total amount for Locate Emergency Generator Near Building H-10, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0004:
CLIN 0005 - OPTION 4, SOLAR HOT WATER SYSTEM: CLIN 0005 shall be the total amount for Solar Hot Water System, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0005:
CLIN 0006 - OPTION 5, PHOTOVOLTAIC SYSTEM: CLIN 0006 shall be the total amount for Photovoltaic System, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0006:
CLIN 0007 - OPTION 6, PASSENGER ELEVATOR UPGRADES: CLIN 0007 shall be the total amount for Passenger Elevator Upgrades, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0007:
CLIN 0008 - OPTION 7, RELOCATE INTEGRATED POWER CENTER AT BUILDING 241: CLIN 0008 shall be the total amount for Relocate Integrated Power Center at Building 241, complete and in accordance with the drawings and specifications.
TOTAL PRICE FOR CLIN 0008:
TOTAL PRICE FOR ALL CLINs 0001 THROUGH 0008:
1.2 CONTRACT LINE ITEM NOTES
a. Submit offers using this Price Proposal Form and these Contract Line Item Notes.
b. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the options (CLINs 0002 through 0008) to the total price for CLIN 0001 (Items 000101 through 000104). In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
c. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
d. The Government reserves the unilateral right to award CLINs 0002 through 0008 to the Contractor at the proposed price within one hundred twenty (120) calendar days after contract award.
e. The performance period for the work required by base price shall be one thousand two hundred (1,200) calendar days from the date of award (this date includes 15 days for submission and approval of required bonds and insurance). If any or all option items are exercised, the contract completion date remains the same as that of the base price (CLIN 0001), as the work required by these options can be performed concurrent to the base work.
f. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
g. If any of the CLINs 0002 through 0008 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all CLINs.
1.3 UNIT PRICES
This contract will be solicited with unit prices to be applied to estimated quantities for selected work. A description of the items and schedule of the unit price work is contained below. See Contract Clauses, “FAR 52.211-18, Variation in Estimated Quantity” and “FAR 52.236-16, Quantity Surveys Alternate I.” The Contractor shall conduct the original and final surveys and surveys for any periods for which progress payments are requested. All these surveys shall be conducted under the direction of a representative of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance. The Government shall make such computations as are necessary to determine the quantities of work performed or finally in place. The Contractor shall make the computations based on the surveys for any periods for which progress payments are requested.
| Item |
| Description |
| Estimated Quantity |
| Unit |
| Amount |
| 0001a |
| Damaged brick removal and provision |
| 200 |
| SF |
| $_______________ |
| 0001b |
| Mortar joint repointing |
| 1,500 |
| LF |
| $_______________ |
| 0001c |
| Terracotta repair |
| 100 |
| SF |
| $_______________ |
| 0001d |
| Terracotta removal and provision |
| 50 |
| SF |
| $_______________ |
| 0001e |
| Granite sill repair |
| 10 |
| EA |
| $_______________ |
| 0001f |
| Window head lintel/brick/flashing removal and provision |
| 250 |
| LF |
| $_______________ |
| 0001g |
| Slate roof tile removal and provision |
| 100 |
| EA |
| $_______________ |
| 0001h |
| Roof penetration repair (slate, flashings) |
| 150 |
| SF |
| $_______________ |
| 0001i |
| Integral wood/copper gutter repair |
| 300 |
| LF |
| $_______________ |
| 0001j |
| Window insulated glass panel removal and provision |
| 150 |
| SF |
| $_______________ |
| 0001k |
| Window weather seals removal and provision |
| 35 |
| EA |
| $_______________ |
| 0001l |
| Glass block removal and provision |
| 20 |
| SF |
| $_______________ |
| 0001m |
| Roof/wall transition flashing sealant removal and provision |
| 200 |
| LF |
| $_______________ |
| 0001n |
| Roof wood guardrail repair |
| 50 |
| LF |
| $_______________ |
| 0001o |
| Radiation emitting ceramic tile removal/abatement |
| 10,000 |
| SF |
| $_______________ |
| 0001p |
| Copper downspout repair |
| 100 |
| LF |
| $_______________ |
| 0001q |
| Roof overhang wood soffit repair |
| 750 |
| SF |
| $_______________ |
| 0001r |
| Roof overhang wood wall trim repair |
| 250 |
| SF |
| $_______________ |
| 0001s |
| Roof overhang wood fascia repair |
| 700 |
| SF |
| $_______________ |
| 0001t |
| Roof overhang wood bracket supports |
| 50 |
| EA |
| $_______________ |
| 0001u |
| Interior plaster wall/ceiling patching |
| 15,000 |
| SF |
| $_______________ |
| 0001v |
| Abatement of asbestos containing floor tiles |
| 4,000 |
| SF |
| $_______________ |
| 0001w |
| Abatement of asbestos containing flooring mastic |
| 4,000 |
| SF |
| $_______________ |
| 0001x |
| Abatement of asbestos containing pipe insulation |
| 500 |
| LF |
| $_______________ |
| 0001y |
| Abatement of asbestos containing plaster walls |
| 46,000 |
| SF |
| $_______________ |
| 0001z |
| Abatement of asbestos containing plaster ceilings |
| 6,000 |
| SF |
| $_______________ |
| 0001aa |
| Abatement of asbestos containing glazing compound |
| 5 |
| SF |
| $_______________ |
| 0001bb |
| Abatement of PCB containing glazing compound |
| 1 |
| SF |
| $_______________ |
| 0001cc |
| Abatement of mercury containing universal waste |
| 15 |
| 55 gallon drum |
| $_______________ |
| 0001dd |
| Abatement of PCB containing universal waste |
| 10 |
| 55 gallon drum |
| $_______________ |
| 0001ee |
| Removal and reconstruction of loading platform/loading dock |
| 1 |
| EA |
| $_______________ |
| 0001ff |
| Add hazardous soils (contaminated soils excavation, handling, testing and disposal) |
| 5 |
| CY |
| $_______________ |
| 0001gg |
| Repair roof edge flashing |
| 60 |
| LF |
| $_______________ |
| 0001hh |
| Repair exterior HM doors and frames |
| 5 |
| EA |
| $_______________ |
| 0001ii |
| Trench rock removal, disposal, and refill (Item 0001) |
| 240 |
| CY |
| $_______________ |
| 0002a |
| Trench rock removal, disposal, and refill (Item 0002) |
| 400 |
| CY |
| $_______________ |
| 0003a |
| Trench rock removal, disposal, and refill (Item 0003) |
| 120 |
| CY |
| $_______________ |
| 0004a |
| Trench rock removal, disposal, and refill (Item 0004) |
| 175 |
| CY |
| $_______________ |
File details come from the government source that posted it.