1. This contract will be awarded as one lump sum with unit prices required for specifically selected work.
2. See specification section 01 11 00 SUMMARY OF WORK for detailed item descriptions.
CLIN 0001 - BASE PRICE: CLIN 0001 shall be the total amount for Items 0001a through 0001kk and 000101 through 000104, complete and in accordance with the drawings and specifications.
Unit Prices Form
| Item |
| Description |
| Estimated Quantity |
| Unit |
| Amount |
| 0001a |
| Damaged brick removal and provision |
| 200 |
| SF |
| $_______________ |
| 0001b |
| Mortar joint repointing |
| 1,500 |
| LF |
| $_______________ |
| 0001c |
| Terracotta repair |
| 100 |
| SF |
| $_______________ |
| 0001d |
| Terracotta removal and provision |
| 50 |
| SF |
| $_______________ |
| 0001e |
| Granite sill repair |
| 10 |
| EA |
| $_______________ |
| 0001f |
| Window head lintel/brick/flashing removal and provision |
| 250 |
| LF |
| $_______________ |
| 0001g |
| Slate roof tile removal and provision |
| 100 |
| EA |
| $_______________ |
| 0001h |
| Roof penetration repair (slate, flashings) |
| 150 |
| SF |
| $_______________ |
| 0001i |
| Integral wood/copper gutter repair |
| 300 |
| LF |
| $_______________ |
| 0001j |
| Window insulated glass panel removal and provision |
| 150 |
| SF |
| $_______________ |
| 0001k |
| Window weather seals removal and provision |
| 35 |
| EA |
| $_______________ |
| 0001l |
| Glass block removal and provision |
| 20 |
| SF |
| $_______________ |
| 0001m |
| Roof/wall transition flashing sealant removal and provision |
| 200 |
| LF |
| $_______________ |
| 0001n |
| Roof wood guardrail repair |
| 50 |
| LF |
| $_______________ |
| 0001o |
| Radiation emitting ceramic tile removal/abatement |
| 10,000 |
| SF |
| $_______________ |
| 0001p |
| Copper downspout repair |
| 100 |
| LF |
| $_______________ |
| 0001q |
| Roof overhang wood soffit repair |
| 750 |
| SF |
| $_______________ |
| 0001r |
| Roof overhang wood wall trim repair |
| 250 |
| SF |
| $_______________ |
| 0001s |
| Roof overhang wood fascia repair |
| 700 |
| SF |
| $_______________ |
| 0001t |
| Roof overhang wood bracket supports |
| 50 |
| EA |
| $_______________ |
| 0001u |
| Interior plaster wall/ceiling patching |
| 15,000 |
| SF |
| $_______________ |
| 0001v |
| Abatement of asbestos containing floor tiles |
| 4,000 |
| SF |
| $_______________ |
| 0001w |
| Abatement of asbestos containing flooring mastic |
| 4,000 |
| SF |
| $_______________ |
| 0001x |
| Abatement of asbestos containing pipe insulation |
| 500 |
| LF |
| $_______________ |
| 0001y |
| Abatement of asbestos containing plaster walls |
| 46,000 |
| SF |
| $_______________ |
| 0001z |
| Abatement of asbestos containing plaster ceilings |
| 6,000 |
| SF |
| $_______________ |
| 0001aa |
| Abatement of asbestos containing glazing compound |
| 5 |
| SF |
| $_______________ |
| 0001bb |
| Abatement of PCB containing glazing compound |
| 1 |
| SF |
| $_______________ |
| 0001cc |
| Abatement of mercury containing universal waste |
| 15 |
| 55 gallon drum |
| $_______________ |
| 0001dd |
| Abatement of PCB containing universal waste |
| 10 |
| 55 gallon drum |
| $_______________ |
| 0001ee |
| Removal and reconstruction of loading platform/loading dock |
| 1 |
| EA |
| $_______________ |
| 0001ff |
| Add hazardous soils (contaminated soils excavation, handling, testing and disposal) |
| 5 |
| CY |
| $_______________ |
| 0001gg |
| Repair roof edge flashing |
| 60 |
| LF |
| $_______________ |
| 0001hh |
| Repair exterior HM doors and frames |
| 5 |
| EA |
| $_______________ |
| 0001ii |
| Trench rock removal, disposal, and refill (Item 0001) |
| 240 |
| CY |
| $_______________ |
| 0001jj |
| East main entry canopy copper soffit edge repair |
| 40 |
| SF |
| $_______________ |
| 0001kk |
| Repair of damaged or deteriorated copper flashing at roof/wall transitions |
| 150 |
| SF |
| $_______________ |
| 0002a |
| Trench rock removal, disposal and refill (Item 0002) |
| 400 |
| CY |
| $_______________ |
| 0003a |
| Trench rock removal, disposal and refill (Item 0003) |
| 120 |
| CY |
| $_______________ |
| 0004a |
| Trench rock removal, disposal and refill (Item 0004) |
| 175 |
| CY |
| $_______________ |
Base Price
| Item |
| Description |
| Estimated Quantity |
| Unit |
| Unit Price |
| Amount |
| 000102 |
| Building H-10 |
| 1 |
| LS |
TOTAL PRICE FOR CLIN 0001 (ITEMS 000101 THROUGH 000104):
CLIN 0002 - OPTION 1, WATER LINE RELOCATION, REPLACEMENT AND EXTENSION: CLIN 0002 shall be the total amount for Water Line Relocation, Replacement, and Extension, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| LS |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0002:
CLIN 0003 - OPTION 2, LOCATE CHILLERS NEAR BUILDING H-10: CLIN 0003 shall be the total amount for Locate Chillers Near Building H-10, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0003:
CLIN 0004 - OPTION 3, LOCATE EMERGENCY GENERATOR NEAR BUILDING H-10: CLIN 0004 shall be the total amount for Locate Emergency Generator Near Building H-10, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0004:
CLIN 0005 - OPTION 4, SOLAR HOT WATER SYSTEM: CLIN 0005 shall be the total amount for Solar Hot Water System, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0005:
CLIN 0006 - OPTION 5, PHOTOVOLTAIC SYSTEM: CLIN 0006 shall be the total amount for Photovoltaic System, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0006:
CLIN 0007 - OPTION 6, PASSENGER ELEVATOR UPGRADES: CLIN 0007 shall be the total amount for Passenger Elevator Upgrades, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0007:
CLIN 0008 - OPTION 7, RELOCATE INTEGRATED POWER CENTER AT BUILDING 241: CLIN 0008 shall be the total amount for Relocate Integrated Power Center at Building 241, complete and in accordance with the drawings and specifications.
| Estimated Quantity |
| Unit |
| Unit Price |
| Total |
| 1 |
| EA |
| $______________ |
| $__________________ |
TOTAL PRICE FOR CLIN 0008:
TOTAL PRICE FOR ALL CLINs 0001 THROUGH 0008:
1.2 CONTRACT LINE ITEM NOTES
a. Submit offers using this Price Proposal Form and these Contract Line Item Notes.
b. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the options (CLINs 0002 through 0008, including unit price items 0002a, 0003a and 0004a) to the total price for CLIN 0001 (Items 0001a through 0001kk and 000101 through 000104). In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
c. For CLINs 0002 through 0008, enter unit price and extended total in spaces provided. If there is a difference between the unit price and the extended total, the unit price will be held to be the intended price and the total recomputed accordingly. If an offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
d. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
e. The Government reserves the unilateral right to award CLINs 0002 through 0008 to the Contractor at the proposed price within one hundred twenty (120) calendar days after contract award.
f. The performance period for the work required by base price shall be one thousand two hundred (1,200) calendar days from the date of award (this date includes 15 days for submission and approval of required bonds and insurance). If any or all option items are exercised, the contract completion date remains the same as that of the base price (CLIN 0001), as the work required by these options can be performed concurrent to the base work.
g. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
h. If any of the CLINs 0002 through 0008 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all CLINs.