This amendment modifies a solicitation for an indefinite delivery indefinite quantity multiple award construction contract to provide facilities at the Public Works Department at Crane, Indiana. The amendment clarifies that the site visit location has changed and attaches a PDF of conceptual drawings. It also provides responses to six pre-award inquiries, allowing additional pages for the technical solution factor, confirming the CLIN structure on the price proposal form, and maintaining the pre-proposal inquiry cutoff date of July 22nd. The related federal contract opportunity notice describes a total small business set-aside to encompass a wide range of design-build and design-bid-build construction projects for administrative, industrial, maintenance, and other facilities at Naval Facilities Engineering Command Crane.
AMENDMENT_0004.pdf
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BUILD AND DESIGN-BID-BUILD INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT FOR
FACILITIES AT PUBLIC WORKS DEPARTMENT CRANE, INDIANA
The purpose of this amendment is to clarify site visit meeting location and to provide responses to PPIs.
The proposal due date remains 1 August 2018
Philip J. cole (757) 341-1970
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8706
X 9B. DATED (SEE ITEM 11)
21-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jul-2018
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R8706
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
SITE VISIT
Due to the size of the attendee list, the site visit meeting location has changed from B2516 to the Building 56 Training Room.
DRAWING
The file titled “N4008518R87060003B2724 Concept.dwg” has been converted to PDF and attached to this Amendment.
(End of Summary of Changes)
SOLICITATION NO. N40085‐18‐R‐8706
PROJECT TITLE/LOCATION: Crane MACC, NSA Crane, IN
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
1 7/6/2018 Please confirm how many of each proposal volume
(Non‐price and Price) we are to submit to the
Government.
The Government requires 1 orginal and 4 copies of the technical proposal. The Government requires 1 original and 1 copy of the price proposal.
2 7/6/2018
Solicitation Section 00100, Section 4, Page 15 of 57:
Will the Government consider increasing the page limit for this section given the amount of information requested therein? The 5‐page limit is inadequate to address the requirements for Factor
5.
The Government will allow the page limit to a maximum of 10 pages for the Technical Solution
Evaluation Factor. 4
3 7/6/2018
Solicitation Section 00100, Section 4, Page 16 of 57:
The Basis of Evaluation for Factor 5 states, in part, “Proposals providing greater detail and demonstrating a greater understanding of the requirements, as outlined above, may be considered more favorable.” The 5‐page limit for this factor does not allow us to provide the “greater detail” necessary for a more favorable review.
Please consider increasing the page count for this section.
The Government will allow the page limit to a maximum of 10 pages for the Technical Solution
Evaluation Factor.
4 7/6/2018
Solicitation Section 00100, Section 4, Page 16 of 57:
Are the requested conceptual drawings in Item C and the Gantt chart schedule in Item D exempt from the page count for this section?
Yes.
5 7/6/2018
Amend
Amendment 0002, Page 3 and Price Proposal Form in Amendment 0003: The description of the CLINs in Amendment 0002 (Page 3 of 11) differs from the
CLIN description on the Price Proposal Form in
Amendment 0003. Please provide a definitive description of the CLINs for this project.
The Price Proposal Form shall be utilized. The Government does not detect any difference in the CLIN structure mentioned in this PPI 4
6 7/6/2018
Amend
Pre‐Proposal Inquiries (PPIs): The amendment states, "Phase II Pre‐Proposal Inquiry cut off date will be 22 July 2018." This is a Sunday. Due dates for
PPIs are typically set for some time during the work week. Please advise if the Government intends to revise the due date for PPIs.
The PPI cutoff date will remain 22
July.
REFERENCEQuestion
No.
QUESTION
GOVERNMENT RESPONSEDate Received Posted on
Amend No.
July 2011
| AMENDMENT 0004 |
| PPI Log |
| B2724 Concept PDF |