Submittal_Register.pdf

PDF 43 KB Posted

Attached to
Individual Training Course Team Training Facility Federal contract opportunity
Solicitation number
N4008518B6118
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Submittal_Register.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Individual Training Course Team Training Facility, newest first.
File Type Posted
Amend0006_186118.pdf PDF
SpecRevisions.pdf PDF
I-101_I-601.pdf PDF
Amend0005_186118.pdf PDF
Amend0004_186118.pdf PDF
Amend_0003_186118.pdf PDF
Amendment0002_186118.pdf PDF
Amd0001_186118.pdf PDF
Solicitation_186118.pdf PDF
P1481_Wastewater_Permit.pdf PDF
P1481_SW_Permit.pdf PDF
P1481_SPECS.pdf PDF
N4008518B6118_PreSolic_186118.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 8 PAGES

INDIVIDUAL TRAINING COURSE TEAM TRAINING FACILITY

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1 GConcrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications 1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.4.5Admixtures 1.8.1Local/Regional Materials 2.4.9Biodegradable Form Release

Agent SD-05 Design Data

2.3.1 GMix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 8 PAGES

03 30 00 1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Ground Granulated

Blast-Furnace Slag 2.4.3Aggregates 3.10.2.1Tolerance Report

3.14.2.3 GCompressive Strength Tests

3.14.2.4Air Content 3.14.2.1Slump Tests 2.4.2Water

SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.2VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.3Material Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.7.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.3.3Curing Compound 06 20 00 SD-02 Shop Drawings

1.3Detail Drawings SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 8 PAGES

06 20 00 2.5.4 GShelf Hardware SD-07 Certificates

1.4Certificates of grade 1.4Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings 1.5.2Shop Drawings 2.8Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials 2.8.3.3Finish Schedule 1.5.3Certification

SD-04 Samples 2.3Plastic Laminates

SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.5.3 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid 100 percent acrylic Polymer

Material 1.5.1Qualifications 2.3Fabrications

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 8 PAGES

06 61 16 2.1 G IDMaterial

2.3.5 GCounter and Vanity Tops

SD-06 Test Reports Solid 100 percent acrylic Material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up 08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2Accessories 2.3.6Water-resistant Sealer 1.5Warranty

2.1.2 GFire Resistance Rating

SD-04 Samples 2.1Doors

2.3.5.4 GDoor Finish Colors

SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance

SD-07 Certificates 1.3.1Certificates of Grade

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 8 PAGES

08 14 00 1.3.2 GCertified Sustainably Harvested Wood

SD-11 Closeout Submittals 1.5Warranty

08 45 23.00 22 SD-01 Preconstruction Submittals

1.4.3 GQualification of Manufacturer

1.4.4 GQualification of Installation

Contractor

1.7 GWarranty

SD-02 Shop Drawings

1.4.1.1 GInstallation Drawings

SD-03 Product Data

2.1 GSandwich Panel

1.4.5Closure Materials 1.4.5Accessories

SD-04 Samples

2.1 GSandwich Panel

2.3 GFasteners

1.4.1 GColor charts

SD-05 Design Data

1.4.1.2 GWind load design analysis

SD-07 Certificates

2.3 GFasteners

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 8 PAGES

08 45 23.00 22 SD-09 Manufacturer’s Field Reports

3.4.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.7 GWarranty

1.4.6 GMaintenance Instructions

09 65 00 SD-02 Shop Drawings

2.7 G IDFlooring Accessories

SD-03 Product Data

2.7 G IDFlooring Accessories

2.1 G IDWall Base (RB1)

2.3Adhesives

SD-04 Samples

2.7 G IDFlooring Accessories

SD-06 Test Reports

3.3 G IDMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 G IDSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance Data

2.7 G IDFlooring Accessories

09 66 13.10 22 SD-03 Product Data

1.3.1 Gmanufacturer's catalog data

2.1.1 GChemical Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 8 PAGES

09 66 13.10 22 2.1.2 GFloor Joint Sealant

2.1.3 GSurface Sealer

2.2 GGrinding and Polishing

Equipment SD-04 Samples

1.4.2 GPolished Concrete Floor Samples

SD-07 Certificates

1.4.1 GListing of Product Installations

1.4.1 GBusiness Resume

1.4.1 GWarranty

3.10 GWarranty

10 26 00 SD-02 Shop Drawings

2.2 G IDCorner Guards

SD-03 Product Data

2.2 G IDCorner Guards

SD-04 Samples

2.7 G IDFinish

SD-06 Test Reports 2.2Corner Guards

SD-07 Certificates 2.2Corner Guards

12 24 13 SD-02 Shop Drawings

3.3 G IDInstallation

SD-03 Product Data

2.1 G IDWindow Shades

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 8 PAGES

12 24 13 2.1 G IDWindow Shades SD-06 Test Reports

2.1Window Shades SD-08 Manufacturer’s Instructions

2.1Window Shades SD-10 Operation and Maintenance Data

2.1Window Shades SD-11 Closeout Submittals

2.1 SRecycled Content for various

fiber components

1.6 G IDWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.