NAVADMIN_026_18_Checklist_MAY-2018_-_Form_P-495_Chambers_Field_Magazines....pdf

PDF 613 KB Posted

Attached to
DB CHAMBERS FIELD MAGAZINE CONSTRUCTION, PHASE I, NAVAL STATION NORFOLK, VA
Solicitation number
N4008517R0332
Issued by

About this file

NAVADMIN_026_18_Checklist_MAY-2018_-_Form_P-495_Chambers_Field_Magazines....pdf

View the file

Other files

File Type Posted
P495_Revised_Price_Proposal_Form_080718.pdf PDF
AMENDMENT_0016.pdf PDF
Amendment_0015.pdf PDF
Revised_Price_Proposal_Form_051018.pdf PDF
AMENDMENT_0014.pdf PDF
AMENDMENT_13.pdf PDF
ATTACHMENT_G_Price_Proposal_Form_P495_030818.pdf PDF
AMENDMENT_12.pdf PDF
AMENDMENT_0011.pdf PDF
P-495_Amendment_Drawings_1-26-18_Electrical_Site_Plans.pdf PDF
AMENDMENT_0010.pdf PDF
AMENDMENT_0009.pdf PDF
P-495_Amendment_Attachments.pdf PDF
AMENDMENT_0008.pdf PDF
AMENDMENT_0007.pdf PDF
AMENDMENT_0006.pdf PDF
AMENDMENT_0005.pdf PDF
Amendment_0004.pdf PDF
P495_SITE_VISIT_LOG.pdf PDF
Amendment_0003.pdf PDF
ATTACHMENT_H_Site_Visit_COMPOUND_ACCESS.docx DOCX document
N4008517R0332-0002.pdf PDF
ATTACHMENT_G_Price_Proposal_Form_P495.docx DOCX document
Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx DOCX document
N4008517R0332_SOLICIT.pdf PDF
Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx XLSX spreadsheet
Attachment_B_-_Past_Performance_Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Validation Checklist for Applicability of NAVADMIN 026/18 Policy and Exceptions to Minimum Antiterrorism UFC Standards for Navy Projects

Project Name: ________________________________ Project Location: ________________________________ Project No.: ________________________________

WON: ________________________________

FY: ________________________________

Mission Owner: _________________________________

ICO: _________________________________

ATO: _________________________________

UIC: _________________________________

Appropriation: _________________________________

Has the Geographic Combatant Commander (GCC) established more stringent measures than UFC 4‐010‐01?

Yes – Provide attachment with GCC Measures No

Does the project have any unique Antiterrorism measures based on project mission, conditions, or terrorist threat?

Yes – Provide attachment with unique Antiterrorism measures No

Is the project site on an Installation with a Controlled Perimeter as defined by UFC 4‐010‐01?

Yes – NAVADMIN 026/18 may apply No – NAVADMIN 026/18 does not apply

Is the project located more than 50 feet on the interior side of an Installation Controlled Perimeter?

Yes – NAVADMIN 026/18 may apply No – NAVADMIN 026/18 does not apply

Is the project building three stories or more?

Yes – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 may apply No – Fully Exempt from UFC 4‐010‐01 Standard 6

Is the project an existing building?

Yes – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 may apply No – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 does not apply

This project shall proceed with NAVADMIN 026/18 Exceptions as follows:

3.a. Standard 1: Standoff Distances

Exempt – No Standoff Distance required per NAVADMIN 026/18 Not Exempt – Standoff Distances required per UFC 4‐010‐01

3.b. Standard 2: Unobstructed Space Exempt – Unobstructed Space per NAVADMIN 026/18 Not Exempt – Unobstructed Space distance per UFC 4‐010‐01

3.c. Standard 6: Progressive Collapse Resistance Fully Exempt from Standard 6 of UFC 4‐010‐01 Exempt – Progressive Collapse per NAVADMIN 026/18 Not Exempt – Progressive Collapse per UFC 4‐010‐01

3.d. Standard 10: Windows and Skylights Exempt – Window and Skylights per NAVADMIN 026/18 Not Exempt – Window and Skylights per UFC 4‐010‐01

3.e. Standard 12: Exterior Doors Exempt – Exterior Doors per NAVADMIN 026/18 Not Exempt – Exterior Doors per UFC 4‐010‐01

Stakeholder Concurrence:

The following project stakeholders concur with implementation of the NAVADMIN 026/18 Exceptions as noted above.

NAVFAC MIDLANT PWO Date

Form Revision 1 - May 2018 julie.heup Text Box ***Caution*** If a project is Not Exempt for 3.d. and/or 3.e., verify the effect of an Exempt status for 3.a. and/or 3.b. on blast design loads of Windows and Skylights and/or Exterior Doors required to be designed per UFC 4-010-01.

julie.heup Text Box Note: Overhead and in-swinging doors have requirements per UFC 4-010-01 Standard 12 that are NOT REMOVED by 3.e. exemption status.

julie.heup Text Box (Out-swinging, Sliding and Revolving doors only)

Date: 08/01/2018
Enter MILCON or SRM Number: P-495
Enter Project Name: CHAMBERS FIELD MAGAZINES
Enter Mission Owner: CDR Clint Waggoner
Enter Project Location: NAVAL STATION NORFOLK, SEWELLS POINT DET.
Enter WON: 58817
Enter Project Budget Year: 18
Enter Name of Antiterrorism Officer: MAC JACOB ADAIR
Enter Name of Installation Commanding Officer: CAPT Rich McDaniel
Enter UIC: N62688
Enter Appropriation Funding Source: MCON
GCC Measures: No
AT Measures: No
Controlled Perimeter: Yes
>= 50 Feet: Yes
>= 3 Stories: No
Existing Building: No
3:
a:
Standard 1: Exempt
b:
Standard 2: Exempt
c:
Standard 6: Fully Exempt
d:
Standard 10: Exempt
e:
Standard 12: Exempt

Enter details of coordination with project stakeholders to obtain their concurrence: CO NAVSTA Norfolk NAVSTA Norfolk Safety Director NAVSTA Norfolk PWO CO NMCLANT Norfolk

2018-08-07T12:46:57-0400
KRANZ.JASON.GREGORY.1167975883

File details come from the government source that posted it.