NAVADMIN_026_18_Checklist_MAY-2018_-_Form_P-495_Chambers_Field_Magazines....pdf
PDF 613 KB Posted
- Solicitation number
- N4008517R0332
About this file
NAVADMIN_026_18_Checklist_MAY-2018_-_Form_P-495_Chambers_Field_Magazines....pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P495_Revised_Price_Proposal_Form_080718.pdf | ||
| AMENDMENT_0016.pdf | ||
| Amendment_0015.pdf | ||
| Revised_Price_Proposal_Form_051018.pdf | ||
| AMENDMENT_0014.pdf | ||
| AMENDMENT_13.pdf | ||
| ATTACHMENT_G_Price_Proposal_Form_P495_030818.pdf | ||
| AMENDMENT_12.pdf | ||
| AMENDMENT_0011.pdf | ||
| P-495_Amendment_Drawings_1-26-18_Electrical_Site_Plans.pdf | ||
| AMENDMENT_0010.pdf | ||
| AMENDMENT_0009.pdf | ||
| P-495_Amendment_Attachments.pdf | ||
| AMENDMENT_0008.pdf | ||
| AMENDMENT_0007.pdf | ||
| AMENDMENT_0006.pdf | ||
| AMENDMENT_0005.pdf | ||
| Amendment_0004.pdf | ||
| P495_SITE_VISIT_LOG.pdf | ||
| Amendment_0003.pdf | ||
| ATTACHMENT_H_Site_Visit_COMPOUND_ACCESS.docx | DOCX document | |
| N4008517R0332-0002.pdf | ||
| ATTACHMENT_G_Price_Proposal_Form_P495.docx | DOCX document | |
| Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx | DOCX document | |
| N4008517R0332_SOLICIT.pdf | ||
| Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Attachment_B_-_Past_Performance_Questionnaire.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Validation Checklist for Applicability of NAVADMIN 026/18 Policy and Exceptions to Minimum Antiterrorism UFC Standards for Navy Projects
Project Name: ________________________________ Project Location: ________________________________ Project No.: ________________________________
WON: ________________________________
FY: ________________________________
Mission Owner: _________________________________
ICO: _________________________________
ATO: _________________________________
UIC: _________________________________
Appropriation: _________________________________
Has the Geographic Combatant Commander (GCC) established more stringent measures than UFC 4‐010‐01?
Yes – Provide attachment with GCC Measures No
Does the project have any unique Antiterrorism measures based on project mission, conditions, or terrorist threat?
Yes – Provide attachment with unique Antiterrorism measures No
Is the project site on an Installation with a Controlled Perimeter as defined by UFC 4‐010‐01?
Yes – NAVADMIN 026/18 may apply No – NAVADMIN 026/18 does not apply
Is the project located more than 50 feet on the interior side of an Installation Controlled Perimeter?
Yes – NAVADMIN 026/18 may apply No – NAVADMIN 026/18 does not apply
Is the project building three stories or more?
Yes – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 may apply No – Fully Exempt from UFC 4‐010‐01 Standard 6
Is the project an existing building?
Yes – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 may apply No – NAVADMIN 026/18 Exception 3.c for UFC 4‐010‐01 Standard 6 does not apply
This project shall proceed with NAVADMIN 026/18 Exceptions as follows:
3.a. Standard 1: Standoff Distances
Exempt – No Standoff Distance required per NAVADMIN 026/18 Not Exempt – Standoff Distances required per UFC 4‐010‐01
3.b. Standard 2: Unobstructed Space Exempt – Unobstructed Space per NAVADMIN 026/18 Not Exempt – Unobstructed Space distance per UFC 4‐010‐01
3.c. Standard 6: Progressive Collapse Resistance Fully Exempt from Standard 6 of UFC 4‐010‐01 Exempt – Progressive Collapse per NAVADMIN 026/18 Not Exempt – Progressive Collapse per UFC 4‐010‐01
3.d. Standard 10: Windows and Skylights Exempt – Window and Skylights per NAVADMIN 026/18 Not Exempt – Window and Skylights per UFC 4‐010‐01
3.e. Standard 12: Exterior Doors Exempt – Exterior Doors per NAVADMIN 026/18 Not Exempt – Exterior Doors per UFC 4‐010‐01
Stakeholder Concurrence:
The following project stakeholders concur with implementation of the NAVADMIN 026/18 Exceptions as noted above.
NAVFAC MIDLANT PWO Date
Form Revision 1 - May 2018 julie.heup Text Box ***Caution*** If a project is Not Exempt for 3.d. and/or 3.e., verify the effect of an Exempt status for 3.a. and/or 3.b. on blast design loads of Windows and Skylights and/or Exterior Doors required to be designed per UFC 4-010-01.
julie.heup Text Box Note: Overhead and in-swinging doors have requirements per UFC 4-010-01 Standard 12 that are NOT REMOVED by 3.e. exemption status.
julie.heup Text Box (Out-swinging, Sliding and Revolving doors only)
| Date: 08/01/2018 |
| Enter MILCON or SRM Number: P-495 |
| Enter Project Name: CHAMBERS FIELD MAGAZINES |
| Enter Mission Owner: CDR Clint Waggoner |
| Enter Project Location: NAVAL STATION NORFOLK, SEWELLS POINT DET. |
| Enter WON: 58817 |
| Enter Project Budget Year: 18 |
| Enter Name of Antiterrorism Officer: MAC JACOB ADAIR |
| Enter Name of Installation Commanding Officer: CAPT Rich McDaniel |
| Enter UIC: N62688 |
| Enter Appropriation Funding Source: MCON |
| GCC Measures: No |
| AT Measures: No |
| Controlled Perimeter: Yes |
| >= 50 Feet: Yes |
| >= 3 Stories: No |
| Existing Building: No |
| 3: |
| a: |
| Standard 1: Exempt |
| b: |
| Standard 2: Exempt |
| c: |
| Standard 6: Fully Exempt |
| d: |
| Standard 10: Exempt |
| e: |
| Standard 12: Exempt |
Enter details of coordination with project stakeholders to obtain their concurrence: CO NAVSTA Norfolk NAVSTA Norfolk Safety Director NAVSTA Norfolk PWO CO NMCLANT Norfolk
| 2018-08-07T12:46:57-0400 | |
| KRANZ.JASON.GREGORY.1167975883 |
File details come from the government source that posted it.