AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P495 – DESIGN-BUILD, CHAMBERS FIELD MAGAZINE RECAP, PHASE I, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA
ISSUE PHASE II SOLICITATION REQUIREMENTS:
PHASE II PROPOSAL DUE DATE IS FRIDAY, 22 DECEMBER 2017 @ 1400 LOCAL TIME.
SEE SF30 BLOCK 14 CONTINUATION SHEET.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R0332
X 9B. DATED (SEE ITEM 11)
10-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Nov-2017
CODE
NAVFAC MID ATLANTIC
HAMPTON ROADS IPT
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008517R0332
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to provide the following:
1. Issue Phase II Solicitation Requirements to ONLY those offerors selected and notified to participate in submitting Phase II proposals.
2. Phase II Proposal Due Date is: Friday, 22 December 2017 @ 1400 EST
3. Phase II Proposal Delivery Instructions
4. Pre Proposal Inquiries (PPIs) due date: Friday, 08 December 2017 @ 1400 EDT
5. Specification Package WO# 58817
6. Site Visit Information
7. Attachments
8. RFP PHASE II REVISIONS:
Factor 6–Energy Design Reduction: Removed in its Entirety Factor 7–Small Business Utilization: Renamed as Factor 6–Small Business Utilization
9. Provide updated Wage Determination
1. Phase II
The evaluation factors, including both technical and price submittal requirements, are available in the base RFP document and have not been reproduced in this amendment.
See Solicitation #N40085-17-R-0332 for Phase II Submittal Requirements.
2. Phase II Proposal Due Date is Friday, 22 December 2017 @ 1400 EST
3. Proposal Packages may be sent via Federal Express (FedEx), United Postal Service (UPS) or hand-carried to the following address:
ATTN: Vivienne Moore NAVFAC MIDLANT, HAMPTON ROADS IPT, ACQ Office 9324 Virginia Avenue, Building Z140 RM 225 Norfolk, VA 23511-3015
Security Information: Offerors who would like to hand deliver their proposal and who do not currently have a valid badge issued by the Department of Defense (DoD) to enter Naval Station Norfolk must do the following:
Submit the One Day Pass Request Spreadsheet for Project Proposal Drop-Off
(Attachment D) NO LESS THAN 5 BUSINESS DAYS by 2:00 PM EDT prior to the proposal due date. The spreadsheet is uploaded under Additional Documents in NECO. The request shall be sent to Vivienne Moore at vivienne.moore@navy.mil.
Present the following information at the pass office:
Two forms of ID (i.e. Valid Driver’s License and (one of the following) US Social Security Card or Birth Certificate), Current Vehicle Registration and/or Rental Car Contract, Current State Safety Inspection, Current Proof of Insurance.
The Naval Station Norfolk Pass and ID Office is located in Bldg. CD9 at 9040 Hampton Boulevard across from Gate 5. All potential offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level of security at the Naval Station Norfolk may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval Station also increases.
To verify identity, visitors MUST present a second form of identification at the pass office from the list of A or B Documents found at http://www.uscis.gov/i-9-central/acceptable-documents.
4. Pre Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiries form attached to this solicitation as (Attachment A). All inquiries shall be submitted via email to Vivienne Moore, vivienne.moore@navy.mil no later than 08 December 2017 at 1400 EDT. A response will be published as an amendment to the solicitation.
5. Specification Package WO#58817 and Supplementary Attachments (Attached hereto)
6. Site Visit Information:
Wednesday, December 6, 2017
9:00 AM EST
Norfolk Naval Station, Norfolk, Virginia
This will be the ONLY Government scheduled site visit.
Requirements and deadlines below will be strictly enforced. Late requests may not be processed in time for the site visit.
Meet at 9:00 AM EST at 255 Ironmonger Rd, Naval Station Norfolk, Virginia
ALL contractors must submit the attached Site Access Pass Request spreadsheet (Attachment H) in its entirety for personnel attending the site visit regardless if they have DoD base access, in order to obtain access to the Magazine compound. The Site Access Pass requests are due no later than Tuesday, November 28, 2017 @ 12:00 PM EST to vivienne.moore@navy.mil. Requests received after this date and time may not be processed.
Participants who do not have routine active access to Naval Station Norfolk shall complete columns C-G & I of the One Day Pass spreadsheet (Attachment B) and submit via email to vivienne.moore@navy.mil no later than Tuesday, November 28, 2017. Participants who require pass office visitor access are strongly encouraged to allow at least 90 minutes to clear visitor processing at the Naval Station Norfolk Pass Office which is located at Bldg. CD9 at 9040 Hampton Boulevard across from Gate 5. To verify identity, visitors MUST be prepared to present a second form of identification at the pass office from the list of A or B Documents found at http://www.uscis.gov/i-9-central/acceptable-documents.
Cameras and photography are permitted with limitations to be discussed at the site visit.
Contractors are responsible for taking their own photographs during the site visit. The Government will not take photographs nor will photographs be made available after the site visit.
7. Attachments:
SPEC 1 OF 5
SPEC 2 OF 5
SPEC 3 OF 5
SPEC 4 OF 5
SPEC 5 OF 5
Attachment G Price Proposal Form Attachment H Site Visit-Compound Access
8. Solicitation PHASE II REVISIONS:
Factor 6–Energy Design Reduction: Remove in its Entirety Factor 7–Small Business Utilization: Renamed as Factor 6–Small Business Utilization
Solicitation: Page 6 of 45 has been revised to:
E. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-cost/price factors:
Phase I Factor 1 – Technical Approach
Factor 2 – Experience Factor 3 – Past Performance
Phase II Factor 4 – Safety Factor 5 – Technical Solution Factor 6 – Small Business Utilization
9. This amendment hereby incorporates Revised General Decision Number: VA1 11/17/2017
VA171 and replaces all versions previously incorporated.
General Decision Number: VA170171 11/17/2017 VA171 Superseded General Decision Number: VA20160171
State: Virginia
Construction Type: Building
County: Norfolk* County in Virginia.
* INDEPENDENT CITY OF NORFOLK
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/27/2017 2 04/07/2017 3 05/26/2017 4 09/08/2017 5 11/17/2017
* ASBE0024-006 10/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 35.13 16.22
BOIL0045-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 32.72 25.26
BRVA0008-001 12/01/2016
Rates Fringes
BRICKLAYER.......................$ 20.00 7.76
ELEC0080-010 06/01/2016
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 27.49 14.67%+5.55+a
a. Workmen shall take off 2 hours with pay, at the discretion of the employer, on State and National Election days;
Tuesday following the first Monday in November, provided they are qualified and vote.
ELEV0052-005 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 38.86 31.585+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15
IRON0079-012 05/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 25.50 14.80
IRON0079-013 05/01/2017
Rates Fringes
IRONWORKER, RIGGER...............$ 25.50 14.80
PLUM0110-006 11/01/2016
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 27.12 16.03
PLUM0540-010 05/01/2016
Rates Fringes
PLUMBER..........................$ 26.75 15.38
SUVA2013-043 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 19.80 3.98
CAULKER..........................$ 18.49 1.33
CEMENT MASON/CONCRETE FINISHER...$ 20.02 2.00
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 14.82 3.34
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
LABORER: Pipelayer..............$ 12.40 1.86
LABORER: Common or General, Including Demolition.............$ 11.28 1.89
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.57 1.19
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 16.92 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 18.40 2.31
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 20.98 2.62
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION