AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P495 – DESIGN-BUILD, CHAMBERS FIELD MAGAZINE RECAP, PHASE I, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA

SEE SF30 BLOCK 14 CONTINUATION SHEET.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R0332

X 9B. DATED (SEE ITEM 11)

10-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jan-2018

CODE

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008517R0332

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0011

P495 – DESIGN-BUILD, CHAMBERS FIELD MAGAZINE RECAP, PHASE I, NAVAL STATION

NORFOLK, NORFOLK, VIRGINIA

The purpose of this amendment is to provide the following:

1. EXTENDED PROPOSAL DUE DATE: Phase II Proposal Due Date has been revised FROM: Thursday, February 1, 2018 @ 1400 TO: Tuesday, February 6, 2018 @ 1400 LOCAL TIME.

2. PPI’s: 82-85

3. RFP Revisions

4. Revised Drawings (separate attachment)

2.PPI’s

Count

Reference Question

Government Response Page

Section Para-graph

The cable schedule is referenced on E-001 as being included on E-601, which was not sent with the drawings. The cable schedule is required to verify requirements.

See Amendment

Are the six parallel sets of conductors necessary-what is the upstream overcurrent protection size?

Is there an existing one-line that shows this?

See Amendment

Keynote 6 on Drawing ES-103 call out 500 kcmil conductors (six sets), which provides an ampacity of about 1740A according to table 310.60 (C)(77) in the NEC.

See Amendment

The cable counts, the overall capacity and the scale of these recently issued document all could have very large cost implications considering the apparent desired length of that run.

See Amendment

3. RFP REVISIONS

PART 6 – ATTACHMENTS

Modify the following sheets as noted:

E-001 GENERAL NOTES AND LEGEND

Add cable schedule.

N4008517R0332

Also, find the following explanation in reference to the cable schedule:

Duct bank sections will indicate 1 set of 500 kcmil 133% conductors in a 6" conduit, indicated as number 2 in the duct bank section, at some places 1 set of 4/0 kcmil 133% conductors in a 6" conduit, indicated as number 3 in the duct bank section, with the balance of the 6" conduits in the six way ductbank as spares. The upstream overcurrent VFI size and settings and one-line will be provided by UEM, the VFI information associated with the Selected Coordination Study provided with the project.

ES-102 ELECTRICAL SITE PLAN A

Sheet scale is changed to 1” = 10’.

ES-103 ELECTRICAL SITE PLAN B

Sheet scale is changed to 1” = 10’.

ES-104 ELECTRICAL SITE PLAN C

Sheet scale is changed to 1” = 10’.

ES-105 ELECTRICAL SITE PLAN D

Sheet scale is changed to 1” = 10’.

ES-106 ELECTRICAL SITE PLAN E

Sheet scale is changed to 1” = 10’.

ES-107 ELECTRICAL SITE PLAN F

Sheet scale is changed to 1” = 10’.

(End of Summary of Changes)