J-0200000-10 ELINs -ISAR_A0006.xlsx

XLSX spreadsheet 85 KB Posted

Attached to
Indoor Small Arms Range (ISAR) Cleaning and Ventilation System Maintenance Services at U. S. MCAS Iwakuni, Japan
Solicitation number
N4008425B5403
Issued by

About this file

This file is an Exhibit Line Item Numbers (ELIN) attachment for a federal contract opportunity for Indoor Small Arms Range (ISAR) Cleaning and Ventilation System Maintenance Services at U.S. MCAS Iwakuni, Japan. The contract covers a base period from 01 April 2025 through 31 March 2030, with four one-year option periods, and includes both recurring and non-recurring work across two primary service categories: 1502000 Facility Investment and 1800000 Environmental Services.

Key services include emergency, urgent, and routine maintenance for ventilation systems, filter replacements for supply air and exhaust systems (including pre-filters, medium-performance filters, and HEPA filters), heating seasonal start-up and shutdown, and cleaning of the Training Range and Back Room. The contract structure allows for negotiated unit-priced labor and material costs, with a fixed burden rate for ordering and handling materials. The solicitation was issued on 22 January 2025, with a pre-bid conference and site visit scheduled for 13 February 2025, and the contract will be awarded by the Department of the Navy Naval Facilities Engineering Command at U.S. Marine Corps Air Station Iwakuni, Japan.

View the file

Other files

File Type Posted
25B5403_A0007.pdf PDF
Amendment list -ISAR_A0006.pdf PDF
A0006_Gvt_Responses.pdf PDF
25B5403_A0006.pdf PDF
25B5403_A0005.pdf PDF
25B5403_A0004.pdf PDF
A0003_Gvt_Responses.pdf PDF
25B5403_A0003.pdf PDF
Amendment list -ISAR_A0003.pdf PDF
Amendment list -ISAR_A0002.pdf PDF
25B5403_A0002.pdf PDF
GVTResp_PPI01.pdf PDF
25B5403_A0001.pdf PDF
Atch(3)_Escort Request Form_Entry-Exit.pdf PDF
SF1449_25B5403.pdf PDF
Atch (2) J-0200000-10 ELINs -ISAR.xlsx XLSX spreadsheet
Atch(4)_PreAward_Inquiry_Form.xlsx XLSX spreadsheet
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT A - CLIN 0001
Period of Performance: 01 April 2025 through 31 March 2026
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A002
ELIN/Sub ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotal
1502000Facility Investment
Emergency, Urgent, and Routine (E/U/R) Work
1AA15020003.1.1Emergency3EA¥ -
1AB15020003.1.2Urgent3EA¥ -
1AC15020003.1.3Routine3EA¥ -
Preventive Maintenance
1AD15020003.2.1Ventilation Systems1YR¥ -
Other Recurring Services Program
1AE15020003.3.1Ventilation Systems Filter Replacement1YR¥ -
1AF15020003.3.2Heating Seasonal Start-Up and Shutdown1YR¥ -

Facility Investment Subtotal ¥ -

1800000 Environmental

2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 1 YR ¥ -

Environmental Subtotal ¥ -

TOTAL RECURRING WORK PRICE - BASE PERIOD ¥ -

&"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

&"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Non-Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT A - CLIN 0002
Period of Performance: 01 April 2025 through 31 March 2026
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A713
ELINProduct Name
(120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price

(Unit Price x Estimated Quantity)

Unit Priced Task (UPT) Work
1502000Facility Investment
A700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
1ALL FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
2ALL FILTERS replacement for EXHAUST systemsThe Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
3PRE-FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
5PRE-FILTERS replacement for EXHAUST systemsThe Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemsThe Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
7HEPA FILTERS replacement for EXHAUST systemsThe Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
8(Reserved)
1800000Environmental
9Training Range CleaningThe Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2.1EA¥ -
10Back Room CleaningThe Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2.1EA¥ -
11(Reserved)
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.

Labor
12Unit Priced Labor Work - MUST BE NEGOTIATED BY KOLabor Price Total of A712AA through A712AD¥ -
12AALabor Price - Custodian/lead abatementProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ABLabor Price - Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ACLabor Price - SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
12ADLabor Price - QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
Material and Equipment
13Material and Equipment Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A712.1,000,000EA¥ 1¥ 1,000,000
Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.

¥100,000 + (¥100,000 x 10%) = ¥110,000 %

TOTAL NON-RECURRING WORK PRICE - BASE PERIOD ¥ 1,000,000

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

1st OP Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT B - CLIN 0003
Period of Performance: 01 April 2026 through 31 March 2027
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B002
ELIN/Sub ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotal
1502000Facility Investment
Emergency, Urgent, and Routine (E/U/R) Work
1AA15020003.1.1Emergency5EA¥ -
1AB15020003.1.2Urgent5EA¥ -
1AC15020003.1.3Routine5EA¥ -
Preventive Maintenance
1AD15020003.2.1Ventilation Systems1YR¥ -
Other Recurring Services Program
1AE15020003.3.1Ventilation Systems Filter Replacement1YR¥ -
1AF15020003.3.2Heating Seasonal Start-Up and Shutdown1YR¥ -

Facility Investment Subtotal ¥ -

1800000 Environmental

2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 1 YR ¥ -

Environmental Subtotal ¥ -

TOTAL RECURRING WORK PRICE - 1ST OPTION PERIOD ¥ -

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

1st OP Non-Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT B - CLIN 0004
Period of Performace: 01 April 2026 through 31 March 2027
Line Item 0004 Non-Recurring Work - 1st Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B713
ELINProduct Name
(120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price

(Unit Price x Estimated Quantity)

Unit Priced Task (UPT) Work
1502000Facility Investment
B700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
1ALL FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
2ALL FILTERS replacement for EXHAUST systemsThe Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
3PRE-FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
5PRE-FILTERS replacement for EXHAUST systemsThe Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemsThe Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
7HEPA FILTERS replacement for EXHAUST systemsThe Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
8(Reserved)
1800000Environmental
9Training Range CleaningThe Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2.1EA¥ -
10Back Room CleaningThe Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2.1EA¥ -
11(Reserved)
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.

Labor
12Unit Priced Labor Work - MUST BE NEGOTIATED BY KOLabor Price Total of B712AA through B712AD¥ -
12AALabor Price - Custodian/lead abatementProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ABLabor Price - Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ACLabor Price - SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
12ADLabor Price - QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
Material and Equipment
13Material and Equipment Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B712.1,000,000EA¥ 1¥ 1,000,000
Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.

¥100,000 + (¥100,000 x 10%) = ¥110,000 %

TOTAL NON-RECURRING WORK PRICE - 1st OPTION PERIOD ¥ 1,000,000

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

2nd OP Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084
EXHIBIT C - CLIN 0005
Period of Performace: 01 April 2027 through 31 March 2028
Line Item 0005 Recurring Work - 2nd Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C002
ELIN/Sub ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotal
1502000Facility Investment
Emergency, Urgent, and Routine (E/U/R) Work
1AA15020003.1.1Emergency5EA¥ -
1AB15020003.1.2Urgent5EA¥ -
1AC15020003.1.3Routine5EA¥ -
Preventive Maintenance
1AD15020003.2.1Ventilation Systems1YR¥ -
Other Recurring Services Program
1AE15020003.3.1Ventilation Systems Filter Replacement1YR¥ -
1AF15020003.3.2Heating Seasonal Start-Up and Shutdown1YR¥ -

Facility Investment Subtotal ¥ -

1800000 Environmental

2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 1 YR ¥ -

Environmental Subtotal ¥ -

TOTAL RECURRING WORK PRICE - 2ND OPTION PERIOD ¥ -

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

2nd OP Non-Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT C - CLIN 0006
Period of Performace: 01 April 2027 through 31 March 2028
Line Item 0006 Non-Recurring Work - 2nd Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C713
ELINProduct Name
(120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price

(Unit Price x Estimated Quantity)

Unit Priced Task (UPT) Work
1502000Facility Investment
C700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
1ALL FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
2ALL FILTERS replacement for EXHAUST systemsThe Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
3PRE-FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
5PRE-FILTERS replacement for EXHAUST systemsThe Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemsThe Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
7HEPA FILTERS replacement for EXHAUST systemsThe Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
8(Reserved)
1800000Environmental
9Training Range CleaningThe Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2.1EA¥ -
10Back Room CleaningThe Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2.1EA¥ -
11(Reserved)
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.

Labor
12Unit Priced Labor Work - MUST BE NEGOTIATED BY KOLabor Price Total of C712AA through C712AD¥ -
12AALabor Price - Custodian/lead abatementProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ABLabor Price - Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ACLabor Price - SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
12ADLabor Price - QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
Material and Equipment
13Material and Equipment Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C712.1,000,000EA¥ 1¥ 1,000,000
Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.

¥100,000 + (¥100,000 x 10%) = ¥110,000 %

TOTAL NON-RECURRING WORK PRICE - 2nd OPTION PERIOD ¥ 1,000,000

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

3rd OP Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084
EXHIBIT D - CLIN 0007
Period of Performace: 01 April 2028 through 31 March 2029
Line Item 0007 Recurring Work - 3rd Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D002
ELIN/Sub ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotal
1502000Facility Investment
Emergency, Urgent, and Routine (E/U/R) Work
1AA15020003.1.1Emergency5EA¥ -
1AB15020003.1.2Urgent5EA¥ -
1AC15020003.1.3Routine5EA¥ -
Preventive Maintenance
1AD15020003.2.1Ventilation Systems1YR¥ -
Other Recurring Services Program
1AE15020003.3.1Ventilation Systems Filter Replacement1YR¥ -
1AF15020003.3.2Heating Seasonal Start-Up and Shutdown1YR¥ -

Facility Investment Subtotal ¥ -

1800000 Environmental

2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 1 YR ¥ -

Environmental Subtotal ¥ -

TOTAL RECURRING WORK PRICE - 3RD OPTION PERIOD ¥ -

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

3rd OP Non-Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT D - CLIN 0008
Period of Performace: 01 April 2028 through 31 March 2029
Line Item 0008 Non-Recurring Work - 3rd Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 through D713
ELINProduct Name
(120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price

(Unit Price x Estimated Quantity)

Unit Priced Task (UPT) Work
1502000Facility Investment
D700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
1ALL FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
2ALL FILTERS replacement for EXHAUST systemsThe Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
3PRE-FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
5PRE-FILTERS replacement for EXHAUST systemsThe Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemsThe Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
7HEPA FILTERS replacement for EXHAUST systemsThe Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
8(Reserved)
1800000Environmental
9Training Range CleaningThe Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2.1EA¥ -
10Back Room CleaningThe Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2.1EA¥ -
11(Reserved)
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.

Labor
12Unit Priced Labor Work - MUST BE NEGOTIATED BY KOLabor Price Total of D712AA through D712AD¥ -
12AALabor Price - Custodian/lead abatementProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ABLabor Price - Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ACLabor Price - SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
12ADLabor Price - QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
Material and Equipment
13Material and Equipment Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D712.1,000,000EA¥ 1¥ 1,000,000
Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.

¥100,000 + (¥100,000 x 10%) = ¥110,000 %

TOTAL NON-RECURRING WORK PRICE - 3rd OPTION PERIOD ¥ 1,000,000

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

4th OP Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084
EXHIBIT E - CLIN 0009
Period of Performace: 01 April 2029 through 31 March 2030
Line Item 0009 Recurring Work - 4th Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 through E002
ELIN/Sub ELINAnnex/Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotal
1502000Facility Investment
Emergency, Urgent, and Routine (E/U/R) Work
1AA15020003.1.1Emergency5EA¥ -
1AB15020003.1.2Urgent5EA¥ -
1AC15020003.1.3Routine5EA¥ -
Preventive Maintenance
1AD15020003.2.1Ventilation Systems1YR¥ -
Other Recurring Services Program
1AE15020003.3.1Ventilation Systems Filter Replacement1YR¥ -
1AF15020003.3.2Heating Seasonal Start-Up and Shutdown1YR¥ -

Facility Investment Subtotal ¥ -

1800000 Environmental

2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 1 YR ¥ -

Environmental Subtotal ¥ -

TOTAL RECURRING WORK PRICE - 4TH OPTION PERIOD ¥ -

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]

4th OP Non-Recurring

ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS
CONTRACT #40084 (to be added after contract award)
EXHIBIT E - CLIN 0010
Period of Performace: 01 April 2029 through 31 March 2030
Line Item 0010 Non-Recurring Work - 4th Option Period
PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs E700 through E713
ELINProduct Name
(120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price

(Unit Price x Estimated Quantity)

Unit Priced Task (UPT) Work
1502000Facility Investment
E700ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systemsThe Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
1ALL FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
2ALL FILTERS replacement for EXHAUST systemsThe Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
3PRE-FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
4MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systemsThe Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1.1EA¥ -
5PRE-FILTERS replacement for EXHAUST systemsThe Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
6MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systemsThe Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
7HEPA FILTERS replacement for EXHAUST systemsThe Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1.1EA¥ -
8(Reserved)
1800000Environmental
9Training Range CleaningThe Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2.1EA¥ -
10Back Room CleaningThe Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2.1EA¥ -
11(Reserved)
Unit Priced Labor (UPL) Work
Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work.

Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.

Labor
12Unit Priced Labor Work - MUST BE NEGOTIATED BY KOLabor Price Total of E712AA through E712AD¥ -
12AALabor Price - Custodian/lead abatementProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ABLabor Price - Maintenance EngineerProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.24HR¥ -
12ACLabor Price - SSHOProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
12ADLabor Price - QMProvide labor to perform all UPL work per the scope and delivery schedule specified in the order.16HR¥ -
Material and Equipment
13Material and Equipment Costs- MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E712.1,000,000EA¥ 1¥ 1,000,000
Fixed Burden Rate (FBR)The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO.

For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.

¥100,000 + (¥100,000 x 10%) = ¥110,000 %

TOTAL NON-RECURRING WORK PRICE - 4th OPTION PERIOD ¥ 1,000,000