Atch (2) J-0200000-10 ELINs -ISAR.xlsx
XLSX spreadsheet 85 KB Posted
- Solicitation number
- N4008425B5403
About this file
This is a pricing template attachment (J-0200000-10) for a contract covering Indoor Small Arms Range (ISAR) cleaning and ventilation system maintenance services at MCAS Iwakuni, Japan. The template includes pricing tables for both recurring and non-recurring work across a base period (April 2025-March 2026) and four option periods through March 2030.
The pricing structure covers two main service categories: Facility Investment (including emergency/urgent/routine work, ventilation systems maintenance, and filter replacement) and Environmental services (ISAR cleaning). The template requires unit pricing for various filter replacements (pre-filters, medium-performance filters, and HEPA filters) for both supply air and exhaust systems, as well as hourly labor rates for custodians/lead abatement workers, maintenance engineers, safety officers (SSHO), and quality managers (QM). Material and equipment costs are to be negotiated by the contracting officer, with a Fixed Burden Rate applied for handling and stockpiling materials. All pricing is to be provided in Japanese Yen.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25B5403_A0007.pdf | ||
| J-0200000-10 ELINs -ISAR_A0006.xlsx | XLSX spreadsheet | |
| Amendment list -ISAR_A0006.pdf | ||
| A0006_Gvt_Responses.pdf | ||
| 25B5403_A0006.pdf | ||
| 25B5403_A0005.pdf | ||
| 25B5403_A0004.pdf | ||
| A0003_Gvt_Responses.pdf | ||
| 25B5403_A0003.pdf | ||
| Amendment list -ISAR_A0003.pdf | ||
| Amendment list -ISAR_A0002.pdf | ||
| 25B5403_A0002.pdf | ||
| GVTResp_PPI01.pdf | ||
| 25B5403_A0001.pdf | ||
| Atch(3)_Escort Request Form_Entry-Exit.pdf | ||
| SF1449_25B5403.pdf | ||
| Atch(4)_PreAward_Inquiry_Form.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT A - CLIN 0001 |
| Period of Performance: 01 April 2025 through 31 March 2026 |
| Line Item 0001 Recurring Work - Base Period | ||||||||
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs A001 through A002 | ||||||||
| ELIN/Sub ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | |
| 1502000 | Facility Investment | |||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| 1 | AA | 1502000 | 3.1.1 | Emergency | 3 | EA | ¥ - | |
| 1 | AB | 1502000 | 3.1.2 | Urgent | 3 | EA | ¥ - | |
| 1 | AC | 1502000 | 3.1.3 | Routine | 3 | EA | ¥ - | |
| Preventive Maintenance | ||||||||
| 1 | AD | 1502000 | 3.2.1 | Ventilation Systems | 12 | MO | ¥ - | |
| Other Recurring Services Program | ||||||||
| 1 | AE | 1502000 | 3.3.1 | Ventilation Systems Filter Replacement | 12 | MO | ¥ - | |
| 1 | AF | 1502000 | 3.3.2 | Heating Seasonal Start-Up and Shutdown | 12 | MO | ¥ - |
Facility Investment Subtotal ¥ -
1800000 Environmental
2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 12 MO ¥ -
Environmental Subtotal ¥ -
TOTAL RECURRING WORK PRICE - BASE PERIOD ¥ -
&"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
&"Times New Roman,Regular"CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Base Non-Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT A - CLIN 0002 |
| Period of Performance: 01 April 2025 through 31 March 2026 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A713 |
| ELIN | Product Name | ||||
| (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
(Unit Price x Estimated Quantity)
| Unit Priced Task (UPT) Work | |||||
| 1502000 | Facility Investment | ||||
| A700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | The Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 1 | ALL FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 2 | ALL FILTERS replacement for EXHAUST systems | The Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 3 | PRE-FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 5 | PRE-FILTERS replacement for EXHAUST systems | The Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 6 | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systems | The Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 7 | HEPA FILTERS replacement for EXHAUST systems | The Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 8 | (Reserved) |
| 1800000 | Environmental | ||||
| 9 | Training Range Cleaning | The Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 10 | Back Room Cleaning | The Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 11 | (Reserved) |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.
| Labor | |||||||
| 12 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Labor Price Total of A712AA through A712AD | ¥ - | ||||
| 12 | AA | Labor Price - Custodian/lead abatement | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AB | Labor Price - Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AC | Labor Price - SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| 12 | AD | Labor Price - QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| Material and Equipment | |||||||
| 13 | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A712. | 1,000,000 | EA | ¥ 1 | ¥ 1,000,000 | |
| Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. |
For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.
¥100,000 + (¥100,000 x 10%) = ¥110,000 %
TOTAL NON-RECURRING WORK PRICE - BASE PERIOD ¥ 1,000,000
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
1st OP Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT B - CLIN 0003 |
| Period of Performance: 01 April 2026 through 31 March 2027 |
| Line Item 0003 Recurring Work - 1st Option Period | ||||||||
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs B001 through B002 | ||||||||
| ELIN/Sub ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | |
| 1502000 | Facility Investment | |||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| 1 | AA | 1502000 | 3.1.1 | Emergency | 5 | EA | ¥ - | |
| 1 | AB | 1502000 | 3.1.2 | Urgent | 5 | EA | ¥ - | |
| 1 | AC | 1502000 | 3.1.3 | Routine | 5 | EA | ¥ - | |
| Preventive Maintenance | ||||||||
| 1 | AD | 1502000 | 3.2.1 | Ventilation Systems | 12 | MO | ¥ - | |
| Other Recurring Services Program | ||||||||
| 1 | AE | 1502000 | 3.3.1 | Ventilation Systems Filter Replacement | 12 | MO | ¥ - | |
| 1 | AF | 1502000 | 3.3.2 | Heating Seasonal Start-Up and Shutdown | 12 | MO | ¥ - |
Facility Investment Subtotal ¥ -
1800000 Environmental
2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 12 MO ¥ -
Environmental Subtotal ¥ -
TOTAL RECURRING WORK PRICE - 1ST OPTION PERIOD ¥ -
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
1st OP Non-Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT B - CLIN 0004 |
| Period of Performace: 01 April 2026 through 31 March 2027 |
| Line Item 0004 Non-Recurring Work - 1st Option Period |
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B713 |
| ELIN | Product Name | ||||
| (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
(Unit Price x Estimated Quantity)
| Unit Priced Task (UPT) Work | |||||
| 1502000 | Facility Investment | ||||
| B700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | The Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 1 | ALL FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 2 | ALL FILTERS replacement for EXHAUST systems | The Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 3 | PRE-FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 5 | PRE-FILTERS replacement for EXHAUST systems | The Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 6 | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systems | The Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 7 | HEPA FILTERS replacement for EXHAUST systems | The Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 8 | (Reserved) |
| 1800000 | Environmental | ||||
| 9 | Training Range Cleaning | The Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 10 | Back Room Cleaning | The Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 11 | (Reserved) |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.
| Labor | |||||||
| 12 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Labor Price Total of B712AA through B712AD | ¥ - | ||||
| 12 | AA | Labor Price - Custodian/lead abatement | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AB | Labor Price - Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AC | Labor Price - SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| 12 | AD | Labor Price - QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| Material and Equipment | |||||||
| 13 | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B712. | 1,000,000 | EA | ¥ 1 | ¥ 1,000,000 | |
| Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. |
For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.
¥100,000 + (¥100,000 x 10%) = ¥110,000 %
TOTAL NON-RECURRING WORK PRICE - 1st OPTION PERIOD ¥ 1,000,000
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
2nd OP Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 |
| EXHIBIT C - CLIN 0005 |
| Period of Performace: 01 April 2027 through 31 March 2028 |
| Line Item 0005 Recurring Work - 2nd Option Period | ||||||||
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs C001 through C002 | ||||||||
| ELIN/Sub ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | |
| 1502000 | Facility Investment | |||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| 1 | AA | 1502000 | 3.1.1 | Emergency | 5 | EA | ¥ - | |
| 1 | AB | 1502000 | 3.1.2 | Urgent | 5 | EA | ¥ - | |
| 1 | AC | 1502000 | 3.1.3 | Routine | 5 | EA | ¥ - | |
| Preventive Maintenance | ||||||||
| 1 | AD | 1502000 | 3.2.1 | Ventilation Systems | 12 | MO | ¥ - | |
| Other Recurring Services Program | ||||||||
| 1 | AE | 1502000 | 3.3.1 | Ventilation Systems Filter Replacement | 12 | MO | ¥ - | |
| 1 | AF | 1502000 | 3.3.2 | Heating Seasonal Start-Up and Shutdown | 12 | MO | ¥ - |
Facility Investment Subtotal ¥ -
1800000 Environmental
2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 12 MO ¥ -
Environmental Subtotal ¥ -
TOTAL RECURRING WORK PRICE - 2ND OPTION PERIOD ¥ -
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
2nd OP Non-Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT C - CLIN 0006 |
| Period of Performace: 01 April 2027 through 31 March 2028 |
| Line Item 0006 Non-Recurring Work - 2nd Option Period |
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C713 |
| ELIN | Product Name | ||||
| (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
(Unit Price x Estimated Quantity)
| Unit Priced Task (UPT) Work | |||||
| 1502000 | Facility Investment | ||||
| C700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | The Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 1 | ALL FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 2 | ALL FILTERS replacement for EXHAUST systems | The Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 3 | PRE-FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 5 | PRE-FILTERS replacement for EXHAUST systems | The Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 6 | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systems | The Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 7 | HEPA FILTERS replacement for EXHAUST systems | The Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 8 | (Reserved) |
| 1800000 | Environmental | ||||
| 9 | Training Range Cleaning | The Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 10 | Back Room Cleaning | The Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 11 | (Reserved) |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.
| Labor | |||||||
| 12 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Labor Price Total of C712AA through C712AD | ¥ - | ||||
| 12 | AA | Labor Price - Custodian/lead abatement | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AB | Labor Price - Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AC | Labor Price - SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| 12 | AD | Labor Price - QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| Material and Equipment | |||||||
| 13 | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C712. | 1,000,000 | EA | ¥ 1 | ¥ 1,000,000 | |
| Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. |
For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.
¥100,000 + (¥100,000 x 10%) = ¥110,000 %
TOTAL NON-RECURRING WORK PRICE - 2nd OPTION PERIOD ¥ 1,000,000
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
3rd OP Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 |
| EXHIBIT D - CLIN 0007 |
| Period of Performace: 01 April 2028 through 31 March 2029 |
| Line Item 0007 Recurring Work - 3rd Option Period | ||||||||
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs D001 through D002 | ||||||||
| ELIN/Sub ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | |
| 1502000 | Facility Investment | |||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| 1 | AA | 1502000 | 3.1.1 | Emergency | 5 | EA | ¥ - | |
| 1 | AB | 1502000 | 3.1.2 | Urgent | 5 | EA | ¥ - | |
| 1 | AC | 1502000 | 3.1.3 | Routine | 5 | EA | ¥ - | |
| Preventive Maintenance | ||||||||
| 1 | AD | 1502000 | 3.2.1 | Ventilation Systems | 12 | MO | ¥ - | |
| Other Recurring Services Program | ||||||||
| 1 | AE | 1502000 | 3.3.1 | Ventilation Systems Filter Replacement | 12 | MO | ¥ - | |
| 1 | AF | 1502000 | 3.3.2 | Heating Seasonal Start-Up and Shutdown | 12 | MO | ¥ - |
Facility Investment Subtotal ¥ -
1800000 Environmental
2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 12 MO ¥ -
Environmental Subtotal ¥ -
TOTAL RECURRING WORK PRICE - 3RD OPTION PERIOD ¥ -
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
3rd OP Non-Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT D - CLIN 0008 |
| Period of Performace: 01 April 2028 through 31 March 2029 |
| Line Item 0008 Non-Recurring Work - 3rd Option Period |
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D713 |
| ELIN | Product Name | ||||
| (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
(Unit Price x Estimated Quantity)
| Unit Priced Task (UPT) Work | |||||
| 1502000 | Facility Investment | ||||
| D700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | The Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 1 | ALL FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 2 | ALL FILTERS replacement for EXHAUST systems | The Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 3 | PRE-FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 5 | PRE-FILTERS replacement for EXHAUST systems | The Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 6 | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systems | The Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 7 | HEPA FILTERS replacement for EXHAUST systems | The Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 8 | (Reserved) |
| 1800000 | Environmental | ||||
| 9 | Training Range Cleaning | The Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 10 | Back Room Cleaning | The Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 11 | (Reserved) |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.
| Labor | |||||||
| 12 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Labor Price Total of D712AA through D712AD | ¥ - | ||||
| 12 | AA | Labor Price - Custodian/lead abatement | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AB | Labor Price - Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AC | Labor Price - SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| 12 | AD | Labor Price - QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| Material and Equipment | |||||||
| 13 | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D712. | 1,000,000 | EA | ¥ 1 | ¥ 1,000,000 | |
| Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. |
For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.
¥100,000 + (¥100,000 x 10%) = ¥110,000 %
TOTAL NON-RECURRING WORK PRICE - 3rd OPTION PERIOD ¥ 1,000,000
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
4th OP Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 |
| EXHIBIT E - CLIN 0009 |
| Period of Performace: 01 April 2029 through 31 March 2030 |
| Line Item 0009 Recurring Work - 4th Option Period | ||||||||
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELINs E001 through E002 | ||||||||
| ELIN/Sub ELIN | Annex/Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | |
| 1502000 | Facility Investment | |||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| 1 | AA | 1502000 | 3.1.1 | Emergency | 5 | EA | ¥ - | |
| 1 | AB | 1502000 | 3.1.2 | Urgent | 5 | EA | ¥ - | |
| 1 | AC | 1502000 | 3.1.3 | Routine | 5 | EA | ¥ - | |
| Preventive Maintenance | ||||||||
| 1 | AD | 1502000 | 3.2.1 | Ventilation Systems | 12 | MO | ¥ - | |
| Other Recurring Services Program | ||||||||
| 1 | AE | 1502000 | 3.3.1 | Ventilation Systems Filter Replacement | 12 | MO | ¥ - | |
| 1 | AF | 1502000 | 3.3.2 | Heating Seasonal Start-Up and Shutdown | 12 | MO | ¥ - |
Facility Investment Subtotal ¥ -
1800000 Environmental
2 AA 1800000 3.1 Indoor Small Arms Range (ISAR) Cleaning 12 MO ¥ -
Environmental Subtotal ¥ -
TOTAL RECURRING WORK PRICE - 4TH OPTION PERIOD ¥ -
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
4th OP Non-Recurring
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #40084 (to be added after contract award) |
| EXHIBIT E - CLIN 0010 |
| Period of Performace: 01 April 2029 through 31 March 2030 |
| Line Item 0010 Non-Recurring Work - 4th Option Period |
| PROVIDE PRICES FOR 1502000 FACILITY INVESTMENT AND 1800000 ENVIRONMENTAL -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E713 |
| ELIN | Product Name | ||||
| (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
(Unit Price x Estimated Quantity)
| Unit Priced Task (UPT) Work | |||||
| 1502000 | Facility Investment | ||||
| E700 | ALL FILTERS replacement for both SUPPLY AIR and EXHAUST systems | The Contractor shall replace all filters for both the Supply Air Systems and Exhaust Systems. (Pre-filters and Medium-Performance Filters for the Supply Air Systems (AHU-1 & AHU-2), and Pre-filters, Medium-Performance Filters, and HEPA Filters for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 1 | ALL FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace all filters (Pre-filters and Medium-Performance Filters) for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 2 | ALL FILTERS replacement for EXHAUST systems | The Contractor shall replace all filters (Pre-Filters, Medium-Performance Filters, and HEPA Filters) for the Exhaust Systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 3 | PRE-FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Pre-filters for the Supply Air Systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 4 | MEDIUM-PERFORMANCE FILTERS replacement for SUPPLY AIR systems | The Contractor shall replace Medium-Performance Filters for the supply air systems (AHU-1 & AHU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 5 | PRE-FILTERS replacement for EXHAUST systems | The Contractor shall replace Pre-filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 6 | MEDIUM-PERFORMANCE FILTERS replacement for EXHAUST systems | The Contractor shall replace Medium-Performance filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 7 | HEPA FILTERS replacement for EXHAUST systems | The Contractor shall replace HEPA Filters for the exhaust systems (EFU-1 & EFU-2) per Spec Item 3.3.1. | 1 | EA | ¥ - |
| 8 | (Reserved) |
| 1800000 | Environmental | ||||
| 9 | Training Range Cleaning | The Contractor shall clean the Training Range (Room 101a) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 10 | Back Room Cleaning | The Contractor shall clean the Back Room (Room 101b) per Spec Item 3.1 through 3.1.2. | 1 | EA | ¥ - |
| 11 | (Reserved) |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the descriptions of UPL Hour and FBR to determine the labor hour unit prices and the FBR below.
| Labor | |||||||
| 12 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Labor Price Total of E712AA through E712AD | ¥ - | ||||
| 12 | AA | Labor Price - Custodian/lead abatement | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AB | Labor Price - Maintenance Engineer | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 24 | HR | ¥ - | |
| 12 | AC | Labor Price - SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| 12 | AD | Labor Price - QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 16 | HR | ¥ - | |
| Material and Equipment | |||||||
| 13 | Material and Equipment Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E712. | 1,000,000 | EA | ¥ 1 | ¥ 1,000,000 | |
| Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment cost negotiated by KO. |
For example, if the material and equipmet cost negotiated by KO is ¥100,000 and the Contractor's Fixed Burden Rate is 10%, then ¥10,000 (¥100,000 x 10%) will be added to the material and equipment cost.
¥100,000 + (¥100,000 x 10%) = ¥110,000 %
TOTAL NON-RECURRING WORK PRICE - 4th OPTION PERIOD ¥ 1,000,000
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
SOURCE SELECTION SENSITIVE - See FAR 2.101 and 3.104 [when filled]
File details come from the government source that posted it. Updated .