This document is a Pre-Bid Inquiry Amendment related to Solicitation No. N4008424B0404 for the Base Operations Support Contract (BOSC) at New Sanno, Tokyo, Japan.

The key details are:

  • The contractor must obtain certain construction permits, including Machinery and Equipment Installation, Telecommunication Construction, Electrical Engineering, Painting, Water Supply Facilities Construction, and Fire Protection equipment construction.
  • The contractor inquired if Scaffolding Work, Earthwork and Concrete Work permits could be submitted instead of Machinery and Equipment Installation, and if a Plumbing Business permit could be submitted instead of a Water Supply Facilities Construction permit.
  • The government responded that a scaffolding, earthwork, and concrete permit is not equivalent to a machinery and equipment installation permit, but a plumbing permit can be considered equivalent to a waterworks facility construction permit. The specification was updated accordingly.
  • The federal agency involved is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. N4008424B0404

PROJECT TITLE/LOCATION: BOSC AT NEW SANNO

Pre-Bid/Proposal Inquiry Form Amendment 0003

Sub Annex Spec Item Title 20 10/2/2024 509 1502000-

Facility Investment

2.3.3 We are afraid that we would like to ask you again.

Spec. Item 2.3.3 indicates that the Contractor's specific construction permit or common construction permit shall include the following minimum required types of construction work.

● Building 1 type of fortification (Amend 0001)

● Machinery and equipment installation

● Telecommunication Construction Industry

● Electrical Engineering Industry

● Painting Industry

● Water Supply Facilities Construction Business

● Painting Work

● Fire Protection equipment construction business Generally, Scaffolding Work, Earth Work and Concrete Work Permit (Tobi, Dokouji) shall include the work which Machinery and Equipment Installation shall do, in addition, Plumbing Business permit (Kan Kouji Gyou) shall include the work which Water Supply Facilities Construction Business shall do.

Also, these permit shall NOT be applied to the maintenance services for recurring and non-recurring work under this solicitation.

Can you accept that Scaffolding Work, Earth Work and Concrete Work Permit (Tobi, Dokouji Gyou) be submitted in stead of Machinery and Equipment Installation, and that Plumbing Business permit (Kan Kouji Gyou) be submitted in stead of Water Supply Facilities Construction Business?

No, a scaffolding, earthwork, and concrete construction permit is not granted instead of a mechanical equipment installation permit. A permit for scaffolding, earthwork, and concrete work includes a very limited portion of the work performed by the machinery and equipment installation business, but it is not considered equivalent.

However, a plumbing permit instead of a waterworks facility construction permit can be considered equivalent.

Added "and/or Plumbing Business (“Kan Kouji Gyou”)" after "Water Supply Facilities Construction Business ("Suidou-Shisetsu-Kouji- Gyou”)" at Spec Item 2.3.3 in the Specification (PWS).

Posted on Amend No.

Question No. Date Submitted