Attachment9_Amend-0003_Summary.pdf

PDF 182 KB Posted

Attached to
B983 REPAIR ROOFING AND PAINT EXTERIOR WALL AT THE U. S. NAVAL AIR FACILITY (NAF) ATSUGI, JAPAN
Solicitation number
N4008422B8001
Issued by

About this file

This document provides an amendment to a federal contract specification for roof repair and exterior painting at the U.S. Naval Air Facility in Atsugi, Japan. The amendment updates the project term and related contract periods to allow 270 calendar days for preparation and submittals for any new bidders who would not have base access at award. It also adds language allowing the Contracting Officer to direct alternate completion times and extends the contract performance period from 180 to 360 calendar days. The related solicitation seeks bids to repair the roofing system, including new sheet waterproofing on an existing folded metal roof, repair of gutters and downspouts, and paint the exterior walls of a concrete and metal structure at NAF Atsugi, Japan. The project scope includes material sampling for asbestos and lead and their removal if found. The estimated value of the construction project is between 50 to 100 million yen. Bidders must be authorized and licensed to operate as contractors in Japan and comply with all local laws and regulations.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

eProject No. 1143433 AMENDMENT NO. 0001 Page 1 of 3

NAVFAC

SPECIFICATION NO.

eProject No. 1635281

PRA21.E3 K. SUEHARA

AMENDMENT NO. 0003

DATE: 7 JULY 2022

The purposes of this amendment are;

1) To update the project term and the related periods required in the contract so as new bidder who would have no gate access to enter the NAF Atsugi at the award of the contract to allow sufficient lead time for preparation of the pass and required submittals.

CONTENTS:

DOCUMENT*5

SECTION, PARA.,

ITEM NUM. PAGE*1 LINE*2

DESCRIPTION

(updates with Amendment No. 0003)

DOCUMENT 00 22 13.00 33 (for Rev. A)

PARA. 1.2 item c. 2 5 Changed the number of calendar days from 90 to 270.

SPECIFICATION:

SECTION, PARA.,

ITEM NUM. PAGE*1 LINE*2

DESCRIPTION

(updates with Amendment No. 0001)

SECTION 01 11 00.00 33 (for Rev. A)

PARA. 1.2.2.1.3 3 13-14 Added verbiage, “, unless otherwise directed by the Contracting Officer” in the last sentence.

PARA. 1.4.1 5 2 Changed the number of calendar days from 180 to 360.

Note:

*1 PAGE number indicates the number of page with the original task order specification.

*2 LINE number indicates an accumulated line number from the top of the related paragraph, not of the page.

*3 Not only revised portions affected by the amendment, but also as well as the pages for PARA. 2 and PARA. 3 are marked with “Rev. A” in those footer even with no update on those pages.

*4 Reference Drawings are formally contained in RFI Part 6, while the material distributed as an independent PDF file for the sake of expediency.

B983 REPAIR ROOFING AND PAINT EXTERIOR WALL

At the

U.S. NAVAL AIR FACILITY, ATSUGI, JAPAN

eProject No. 1143433 AMENDMENT NO. 0001 Page 2 of 3

*5 DOCUMENT 00 22 13.00 33 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS is provided as independent document for solicitation from the contract specification.

APPROVED BY:

Project Engineer:

Project Management and Engineering Branch Manager:

K. SUEHARA B. YADAO

Date 7 July 2022 Date 7 July 2022

File details come from the government source that posted it. Updated .