Attachment3_SupplementaryInstructions(eP1635281).pdf
PDF 92 KB Posted
- Attached to
- B983 REPAIR ROOFING AND PAINT EXTERIOR WALL AT THE U. S. NAVAL AIR FACILITY (NAF) ATSUGI, JAPAN
- Solicitation number
- N4008422B8001
About this file
This solicitation seeks proposals for repair roofing and painting of the exterior wall at Building 983 located at the U.S. Naval Air Facility in Atsugi, Japan. The scope of work involves repairing the existing folded metal roof, including new sheet waterproofing, repairing gutters and downspouts, and removing damaged exterior paint before repainting. Material sampling and asbestos and lead abatement are also included. Offerors must be authorized and licensed to operate and conduct business in Japan. The contract value is estimated between 50 to 100 million Yen. Proposals are due by the date specified in the solicitation, with award anticipated within 60 days thereafter pending results of material sampling for asbestos. The base item award will include all work except optional asbestos abatement if sampling confirms its presence. Pricing must be provided separately for the base item and optional item to allow for this contingency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008422B8001-A4.pdf | ||
| Attachment9b_D00_22_1300_33_SupplementaryInstructionstoBidders.pdf | ||
| Attachment9_Amend-0003_Summary.pdf | ||
| N4008422B8001-A3.pdf | ||
| Attachment9a_S01_11_0000_33_SummaryofWork.pdf | ||
| N4008422B8001-A2.pdf | ||
| N4008422B8001-A1.pdf | ||
| Attachment8_ReferencePhoto.pdf | ||
| Attachment4_InformationSecurity.pdf | ||
| N4008422B8001.pdf | ||
| Attachment6_SiteVisitRequestForm.xlsx | XLSX spreadsheet | |
| Attachment7_PreBidInquiryForm.xlsx | XLSX spreadsheet | |
| Attachment5_OPSECGuidance.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B983 Repair Roofing and Paint Exterior Wall, U.S. Naval Air Facility, Atsugi, Japan eProject No. 1635281
CUI//FEDCON[when filled in]
Source Selection Information--See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON[when filled in]
SECTION 00 22 13.00 33 Page 1
DOCUMENT 00 22 13.00 33
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
06/21
PART 1 GENERAL
1.1 LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide lump sum price for each of the following line items:
Base Bid: Price includes the following:
Provide Base Item price for the work at Bldg. No. 983 in accordance with the contract drawings and the specification.
LINE ITEM DESCRIPTION
TOTAL PRICE FOR
Base Item
Base Item All Construction Work except Option Item. The work includes following items:
a. Abatement of asbestos containing material (ACM) and lead based paint (LBP) at existing and assumed locations
b. Sampling and analysis for ACM existence at exterior wall paint including putty and mortar
• Additional Notes for Base Item:
a. A cost for removal of exterior wall paint which will accrue whether or not ACM existence is confirmed as the result of the work item “b,” must be included in Base Item.
Option Bid: Price includes the following:
Provide Option Item price for the work at Bldg. No. 983 in accordance with the contract drawings and the specification. Option Item is only applicable if an existence of ACM is confirmed as the result of the work item “b” in Base Item.
LINE ITEM DESCRIPTION
TOTAL PRICE FOR
Option Item
Option Item Abatement of ACM at exterior wall paint including putty and mortar
B983 Repair Roofing and Paint Exterior Wall, U.S. Naval Air Facility, Atsugi, Japan eProject No. 1635281
CUI//FEDCON[when filled in]
CUI//FEDCON[when filled in]
SECTION 00 22 13.00 33 Page 2
• Additional Note for Option Item:
a. A price for Option Item must consist of cost items particular for
Option Item, and must not include any cost required for general ACM abatement work which must be estimated in Base Item.
b. Option Item must not include the cost that must have been estimated for removal of exterior wall paint in Base Item but only include additional cost accruing from abatement work of ACM for exterior wall paint including putty and mortar in case that an ACM existence is confirmed as the result of the work item “b” in Base Item.
1.2 GENERAL BID NOTES
a. Award will be made for Base Item and Option Item. Enter Base Price and Option Price in designated spaces provided.
b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
c. The Government reserves the right to award or not award the Option Item within 60 calendar days after the award of Base Item pending the result of sampling and analysis for ACM existence. ACM sampling and analysis result must be made available within 45 calendar days after the award of Base Item.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
| PART 1 GENERAL |
| 1.1 LINE ITEMS |
| 1.2 GENERAL BID NOTES |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |