Encl(2)_PWS_Replacement_Pages_A0001.pdf
PDF 831 KB Posted
- Solicitation number
- N4008420B5402
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Encl(2)_3_English_DS_MSDS_Test_Foam.pdf | ||
| 20B5402_A0005.pdf | ||
| Encl(1)_Government_Response_A0005.pdf | ||
| 20B5402_A0004.pdf | ||
| Encl(2)_Amendment_List_A0004.pdf | ||
| Encl(1)_PWS_Replacement_Pages_A0004.pdf | ||
| Atch(2)_J-0200000-16_ELINs_A0004.xlsx | XLSX spreadsheet | |
| Encl(1)_Government_Response_A0003.pdf | ||
| 20B5402_A0003.pdf | ||
| 20B5402_A0002.pdf | ||
| Encl(1)_Goverment_Response_A0002.pdf | ||
| Encl(1)_Government_Response_A0001.pdf | ||
| Encl(3)_Amendment_Llist_A0001.pdf | ||
| 20B5402_A0001.pdf | ||
| 20B5402_SF1449.pdf | ||
| Atch(2)_J-0200000-16_ELINs.xlsx | XLSX spreadsheet | |
| Atch(4)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Atch(3)_1-Day_Official_Entry-Exit_Request.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A0001
0200000 - Management and Administration
Spec Item Title Description provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-
Furnished
Materials (GFM)
The Government will provide the following materials to the Contractor.
1. Engine fuel for fire pumps and smoke exhaust systems: as required
Refer to Spec Item 3.3.2 of Annex 15 for the work requirement.
2. Internet Protocol Digital Alarm Communicator/Transmitter (IPDACT) components: when assembling of the components is required.
Refer to Spec Item 4.1 of Annex 15 for the work requirement.
3. Mil-spec Aqueous Film-Forming Foam (AFFF) Concentrate: as required after applicable discharge test performed by the Contractor.
Refer to Spec Items 3.2 and 4.3 of Annex 15 for the work requirement.
2.4.4 Government-
Furnished
Equipment (GFE)
None
2.4.5 Government-
Furnished Services
(GFS)
None
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO or the COR may inspect
Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite.
Energy efficient tools and equipment shall be used when available. The KO or the COR may at any time require Samples, Safety Data Sheets (SDS) or
Manufacturer’s Data Cut Sheets of Materials used in this contract. Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials shall be submitted per Section F when required.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the bilingual (English/Japanese) capability to receive, prioritize, correspond, and respond to service orders and task orders during Government regular working hours and provide a point of contact
(POC) at a local or toll free number who can perform the above function during other than Government regular working hours.
The work reception shall be available 24 hours a day, seven days a week, including Federal and Japanese holidays, to receive and respond to emergency and urgent service orders. Requirements of services orders are specified in Spec Items 3.1 of 1502000.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and
1502000 – Facility Investment
Spec
Item
Title Performance
Objective
Related Information Performance
Standard
The PM program inventories are provided in J-1502000-03 and J-1502000-06. As indicated in J-1502000-03, the underground piping at the
Housing Area on Main Base, at
Atago Hills, and at Atago
Sports Complex is excluded from the PM requirement.
The Contractor shall develop, update, and submit the FP
Systems Inventory List per
Section F.
The Contractor shall submit a monthly PM work schedule per
Section F.
The Contractor shall notify facility occupants, Emergency
Dispatch Center (EDC), and any other activities involved prior to performing any inspection, testing and maintenance (ITM).
The Contractor shall submit an
ITM report per Section F.
3.2.1 Fire Protection
Systems
The Contractor shall perform maintenance on fire protection systems to ensure safe, reliable, uninterrupted fire protection service.
The Contractor shall maintain, inspect, and test fire protection systems in accordance with
UFC 3-601-02.
For family housing units, ITM shall be performed in accordance with Chapter 32, MILITARY FAMILY
HOUSING FACILITY
SYSTEMS, of the UFC.
However, ITM for initiating devices installed in each housing unit the tasks required as part of change of occupancy shall be performed annually, instead of every two years, in this contract.
The list of buildings with
Unmonitored Control Panels and/or Annunciator Equipment, which shall be inspected monthly in accordance with the
Maintenance is performed in accordance with
Contractor's PM program and work schedule.
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
SERVICE ORDER Any work required to return a facility, system, equipment or component to normal working condition. Service orders are minor facility problem requests or requests for other non-recurring work that is too small to be planned and estimated.
The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.
SERVICE ORDER CYCLE Count down starts when the customer is notified that the work has been accepted to be accomplished to the time when the work chit is turned in by the craftsmen as complete is one complete cycle period for a service order.
SERVICE ORDER,
EMERGENCY
Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems.
SERVICE ORDER, URGENT Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system.
SERVICE ORDER, ROUTINE Routine is defined as any work requirement within the defined limit of liability (LOL) that does not qualify as emergency or urgent.
WEIGHT HANDLING
EQUIPMENT (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment
(e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
* Refer to J-0200000-01 for more definitions and acronyms.
Acronym Title
AFFF Aqueous Film-Forming Foam
AST Aboveground Storage Tank
EDC Emergency Dispatch Center
FACP Fire Alarm Control Panel
FI Facility Investment
FP Fire Protection
IPDACT Internet Protocol Digital Alarm Communicator/Transmitter
ITM Inspection, Testing and Maintenance
LOL Limit of Liability
MCAS Marine Corps Air Station
Mil-Spec Military Specification
NFPA National Fire Protection Association
OEM Original Equipment Manufacturer
OJT On the Job Training
PM Preventive Maintenance
PWS Performance Work Statement
SRM Sustainment, Restoration and Modernization
UFC Unified Facilities Criteria
UPS Uninterruptible Power Supply
VTE Vertical Transportation Equipment
ATTACHMENT J-1502000-13
HISTORICAL VTE CERTIFICATION SUPPORT WORK SCHEDULE
UNCLASSIFIED/FOR OFFICIAL USE ONLY
As of May 2019
1 2 3 4 5 6
Activating SD
Except 1st floor lobby
Activating SD
1st floor lobby
Activating SD
MR
(Hoistway)
Other SD not in
ELV lobby
Activate Flow
Switch & Verify
Shunt Trip
Fire Shutter
Relay with SD
1 0727P
2 5500P
3 7030P
4 1120P
5 1121P
6 1122P
7 1501P1
8 1501P2
9 1502P1
10 1502P2
11 1503P
12 1702P HD HD HD
13 6020P1
14 6020P2
15 6030P1
16 6030P2
17 6500P1
18 6500P2
19 ATG200P
20 ATG400P
21 0100P
22 0607P1
23 0607P2
24 0610P
25 0615P
26 0625P1
27 0625P2
28 6300P1
29 6300P2
30 6550F
31 7005P
32 9500P1
33 9500P2
34 9590P
35 0445U
0445D
0446D
37 0001P1
38 0001P2
39 0110P1
40 0110P2
41 0110P3
42 0110P4
43 0608P1
44 0608P2
45 0656P1
46 0656P2
47 0955P1
48 0955P2
49 3410P1
50 3410P2
51 6000P1
52 6000P2
Inspection Order
No. Bldg. # Inspection month
OCT
NOV
DEC
JAN
ATTACHMENT J-1502000-13
HISTORICAL VTE CERTIFICATION SUPPORT WORK SCHEDULE
UNCLASSIFIED/FOR OFFICIAL USE ONLY
1 2 3 4 5 6
Activating SD
Except 1st floor lobby
Activating SD
1st floor lobby
Activating SD
MR
(Hoistway)
Other SD not in
ELV lobby
Activate Flow
Switch & Verify
Shunt Trip
Fire Shutter
Relay with SD
53 0589P1
54 0589P2
55 0655P1
56 0655P2
57 1200P1
58 1200P2
59 1565P
60 1601P1
61 1601P2
62 1602P1
63 1602P2
64 7050P
65 0104F
66 0733P1
67 0733P2
68 0128P
69 0411P
70 0447P
71 0447F
72 0600P1
73 0600P2
74 0600F
75 0721P
76 1600P1
77 1600P2
78 7010P1
79 7010P2
80 7020P1
81 7020P2
82 1123P1
83 1123P2
84 1123P3
85 445P1
86 445P2
87 445F
88 7000P
89 9550P
90 9553P
91 9555P
92 9556P
93 9595P
94 0906P1
95 0906P2
96 1770P
97 5119P
98 5200P
99 5777P
100 5780P
* SD = smoke detector, MR = machine room, ELV = elevator, HD = heat detector
Items to be tested
Not applicable
Note: Bldgs. 1209, 1210, 657 and 658 are scheduled to be added to this list in the near future.
FEB
AUG
SEP
MAR
APR
MAY
JUN
JUL
No.
Inspection month Bldg. #
Inspection Order
| SPEC_ALL_Fire_Protection_A0001_No.1 |
| SPEC_ALL_Fire_Protection_A0001_No.2 |
| SPEC_ALL_Fire_Protection_A0001_No.3 |
| SPEC_ALL_Fire_Protection_A0001_No.4 |
File details come from the government source that posted it. Updated .