Encl(1)_PWS_Replacement_Pages_A0004.pdf
PDF 869 KB Posted
- Solicitation number
- N4008420B5402
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Encl(2)_3_English_DS_MSDS_Test_Foam.pdf | ||
| 20B5402_A0005.pdf | ||
| Encl(1)_Government_Response_A0005.pdf | ||
| 20B5402_A0004.pdf | ||
| Encl(2)_Amendment_List_A0004.pdf | ||
| Atch(2)_J-0200000-16_ELINs_A0004.xlsx | XLSX spreadsheet | |
| Encl(1)_Government_Response_A0003.pdf | ||
| 20B5402_A0003.pdf | ||
| 20B5402_A0002.pdf | ||
| Encl(1)_Goverment_Response_A0002.pdf | ||
| Encl(1)_Government_Response_A0001.pdf | ||
| Encl(3)_Amendment_Llist_A0001.pdf | ||
| Encl(2)_PWS_Replacement_Pages_A0001.pdf | ||
| 20B5402_A0001.pdf | ||
| 20B5402_SF1449.pdf | ||
| Atch(2)_J-0200000-16_ELINs.xlsx | XLSX spreadsheet | |
| Atch(4)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Atch(3)_1-Day_Official_Entry-Exit_Request.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A0004
1502000 – Facility Investment
Spec
Item
Title Performance
Objective
Related Information Performance
Standard
3.3.6 Training for
Government
Personnel
The Contractor shall provide trainings on foam fire extinguishing systems to ensure the system users are familiar with the systems and understand how to respond in case of an emergency.
The Contractor shall provide two types of trainings on foam fire extinguishing systems using AFFF; one for Operations
Department Fire and
Emergency Services (FES) personnel and one for building users.
The requirements of each training are as follows:
1. FES Training
The Contractor shall provide an annual, in-depth, hands-on training on the grate nozzle foam systems to FES personnel at a location designated by the
Fire Department.
Due to the two shifts the Fire
Department employs, the same training shall be conducted twice each year.
The training shall include, at a minimum, the following contents:
detailed descriptions of the system, full operation of the system, operations of switches and valves for emergency shutoff, and spill response procedures to take, etc.
Personnel from Environmental
Branch shall be invited to the training.
This training shall be conducted in conjunction with the nozzle operability verification test, which is to be performed every two years in accordance with
UFC 3-601-02, so that the trainees can actually see the system operating. In the year the operability test is not required, the Contractor shall plan the training appropriately.
In the base period, this training shall be conducted as soon as possible after contract award and the Contractor shall arrange
Trainings are provided at designated locations at the specified frequencies.
1502000 – Facility Investment
Spec
Item
Title Performance
Objective
Related Information Performance
Standard the nozzle operability test accordingly.
2. Building User Training
The Contractor shall provide basic trainings on foam fire extinguishing systems to users of the buildings where those systems are installed. The types of the foam systems and the locations where the trainings are to be conducted are listed in J-1502000-14.
These trainings shall be provided at each location semiannually in the first two years of the contract (base and
1st option periods).
This training may be brief but shall include, at a minimum, the following contents:
what the main components are, brief description of how the system works, and how to shut down and start the system in an emergency.
The Contractor shall ensure a fire inspector from the Fire
Department attends each training and make best efforts to invite representatives from every end user of the system.
The Contractor shall prepare and provide a one-page layout on the details of the system for each training.
Both types of trainings shall be provided in English. Japanese translation may be required as necessary.
The Contractor shall develop and submit training plans for both FES Training and
Building User Trainings per
Section F.
After each training, a training report shall be submitted per
Section F.
DELIVERABLES
Annex/
Spec
Item
Form
Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency
Original
/ Copies
Number of Copies
(including original)
1502000/
3.2
N/A
Recommendation
Report Refer to Spec Item 3.1.
1502000/
3.2
N/A Monthly PM Work
Schedule
Seven calendar days prior to the beginning of each month; For changes, seven calendar days prior to the originally scheduled or the rescheduled date
KO or
COR
1 Monthly, and as required
1502000/
3.2
N/A
ITM Report Within 14 calendar days after completion of each contract period, and within seven calendar days after Government request.
KO or
COR
1 Annually and as requested
1502000/
3.3.1
N/A Event Support
Summary Report
By the end of each contract period
KO or
COR
1 Annually
1502000/
3.3.2
N/A Fuel Delivery
Support Summary
Report
By the end of each contract period and within five working days of Government request
KO or
COR
1 Annually, and as requested
1502000/
3.3.3
J-1502000-12 Monthly AST
Inspection Sheet
Within the first seven calendar days of each month
ENV
via FSC
1 Monthly
1502000/
3.3.6
N/A Training Plans At least 14 calendar days prior to the scheduled training
KO or
COR
1 Annually
1502000/
3.3.6
N/A Training Report Within 14 calendar days after each training
KO or
COR
1 As specified
Note: When the distribution is to “KO or COR,” the primal recipient shall be COR unless otherwise notified.
Annex/Spec Item: 1502000/3.3.6
Deliverables Form Preparation Instructions
Deliverable Title: Training Plans
Form Attachment No.: N/A Government Approval Required: __Yes X No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
1. Required File Format: The Training Plans shall be prepared using a form that the Contractor considers appropriate.
2. Method of Submission: Via email (in PDF format).
3. Purpose: For Government acceptance
4. Distribution List: KO or COR
If the KO or the COR accepts the training plans, the Government will notify the Contractor of Government acceptance.
If the KO or the COR responds with comments, then incorporate the Government’s comments and resubmit the plans via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
5. Content: The Contractor shall include, at a minimum, the following information in each plan:
Contractor number and title
Contractor’s name
Type of Training (FES Training or Building User Training)
Date and time of Training
Location of Training
Trainer’s name
Interpreter’s name, if applicable
Contents of the training
6. Other Requirement:
The schedule for the FES Training shall be coordinated with the POC from the Fire
Department.
The schedules for Building User Trainings shall be coordinated with all appropriate
Government personnel.
The FES Training shall be conducted in conjunction with the nozzle operability verification test (when applicable).
If the same training plan is used for multiple buildings, only one plan may be submitted for those buildings. (Include all building numbers in the plan.)
The submitted training plans shall accurately reflect its intended use.
7. Due Dates: The training plans shall be submitted at least 14 calendar days prior to the planned trainings.
Annex/Spec Item: 1502000/3.3.6
Deliverables Form Preparation Instructions
Deliverable Title: Training Report
Form Attachment No.: N/A Government Approval Required: __Yes X No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
1. Required File Format: The Training Report shall be prepared using a form that the Contractor considers appropriate.
2. Method of Submission: Via email (in PDF format).
3. Purpose: For Government acceptance
4. Distribution List: KO or COR
If the KO or the COR accepts the training report, the Government will notify the Contractor of Government acceptance.
If the KO or the COR responds with comments, then incorporate the Government’s comments and resubmit the report via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
5. Content: The Contractor shall include, at a minimum, the following information in the report:
Contractor number and title
Contractor’s name
Date and time of Training
Location of Training
The Fire Extinguishing System installed at the Location
Trainer’s name
Interpreter’s name, if applicable
Attendees’ names
Contents of the training
The one-page informational sheet distributed in the training
6. Other Requirement:
The submitted training report shall accurately reflect its intended use.
7. Due Dates: The training report shall be submitted at least 14 calendar days after the training is conducted.
A715 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
LS 1 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 11 - 15 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A716 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
LS 1 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 16 - 20 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A717 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
LS 1 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 21 - 25 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A718 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
LS 1 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 26 - 30 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A719 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
LS 1 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 31 - 35 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A720 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
LS 1 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 36 - 40 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A721 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
LS 1 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 41 - 45 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A722 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
LS 1 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 46 - 50 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A723 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
LS 1 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 51 - 55 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
A724 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
TM 1 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
The Contractor shall provide an in-depth, hands-on training on the grate nozzle foam system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the in-depth training (FES Training).
1 ¥ -
A725 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
TM 1 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
The Contractor shall provide a basic training on foam fire extinguishing system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the basic training (Building User Training).
1 ¥ -
A726 Unit Priced Labor Work - MUST BE
NEGOTIATED BY KO
A726 AA Maintenance Technician, Regular Hours
HR 1 Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 ¥ -
A726 AB Journeyman Maintenance Technician, Regular Hours
HR 1 Journeyman Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 ¥ -
Unit Priced Labor (UPL) Work
TOTAL of A726AA through A726AM
B715 Transport 11 to 15 containers of AFFF
LS 1 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 11 - 15 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B716 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
LS 1 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 16 - 20 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B717 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
LS 1 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 21 - 25 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B718 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
LS 1 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 26 - 30 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B719 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
LS 1 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 31 - 35 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B720 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
LS 1 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 36 - 40 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B721 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
LS 1 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 41 - 45 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B722 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
LS 1 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 46 - 50 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B723 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
LS 1 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 51 - 55 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item 4.3.
1 ¥ -
B724 Provide In-depth Training to
Government personnel on Grate Nozzle
Foam System
TM 1 Provide In-depth Training to
Government personnel on Grate Nozzle
Foam System
The Contractor shall provide an in-depth, hands-on training on the grate nozzle foam system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the in-depth training (FES Training).
1 ¥ -
B725 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
TM 1 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
The Contractor shall provide a basic training on foam fire extinguishing system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the basic training (Building User Training).
1 ¥ -
B726 Unit Priced Labor Work - MUST BE
NEGOTIATED BY KO -¥
B726 AA
Maintenance Technician, Regular Hours
HR
Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 -¥
B726 AB
Journeyman Maintenance Technician, Regular Hours
HR
Journeyman Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 -¥
Unit Priced Labor (UPL) Work
TOTAL of B726AA through B726AM
C714 Transport 6 to 10 containers of AFFF
LS 1 Transport 6 to 10 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 6 - 10 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C715 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
LS 1 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 11 - 15 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C716 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
LS 1 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 16 - 20 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C717 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
LS 1 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 21 - 25 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C718 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
LS 1 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 26 - 30 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C719 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
LS 1 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 31 - 35 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C720 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
LS 1 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 36 - 40 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C721 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
LS 1 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 41 - 45 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C722 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
LS 1 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 46 - 50 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C723 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
LS 1 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 51 - 55 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
C724 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
TM 1 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
The Contractor shall provide an in-depth, hands-on training on the grate nozzle foam system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the in-depth training (FES Training).
1 ¥ -
C725 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
TM 1 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
The Contractor shall provide a basic training on foam fire extinguishing system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the basic training (Building User Training).
1 ¥ -
C726 Unit Priced Labor Work - MUST BE
NEGOTIATED BY KO -¥
C726 AA
Maintenance Technician, Regular Hours
HR
Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 -¥
Unit Priced Labor (UPL) Work
TOTAL of C726AA through C726AM
D714 Transport 6 to 10 containers of AFFF
LS 1 Transport 6 to 10 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 6 - 10 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D715 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
LS 1 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 11 - 15 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D716 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
LS 1 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 16 - 20 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D717 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
LS 1 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 21 - 25 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D718 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
LS 1 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 26 - 30 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D719 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
LS 1 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 31 - 35 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D720 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
LS 1 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 36 - 40 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D721 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
LS 1 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 41 - 45 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D722 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
LS 1 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 46 - 50 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D723 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
LS 1 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 51 - 55 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
D724 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
TM 1 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
The Contractor shall provide an in-depth, hands-on training on the grate nozzle foam system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the in-depth training (FES Training).
1 ¥ -
D725 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
TM 1 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
The Contractor shall provide a basic training on foam fire extinguishing system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the basic training (Building User Training).
1 ¥ -
D726 Unit Priced Labor Work - MUST BE
NEGOTIATED BY KO -¥
D726 AA Maintenance Technician, Regular Hours
HR
Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 -¥
Unit Priced Labor (UPL) Work
TOTAL of D726AA through D726AM
E714 Transport 6 to 10 containers of AFFF
LS 1 Transport 6 to 10 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 6 - 10 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E715 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
LS 1 Transport 11 to 15 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 11 - 15 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E716 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
LS 1 Transport 16 to 20 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 16 - 20 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E717 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
LS 1 Transport 21 to 25 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 21 - 25 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E718 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
LS 1 Transport 26 to 30 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 26 - 30 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E719 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
LS 1 Transport 31 to 35 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 31 - 35 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E720 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
LS 1 Transport 36 to 40 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 36 - 40 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E721 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
LS 1 Transport 41 to 45 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 41 - 45 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E722 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
LS 1 Transport 46 to 50 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 46 - 50 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E723 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
LS 1 Transport 51 to 55 containers of AFFF concentrate and Refill Tank
The Contractor shall transport 51 - 55 containers of AFFF to the designated site and refill the tank with the concentrate and properly dispose of the emptied containers per Spec Item
4.3.
1 ¥ -
E724 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
TM 1 Provide In-depth Training to
Government personnel on Grate
Nozzle Foam System
The Contractor shall provide an in-depth, hands-on training on the grate nozzle foam system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the in-depth training (FES Training).
1 ¥ -
E725 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
TM 1 Provide Basic Training to Government personnel on Foam Fire Extinguishing
System
The Contractor shall provide a basic training on foam fire extinguishing system to Government personnel at a designated location. Refer to Spec Item 3.3.6 of the requirements of the basic training (Building User Training).
1 ¥ -
E726 Unit Priced Labor Work - MUST BE
NEGOTIATED BY KO -¥
E726 AA
Maintenance Technician, Regular Hours
HR
Maintenance Technician, Regular Hours
Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order.
200 -¥
Unit Priced Labor (UPL) Work
TOTAL of E726AA through E726AM
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
J-1502000-01 Definitions and Acronyms
J-1502000-02 References and Technical Documents
J-1502000-03 Facilities Inventory
J-1502000-04 Buildings Under Warranty
J-1502000-05 Site Maps
J-1502000-06 Fire Alarm Network Systems and Related Information
J-1502000-07 Replaced Parts Historical Data
J-1502000-08 Historical Service Order Workload
J-1502000-09 Reserved
J-1502000-10 Historical Government Event Support Work
J-1502000-11 Historical Fuel Delivery Support Work for Fire Pumps
J-1502000-12 Sample AST Inspection Sheet
J-1502000-13 Historical VTE Certification Support Work Schedule
J-1502000-14 Building User Training Locations
ATTACHMENT NUMBER ATTACHMENT TITLE
ATTACHMENT J-1502000-14
BUILDING USER TRAINING LOCATIONS
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Building User Trainings shall be provided at the following locations.
1) Low-Expansion Foam Systems for Flammable Liquid Tanks
Bldg. # Facility
1 176 Fuel Pump Room 2 1705F Boiler Plant 3 1707 Generator Facility 4 6050 Boiler Plant
2) Foam Spray and Sprinkler Systems
1 127 Motor T 2 130 Maintenance Transport Building 3 1031 Hazwaste Storage and Transfer Facility 4 1645 Hazmat Center
3) Grate Nozzle Foam Systems
1 721 Joint Maintenance Hangar 2 2700 Corrosion Control Hangar 3 5200 VMGR-152 Hangar 4 5300AB Corrosion Control Hangar 5 5500 FRCWP Hangar 6 6020AB MAG-12 Hangar 7 6030AB MAG-12 Dual Maintenance Hangar 8 6745 Hush House (Navy) 9 6746 Hush House (Joint) 10 7010AB CVW-5 Maintenance Hangar 11 7020AB CVW-5 Maintenance Hangar 12 7030 CVW-5 Aircraft Hangar
| 0. SPEC coversheet - Fire Protection_signed_by_PW2_(PRINTED) |
| 1. 0100000 C - Fire Protection |
| 2. 0200000 C - Fire Protection_A0001 |
| 3. 1502000 C -Fire Protection_A0004 |
| 4. 0200000 F - Fire Protection |
| 5. 1502000 F -Fire Protection_A0004 |
| 6. 0200000 J - Fire Protection_A0004 |
| 7. 1502000 J - Fire Protection_A0004 |
| J-1502000-05 SITE MAPS op.pdf |
| J-1502000-03 Installation Map |
| J-1502000-03 Map with Highlights |
| J-1502000-03 SOFU map |
| J-1502000-08 SO Historical Data (COVER needs to be added)_REV.pdf |
| BASE -STATION |
| BASE -FH |
| BASE -DoDEA |
| BASE -DeCA M&C |
| 1st -STATION |
| 1st -FH |
| 1st -Others |
| 2nd -STATION |
| 2nd -FH |
| 2nd -DoDEA |
| 2nd -DeCA M&C |
| 3rd -STATION |
| 3rd -FH |
| 3rd -Others |
| 2-1. J-1502000-03-1 Inventory List_STATION.pdf |
| 2-1. J-1502000-03-1 Inventory List_STATION_PART1_(1-1615) |
| 2-1. J-1502000-03-1 Inventory List_STATION_PART1_(1645-SOFU) |
File details come from the government source that posted it. Updated .