SECTION F (Revised)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment__0003.pdf | ||
| ELINS.xls | XLS spreadsheet | |
| Section_F__RFP.pdf | ||
| Amendment__0002.pdf | ||
| Pre-Proposal_Inquiry_Amend__0002.pdf | ||
| AMENDMENT_0001.pdf | ||
| Attendee_List.pdf | ||
| Pre-Proposal_Inquiry.pdf | ||
| Safety_Talking_Points.pdf | ||
| Financial_Responsibility.pdf | ||
| Section_C_-_Miramar__Final_.pdf | ||
| WD_05-2057(Rev.-14).pdf | ||
| SF_33_RFP.pdf | ||
| Section_J_-_Miramar__Final_.pdf | ||
| PPQ.pdf | ||
| ELINS.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F Contract # N40083-13-R-1023
Marine Reserve Facilities at MCAS Miramar
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original / Copies
Number of Copies
(including original)
1502000 – Facility Investment 1502000/ 2.2.1
N/A
Certification and Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested 1502000/ 3.1
N/A Trouble Call Summary Report
First work day of each month
KO
FSCM
2 Monthly
1502000/ 3.2
Preventive Maintenance Program Plan
30 calendar days after contract award
KO
FSCM
2 Annually
1502000/ 3.2
N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month
KO
FSCM
2 Monthly
1502000/ 3.3
Inspection, Testing, and Certification Program Summary Report
First work day of each month
KO
FSCM
2 Monthly
1502000/ 3.3
Inspection, Testing and Certification Schedule and Equipment Certifications
First work day of each month
KO
FSCM
2 Monthly
1502000/ 3.3.4
Certification of Load Test and Condition Inspection Form
First work day of each month
KO
FSCM
2 Monthly
1502000/ 3.3.4
Inspection and Test Report for Vertical Transportation Equipment/Vehicle Lifts
First work day of each month
KO
FSCM
2 Monthly
1503010 - Custodial 1503010/ 3.1
N/A Annual Work Schedule
Annually KO
FSCM
2 Within 15 days after award and annually thereafter
1503010/ 3.1
N/A Monthly Work Plan First work day of each month
KO
FSCM
2 Monthly
1503020 – Pest Control 1503020/ 2.2.1
N/A Copy of State Certification for Contractor Personnel
15 calendar days prior to start of work. Copies of renewed certifications shall also be submitted.
KO 1 As required
1503020/ 2.3.1
N/A Copy of Local/State Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO 1 1 per state
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits.
KO 1 As required
1503020/ 2.3.5
J-1503020-03 Planned Pesticide Use Sheets including Pesticide Labels and Material Safety Data Sheets
(MSDS)
Within 30 days of Award. Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO
FSCM
2 1 for each pesticide per pest as required
1503020/
N/A Contractor's Work Plan
Within 30 days of Award.
KO
FSCM
2 Annually
1503020/ 2.3.12
J-1503020-03 Report of Pest Management Operations
Electronically within 1 day of each pest management operation.
NOPRS 1 As required
1503030 – Integrated Solid Waste Management 1503030 / 3.1
N/A Solid Waste Collection Schedule
As specified KO
FSCM
2 15 days after award and Annually after