This document is an amendment to Solicitation N4008024R2227 for the renovation of Building 154 at the Naval Support Facility in Indian Head, Maryland. The key changes in this amendment are:

  1. Extending the proposal due date to Tuesday, August 6, 2024 by 2PM ET.
  2. Providing a revised Price Proposal Form (Attachment F).
  3. Providing responses to Pre-Proposal Inquiries (PPI) and associated attachments, including an Environmental Site Survey, a Hazardous Materials Report, and documents related to the use of Buildings 135 and 1924 for explosive-related activities.

The solicitation is for an Indefinite Delivery Quantity (IDQ) contract, open to holders of the specified MACC contracts. The government has not provided a specific estimated budget, but notes that a Project Labor Agreement is required for projects over $35 million. Responses to various technical questions about the drawings and specifications are also included.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

R

PAGE OF PAGES

1 10

3 2. AMENDMENT/MODIFICATION

EFFECTIVE DATE

17-Jul-2024

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE N40080 7. ADMINISTERED BY (If other than item 6) CODE

NAVAL FACILITIES ENGINEERING SYS COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

See Item 6

8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION

NO. N4008024R2227

X 9B. DATED (SEE ITEM

11) 18-June-2024

10A. MOD. OF CONT RACT /ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILIT Y CODE

11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICIT AT IONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. T HIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACT S/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) T HE CHANGES SET FORT H IN ITEM 14 ARE MADE IN T HE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT T HE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INT O PURSUANT TO AUT HORIT Y OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40080-24-R-2227 Renovate Building 154, Naval Support Facility, Indian Head, Maryland.

Please see SF30 Continuation Page

CONTINUED ON PAGE 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACT ING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPT ION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

X

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text: AMENDMENT 0003

The purpose for this Amendment is to:

1.Extend Proposal due date to Tuesday, 06 August 2024 by 2PM(ET)

2.Provide revised Price Proposal Form (Attachment F)

3.Provide PPI Responses and the following attachments:

Attachment_Q14_AmendESS_FINAL-Clean_V6_05102023_Redacted.pdf Attachment_Q14_ESS_Trans_Ltr_IH_BLDG_28_154_164_RENO_Amnd1_20231016_1158.pdf ATTACHMENT_Q31_154 Basis of Design - IFC Submission - HAZMAT Report.pdf deanna.d.ward Cross-Out

SOLICITATION NO.:

N4008024R2227 PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para.

1 06.20.2024 17-May Sections 1, 2, and 3

Paragraph Numbers 1, 2, and 3

The RFP seems to be mixing a single-step and two-step procurement process.

A.. Please confirm that this project is being procured in two steps and that the price proposal is not due on July 23, 2024. If this is correct, please provide an approximate date for the price proposal submission.

B. Per the RFP, RFIs are currently due on July 9, 2024 and the Step 1 Non-Price Factor proposal is due on July 23, 2024. The site visit is scheduled for June 27th and the RFP indicates that this will be the only site visit. Please confirm that a second RFI period will be established following the Step 1 submission?

See Amendment 0002 and 0003. This is now a single phase procurement. Propsals are due Tuesday, 06 August 2024.

2 6/24/2024 Pages 7-8 Solicitation Section I.

Based on the Solicitaion, in Phase 1, NAVFAC describes they will make their evaulation from the Contractor's previous experience related to "this" MACC program. Since this MACC program is new and no awards have been made to any of the listed contractors is the Navy going to augment this requirement with added requirements for past performance? Or is it the intention that all Contractors will be allowed to go to Phase 2 based on their inclusion into the MACC program?

Furthermore, does NAVFC have an Anticipated schedule for Phase of of this solicitation?

See Amendment 0002 and 0003. This is now a single phase procurement. Propsals are due Tuesday, 06 August 2024.

3 6/28/2024

The RFP states that this a two phase proposal. The proposal due date is currently July 23, 2024. Please confirm that this due date only pertains to Phase I proposal requirements which include Past Performance only and that no pricing is due on July 23, 2024.

See Amendment 0002 and 0003. This is now a single phase procurement. Propsals are due Tuesday, 06 August 2024.

Posted on Amend No.

REFERENCEQuestion No. QUESTION GOVERNMENT RESPONSE

Date Received

July 2011

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEReceived

4 6/28/2024 Can NAVFAC please provide a due date for Phase II price proposals?

See Amendment 0002 and 0003. This is now a single phase procurement. Propsals are due Tuesday, 06 August 2024.

5 7/1/2024 5

The Soliciation says the Proposal Due date is 7/23/24. Page 7 of the solication listed I. Evaluation Factor for Award and lists a Phase I - Facotr 1 - Past Performance and Phase II - Price. It further says the procurement will be solicted in two phases and with Phase I evaluated to determine technical acceptability and those rated Acceptable for non-cost/price evaluation factors will be determined within the competitive range and only those in the competitive range shall submit a price proposal.

The solicitation then identfieis Phase I - Non- Cost/Price Evaluation Facotrs, Factor 1 - Past Performance and says Offerors do not need to provide any information under this factor but may include adverse past preformance for issues under this MACC.

1 - Please confirm when the Phase I proposals are required.

2 - Please confirm when the Government will advise if offerors are considered "Acceptable" and can submit a Price Proposal?

See Amendment 0002 and 0003. This is now a single phase procurement. Propsals are due Tuesday, 06 August 2024.

6 7/9/2024 4 RFP

The solicitation notes the Estimated Budget is $25- $100M, however, the solicitation does not include the FAR Clause 52.222-33 - Notice of Requirement for Project Labor Agreement which is required for a project over $35M. Since a PLA is not requested, please confirm the budget is less than $35M.

Bid per RFP Range of Magnitude. In accordance with (PLA FAR clause), a PLA is required for all projects estimated at $35M or greater. Please submit a PLA for any proposal estimated at $35M or above.

7 7/9/2024 5 RFP

Per the Solicitation, PPIs are due 7/9/24. Please extend this period 2 additional weeks.

PPI due date has been extended to Friday, 19 July 2024. See Amendment 0002

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEReceived

8 7/9/2024 5 RFP

The RFP is due 7/23/24, please extend the period 2 weeks to allow time for adequate pricing and PPI responses from the government.

Proposal due date has been extended to Tuesday, 06 August 2024. 0003

01 30

01.00 23 1.3 2

Section 01 30 01.00 23 references FF&E and A/V Packages for Child Development Center. Please confirm there is no Child Development Center or FF&E or A/V packages for Child Development Center in RFP.

Confirmed. There is no Child Development Center. 0003

Please provide the as-built drawings for Building 154 to coordinate the demolition and new work with the existing conditions.

7/8/2024

01 30

01.00 23 1.3 3

Please confirm contractor is to include Interior Design and A/V Design Services in the Construction Base Bid.

7/8/2024 01 30

01.00 23 1.3 3

Please provide Price Proposal Form (Bid Schedule) as referenced in section 01 30 01.00 23 that includes Government FF&E Package budget and A/V Package budget.

7/8/2024 01 30

01.00 23 1.3 3

Please provide Government FF&E Package budget and A/V Package budget for Contractors to properly price Handling and Administration Rate (HAR).

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEReceived

7/8/2024 01 11 00 1.2.1 4

Section 3.1.1 Test Borings in Executive Summary stated that a UXO representative checked for presence of unexploded ordinance during drilling of the borings. Please confirm whether the contractor must also engage a suitably licensed consulting firm to conduct anomaly avoidance and deploy a UXO technician(s) to oversee excavations. Also provide qualifications and protocols if services are to be performed by contractor.

See attached ESS, Version 6 and associated DDESB Approval Letter.

Contractor shall note the following:

(1) Use of Buildings 135 and 1924, as set forth in the ESS, will be at the discretion of the Government and require advance coordination with the Government.

(2) Contractor will be responsible for decontaminating, certifying, and disposing of any MPPEH that they generate as part of their Contract work.

(3) In the event that there is MPPEH that cannot be certified MDAS via visual inspection alone or is desirable to undergo further processing at the IWP, Government would have to evaluate and make the decision to accept that material for further processing and disposal (which might include storage at Building 135 and processing at Building 1924).

(4) Contractor's MPPEH certification and verification process for MPPEH disposition shall be outlined in their UXO plan submitted to the Government for review and approval.

(5) In accordance with the Contract specifications, Contractor shall provide records demonstrating recycling of MDAS scrap metals upon Government request.

S-111

Please confirm that the slab on grade from column line X6 to the match line is supposed to be 5" normal weight concrete with WWR 6x6 - W2.9xW2.9 like on drawing S-112, instead of "5" normal weight concrete with #4 @12 OC EW".

Confirmed. 0003

S-301

Please provide the footing and wall dimensions for detail B4.

Wall is 1'-0"wide. Wall footing is 2'-0" wide and 1'-0" thick 0003

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEReceived

CS101 &

C-505

Please provide information for the precast wall per Keynote 12 on CS101. Detail A1 on C-505 says to see the Architectural Plans but no details are provided in the Architectural Drawings. Detail A2 on S-302 shows a cut section through the precast panel but this does not align with the foundation drawings. Include all necessary information including, but not only; footing sizes and elevations, precast details, cut sections, and top of wall elevations.

The wall location from Grid XA and thickness are defined on A2/S-

302. T/wall elevations are provided in the ARCH dwgs.

S-302

Detail A1 on S-302 references the footing a retaining wall footing and to see AS/S-302 but that detail shows an existing footing. Also, it shows an concrete wall that is extending from the pier which is dissimilar to detail A2 on S-301, which shows no wall. Please clarify the details and location of detail A1 on S-302.

Arrow for retaining wall footing is pointing incorrectly and should be further left in Detail A1. It should also reference Detail A2, not Detail A3. Detail A1 shows how Detail A2 is modified (by doweling) where it abuts the new column footing.

084113 1.7 1

The paragraph ends in not a complete sentence.

Please clarify.

A-204

Window Type W-6 seems to be mislabeled on A-

204. Please confirm the correct window type.

The window type should be W-4. 0003

A-111 - A122

Please label and provide the locations for Window Types W-9 and W-11 on the architectural drawings.

None were found.

W-9 is looking at the elevation of door 101.1 (1st Floor, A1/A-111)

W-11 is looking at the elevation of door 222 (2nd Floor, A1/A-121)

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

S-302 & S- 502.

Please confirm the elevator pit slab is 1'-6" thick per detail A3 on S-502 and not 1'-0" thick per detail C4 on S-302.

Confirmed 0003

S-401

On S-401 the 24" Pier refers to detail A4/S-131 but drawing S-131 is the roofing framing plan for Sector A and does not show any details. Please clarify and provide a detail.

Tag should refer to Sheet S-315 not Sheet S-131. 0003

Provide plumbing demolition drawings.

Per Architectural Sheets, Contractor shall demolish all mechanical, electrical, plumbing, telecommunications, fire protection, and fixtures, equipment and associated appurtenances through the building to the utility connection points at the face of the exterior wall. See, for example, General Sheet Note #4 on Sheets AD110 through AD303.

First floor Sector A and Sector B mechanical plans for HVAC and piping are missing from the drawings.

Only an overall drawing for the first floor is provided but does not shown any sizes, notes, or details. Please provide these drawings.

Refer to Sheets MH411 through MH425 and MP411 through

MP425.

Provide hardware schedule for the doors. Refer to Specification Section 08 71 00. 0003

Please clarify if there is a specific coiling door manufacturer needed for this project.

No specific coiling door manufacturer is required. The coiling doors must meet the Contract specificaitons.

A-201 thru A-

From A-201 to A-204, General Sheet Note 4 says refer to A-562 for Window & Louver schedule, but there is no A-562. Please clarify if A-572 is the drawing being referenced.

Refer to Sheets A-572 and A-573. 0003

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

I-601 & A-

On I-601 Finish Material Legend, WS-1 is labeled as Mechoshade Systems Window Shades, however, there is a conflicting WS-1 label on A-560 that lists as a concrete face, insulated panel. Please clarify the labeling and where the window shades will be if needed for this project.

WS-1 on Sheet I-601 is Window Shade as noted. Remark #27 noted on Room Finish Schedules on Sheets I-602 and I-603 indicates window shade WS-1 locations. WS-1 on Sheet A-560 is not a material type but stands for Wall System-1.

A-445 & A-603

Please confirm there is only one overhead coiling door required for this project that is shown on A- 445, and listed on Door Schedule A-603.

Confirmed. 0003

028100, 028200, 08300, & 028416

Please provide a HAZMAT Report with quantities and locations of asbestos, lead, PCBs, and any other hazardous or suspected hazardous materials.

Contractor shall base their bid on the hazardous materials identified in the attached hazardous materials survey. Abatement / remediation costs for hazardous materials shall be determined based upon the proximity of identified hazardous substances and based on similar materials being potential hazardous substances.

Any Contract changes for additional costs due to hazardous material abatement / remediation will be evaluated and processed on a case-by-case basis as outlined in the Contract documents.

AD-111 &

AD-112

Please confirm all equipment, materials, loose furniture, etc. will be removed prior to the start of construction by the Owner.

Government will salvage any equipment, furniture, etc. that they want to keep prior to construction. Any equipment, furniture, etc.

remaining in the building and not required for the construction work will become property of the Contractor at the start of construction. Contractor will be responsible for removing and disposing of any such equipment, furniture, etc.

before the completion of construction as part of their final cleaning.

5 11400 1.3.4

Specification section 01 14 00 - 1.3.4 notes portion of the existing building will be occupied during construction - please confirm / provide extent

Government does not intend to occupy any portion of the building during the construction phase of this project.

PROJECT TITLE/LOCATION: Renovate Bldg 154, Indian Head, MD

PRE-PROPOSAL INQUIRY FORM (PPI FORM)

Page Section Para. Amend No.No. QUESTION GOVERNMENT RESPONSEReceived

7/12/2024 1 Amend 2

Amendment 2 revised the procurement from a two step to a one step process. In order to properly price the project additional time will be required.

We request that the Navy extend the due date for submission to August 16, 2024.

Proposal due date has been extended to Tuesday, 06 August 2024. 0003

Amendment 0004 Renovation Building 164 07092024 DA
Amendment 0004 Renovation Building 164 07092024
RFI Responses 07092024
PPI Responses Building 164 07092024 DA
Amendment 0003.pdf
Untitled
Amendment 0001 RENOVATE BUILDING 164 FINAL.pdf
Amendment 0001 RENOVATE BUILDING 164 LAST
SITE VISIT BUILDING 164
Next Amendment 0002 - PPI Responses & Updates.pdf
Untitled
Amendment 0003.pdf
Untitled
Amendment 0001 RENOVATE BUILDING 164 FINAL.pdf
Amendment 0001 RENOVATE BUILDING 164 LAST
SITE VISIT BUILDING 164
Next Amendment 0002 - PPI Responses & Updates.pdf
Untitled

File details come from the government source that posted it. Updated .