ATTACHMENT_Q31_154 Basis of Design - IFC Submission - HAZMAT Report.pdf
PDF 5 MB Posted
- Solicitation number
- N4008024R2227
About this file
This document is a Hazardous Material Survey report for Building 154 at the Indian Head Explosive Ordnance Disposal Technology Division (EODTD) in Indian Head, Maryland. The survey was conducted to identify potential asbestos-containing materials (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCBs), and other hazardous materials that may be impacted by the planned renovation and demolition of the building.
The key findings are:
- Asbestos was confirmed in the white/gray door caulking and the gray corrugated cementitious siding, both of which are non-friable. Fire doors and window caulk are presumed to contain asbestos until further sampling.
- LBP and lead-containing paint were identified on various structural steel components, doors, handrails, and exterior elements throughout the building.
- No PCBs were detected in the bulk door caulk samples. However, there is potential for PCB-containing light ballasts in the fluorescent fixtures.
- The existing lighting and HVAC systems may contain mercury and other hazardous materials that will require proper disposal.
The report provides detailed analytical results and recommendations for addressing the identified hazardous materials prior to the building renovation and demolition.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS MATERIAL SURVEY
NAVAL FACILITIES ENGINEERING COMMAND - ATLANTIC
NSF INDIAN HEAD BUILDING 154
INDIAN HEAD EODTD, INDIAN HEAD, MD
CONTRACT # N40080-17-D-0018
PROJECT # F5Y67309
Prepared for:
JACOBS GOVERNMENT SERVICE COMPANY
1100 North Glebe Road, Suite 500
Arlington, VA 22201
Submitted by:
6401 Golden Triangle Drive, #304
Greenbelt, MD 20770
January 2, 2020
Architect-Engineer Services Contract
Naval Facilities Engineering Command - Atlantic
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Delivery Order – 148008267 Project Number – F5Y67309 i
Table of Contents
EXECUTIVE SUMMARY ................................................................................................. i
ACRONYMS .................................................................................................................... .iv
1.0 INTRODUCTION
2.0 ASBESTOS SURVEY REPORT
2.1 Survey Methodology
2.2 Analytical Procedures
2.3 Inaccessible and Limited-Access Spaces
2.4 Survey Limitations
2.5 Asbestos Survey Results
2.6 Asbestos Conclusions and Recommendations
3.0 LEAD-BASED PAINT SURVEY REPORT
3.1 LBP Survey Methodology
3.2 LBP Survey Results
3.3 LBP Conclusions and Recommendations
4.0 POLYCHLORINATED BIPHENYL (PCB) REPORT
4.1 Methodology
4.2 PCB Results and Interpretation
4.3 PCB Conclusions and recommendations
5.0 OTHER POTENTIALLY HAZARDOUS MATERIALS
6.0 DISCLAIMER
Appendices:
Appendix 1 – ACM Analytical Results
Appendix 2 – Bulk Sample Locations
Appendix 3 – Lead XRF Results
Appendix 4 – PCB Results
Appendix 5 – Inspector Certification(s)/License(s)
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Delivery Order – 148008267 Project Number – F5Y67309 i
EXECUTIVE SUMMARY
The Naval Facilities Engineering Command (NAVFAC) retained Jacobs Government
Services Company (Jacobs) to provide Architect-Engineering Services for the Indian Head
Explosive Ordnance Disposal Technology Division (EODTD), Indian Head, MD upgradation of the testing laboratories project at Building 154. Jacobs retained Global
Consulting, Inc. (GCI) to perform the environmental and hazardous material survey associated with this project. This report documents the survey of the Facility by certified inspectors for asbestos-containing material (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCBs), and other hazardous materials. Building 154 is a one-story 20,000 square foot (SF) warehouse built on a concrete slab-on-grade foundation. Its structure consists of metal and cementitious panel siding, metal roofing, high bay overhead rolling doors, metal exterior personnel doors, and single plane clerestory windows. This facility will be demolished to the building slab and will be rebuilt as a two-story, lab, administrative, and storage facility for CBR employees. This survey was intended to identify the potentially hazardous materials and conditions likely to be impacted by the proposed project.
Asbestos:
GCI’s EPA-accredited, Maryland-licensed Asbestos Inspector assessed the existing building materials suspected to contain asbestos and to be impacted during demolition. The asbestos survey was conducted on October 2, 2019. A total of sixteen (16) samples of six
(6) homogeneous suspect materials were collected and submitted for analysis to the project laboratory.
The following materials are confirmed ACM by laboratory analysis:
• White/Gray door caulking on pedestrian doors (non-friable)
• Gray corrugated cementitious siding (non-friable)
As these ACM are not friable, remedial action (abatement) is only required if these materials will be disturbed/impacted by the proposed demolition.
Fire doors throughout the building and window caulk, located at a height of approximately
20-30’ throughout the building, are presumed asbestos-containing and should be handled as
ACM until future bulk sampling confirms otherwise.
The analytical results for all other materials sampled indicated that no asbestos was detected, and the materials are not considered to be ACM; remedial action is not indicated. Details of the survey are presented in Section 2.0 – Asbestos Survey Report. Analytical results are presented in Appendix 1 – ACM Analytical Results.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018 ii
Lead-Based Paint:
GCI’s EPA-accredited Lead Risk Assessor and Industrial Hygienist (IH) performed a survey of the support structures, heating and cooling system, and means of ingress/egress associated with Building 154, on October 2, 2019. Most of the building was made available to the LBP inspector for the purpose of this survey. The sampling and analysis of suspect surfaces indicates that Lead-Based Paint (LBP) and Lead-Containing Paint (LCP) are present in the facility and they have an elevated potential to be impacted during the demolition of the building.
The following components were identified as LBP:
• Grey structural steel columns found throughout the building, and associated pieces of structural steel
• Grey bay doors, with the exception of the Overhead Door in the maintenance area on the Northeast corner of the building
• Orange structural steel columns found throughout the building
• Brown structural steel columns found throughout the building, and associated pieces of structural steel
• Yellow painted handrails and associated toe boards leading to lower level of warehouse
• White painted exterior wooden door on the Southernmost facing side of the building
The following materials are considered painted with LCP:
• Blue electrical utility boxes in the NE corner maintenance area/storage space
• Grey doors leading to exterior of building, present in large warehouse space
• Red piping for facility sprinkler system
• White exterior steel columns in front of lower bay doors, on east side of building
• White paint on exterior staircase railings and stringers, present on Southernmost side of building.
Details of the survey are presented in Section 3.0 – Lead-Based Paint Survey Report.
Analytical results are presented in Appendix 3 – Lead XRF Results.
Polychlorinated Biphenyls (PCBs)
The EPA considers a material to be PCB-containing if it contains equal to or greater than
50 parts per million (ppm) of PCBs. Laboratory analysis (Method 8082) by ALS Laboratory
Group in Holland, MI, confirmed that none of the three bulk door caulk samples contained detectable concentrations of PCBs.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018 iii
GCI noted one fluorescent light fixture in the building. There is an elevated potential that
PCB-containing light ballasts are present in that fixture based on the age and type of fixtures observed.
Other Potentially Hazardous Materials:
The Facility was surveyed for other potentially hazardous materials that might be impacted by the demolition The existing lighting systems, if impacted or removed during the project, have an elevated potential to contain mercury-containing bulb components and should be disposed of in accordance with the Environmental Protection Agency (EPA) Universal
Waste Regulations 40 CFR 273.
Florescent lighting systems equipped with electrical ballasts have an elevated potential to contain PCB dielectric fluids. The florescent light ballasts should be disposed of a PCB waste unless specifically marked as non-PCB light ballasts. Should fluorescent light ballasts that are not specifically marked “non-PCB containing” ballasts be encountered during renovation, they should be managed and disposed of in accordance with Toxic Substances
Control Act (TSCA) Storage and Disposal Requirements for Fluorescent Light Ballasts.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018 iv
ACRONYMS
ACM Asbestos-Containing Material
AHERA Asbestos Hazard Emergency Response Act
CFR Code of Federal Regulations
CSP Certified Safety Professional
CPSC Consumer Product Safety Commission
EPA Environmental Protection Agency
EPDTD Explosive Ordnance Disposal Technology Division
HVAC Heating, Ventilation, and Air Conditioning
IH Industrial Hygienist
LBP Lead-Based Paint
LCP Lead-Containing Paint
MDE Maryland Department of the Environment
MOSH Maryland Occupational Safety and Health
NVLAP National Voluntary Laboratory Accreditation Program
NESHAP National Emission Standards for Hazardous Air Pollution
OSHA Occupational Safety & Health Administration
PCB Polychlorinated Biphenyl
PLM Polarized Light Microscopy
PACM Presumed Asbestos-Containing Material
PCS Performance Characteristic Sheet
ODS Ozone Depleting Substances
RACM Regulated Asbestos-Containing Material
TCLP Toxicity Characteristic Leaching Procedure
TSCA Toxic Substances Control Act (1976)
XRF X-ray Fluorescence
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
1.0 INTRODUCTION
The Naval Facilities Engineering Command (NAVFAC) retained Jacobs Government
Services Company (Jacobs) to provide Architect-Engineering Services for the Indian Head
EODTD, Indian Head, MD upgradation of the testing laboratories project at Building 154.
Jacobs retained Global Consulting, Inc. (GCI) to perform the environmental and hazardous material survey associated with this project. The mutual goal of the contractor and the government is to achieve a quality product, safely, within the expected timeframe and budget.
The purpose of the survey was to identify potential Asbestos-Containing Materials (ACM), Lead-Based Paint (LBP) and other potential hazardous and regulated material in the Facility that maybe impacted by the proposed renovation.
The scope of work for this survey consisted of the following tasks:
1. Review of available records for identified and suspect ACM, LBP, PCB, and other hazardous and regulated materials that may be impacted by the scope of work;
2. Conduct a visual survey of the project area to identify potential location(s) of hazardous materials that may be affected by the scope of work.
3. Collect bulk samples of suspect ACMs; Assess building components for LBP using an X-ray fluorescence (XRF) analyzer; Collect bulk samples of suspect PCB-containing materials; and Inventory other visible hazardous and regulated materials.
4. Submit the suspect ACM bulk samples to a certified laboratory for Polarized Light
Microscopy (PLM) and/or Transmission Electron Microscopy (TEM) -where applicable; Download the XRF results; Submit the suspect PCB-containing samples to a certified laboratory for analysis.
5. Prepare a report summarizing data, collection techniques, analysis procedures, location and quantity of ACM, LBP/LCP, PCB, and other hazardous and regulated materials observed and detailed recommendations for any indicated response actions.
6. Abatement specification will be prepared separately, if required.
2.0 ASBESTOS SURVEY REPORT
This section describes the site survey and sample collection of suspect ACMs. The site survey was completed on October 2, 2019, by GCI’s EPA-accredited Asbestos Hazard
Emergency Response Act (AHERA) and State of Maryland Department of Environmental
(MDE)-accredited asbestos inspector, Ms. Judi Todd Darnell (MDE License# 18034611).
A copy of Ms. Darnell’s license is included in Appendix 5.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
The Environmental Protection Agency (EPA) and the State of Maryland are the authorities that regulate activities related to asbestos-containing materials (ACMs) within the State of
Maryland. The EPA regulations enforce four asbestos activities; (1) removal, repair, or encapsulation of asbestos-containing materials (ACM), (2) approval of asbestos training providers, (3) regulation of professionals accredited to perform asbestos-related activities, and (4) asbestos in schools. The Maryland Department of the Environment (MDE) regulates the enforcement of the EPA’s National Emission Standards for Hazardous Air Pollutants
(NESHAP), and enforcement of the asbestos notification regulations.
2.1 Survey Methodology
The asbestos survey was divided into two distinct phases: pre-survey planning and field survey.
2.1.1 Pre-Survey Planning
The pre-survey planning phase includes reviewing previous survey reports, drawings, management plans, and abatement reports, if available. Jacobs provided GCI with information regarding the planned renovations and upgrades of the property for this project.
GCI planned a survey strategy and scheduled the survey work. It was determined that this survey should include selected portions of the Facility designated on the project drawings to ensure that intended renovations and/or related demolition, can be conducted in an efficient and safe manner compliant with applicable Federal, state, and local regulations.
2.1.2 Field Survey
The field survey was conducted on affected spaces to be renovated as determined in the planning phase, and building materials related to the testing facilities were identified and considered to be suspect ACM.
Suspect materials that were homogeneous in nature (i.e., uniform in color and texture, installation date) were identified, touched to determine friability, and sampled by removing a small amount of material. Extreme care was taken to avoid potential fiber release during the sampling process. Before sample collection, a fine mist of water was typically applied to the sampling location. Samples were collected using sharpened core samplers and/or utility knives, where necessary, and immediately placed in labeled containers and sealed.
Any dust generated was wet-wiped to minimize the potential fiber release. All sampling locations were promptly patched and repaired. The location and condition of each homogeneous material were recorded. This is a limited survey of testing laboratories and is not intended to serve as a complete building assessment.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
2.2 Analytical Procedures
The samples of suspect ACMs were packaged and delivered under strict chain of custody procedures to AMA Analytical Services of Lanham, MD, a National Voluntary Laboratory
Accreditation Program (NVLAP) accredited laboratory.
Quantification of asbestos content in bulk samples was performed via EPA 600/R-93/116
Method using Polarized Light Microscopy (PLM). This method of analysis involves the dispersion staining of a suspect material in a solution of known refractive index and then subjected to illumination by polarized light. The resulting color display enables mineral identification. The EPA, Occupational Health and Safety Administration (OSHA) and the
State of Maryland defines an ACM as any material containing greater than 1% asbestos.
A summary of field data including the sample designations, gross descriptions, and analytical results are provided in Table 2. The analytical results of all bulk samples and chain of custody documents are provided in Appendix 1.
2.3 Inaccessible and Limited-Access Spaces
Every reasonable effort was made to locate suspect ACM at elevated potential to be impacted by this project. Areas that were inaccessible, or where the survey was limited to visual observation only, are identified in this report’s narrative. Such inaccessible areas might include, but are not limited to, those listed in Table 1: Description of Potential
Inaccessible Locations.
Table 1: Description of Potential Inaccessible Locations
❑ Mechanical and plumbing system above the reach of readily accessible ladders
❑ Concealed by waterproofing systems including roofs and wall systems
❑ Enclosed pipe/duct chases/floor penetrations ❑ Inside mechanical equipment/ductwork
❑ Inside Fire Doors ❑ Above the reach of a 6’ ladder
2.4 Survey Limitations
This survey was limited to areas and building systems scheduled for demolition as part of the scope of this project. Other suspect materials observed or discovered during renovation and/or demolition activities not identified within this report should be considered as presumed asbestos-containing material (PACM) and treated as ACM until sampling and laboratory analysis confirm otherwise.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
2.5 Asbestos Survey Results
A total of sixteen (16) bulk samples were collected from six (6) homogeneous suspect materials during the survey of Building 154. The suspect ACM and asbestos laboratory analytical results are summarized in Table 2: Description of Homogeneous Areas and
Sampling Results. Asbestos bulk sample locations are illustrated in the drawings in
Appendix 2. Where permitted, photos are provided of sampled materials.
Table 2: Description of Homogeneous Areas and Sampling Results
Material
Description Sample Number Sample Location
Asbestos
Content Photo
Gray corrugated cementitious siding
(homogeneous area
#01)
AA160-B154-01A
Exterior wall left of small bay door
15%
Chrysotile
AA160-B154-01B
Interior wall right of entrance to small bay
15%
Chrysotile
AA160-B154-01C Interior wall in big bay 15%
Chrysotile
Black expansion material
(homogeneous area
#02)
AA160-B154-02A,
2B, 2C
Exterior wall left of small bay door under gray corrugated cementitious siding
Non-Detect
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Table 2: Description of Homogeneous Areas and Sampling Results
Material
Description Sample Number Sample Location
Asbestos
Content Photo
White/gray door caulk (homogeneous area #03)
AA160-B154-03A Small bay-left door 3%
Chrysotile
No Photo Available
(Photos not permitted on building exterior)
AA160-B154-03B,
03C
Fire door along road side
Chrysotile
TR
Black sealant on concrete footings
(homogeneous area
#04)
AA160-B154-04A
Inside big bay next to middle stairs
AA160-B154-04B
Inside big bay next to stairs closer to rear of building
AA160-B154-04C
Gray cementitious caulking on pipe conduit
(homogeneous area
#05)
AA160-B154-05A
Big bay exterior wall road side
Non-Detect No Photo Available (Photos not permitted on building exterior) AA160-B154-05B Non-Detect
Beige soft caulking on pipe conduit
(homogeneous area
#06)
AA160-B154-
06A Big bay exterior wall road side
Non-Detect No Photo Available (Photos not permitted on building exterior) AA160-B154-06B Non-Detect
TR-Trace asbestos (<1%)
Window caulk in Building 154 was not sampled due to height restrictions. Fire doors were not sampled in order to maintain their safety rating. These materials are presumed to contain asbestos and should be handled as though they are ACM until future sampling indicates otherwise.
2.6 Asbestos Conclusions and Recommendations
Regulated asbestos-containing material (RACM) is defined as friable asbestos-containing material (ACM) or non-friable asbestos-containing material (ACM) with an asbestos fiber content greater than 1%. The regulations require that RACM not be subjected to sanding, grinding, cutting, or abrading or has crumbled, pulverized, or reduced to powder during
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018 demolition or renovation operations. Both presumed and positively-identified ACM should be treated as RACM. All RACM with the potential to be impacted by the renovation/demolition should be abated in accordance with all applicable Federal, state and local regulations.
Based on laboratory analysis, the gray corrugated cementitious siding and door caulking on pedestrian doors throughout Building 154 are ACM. Window caulk is PACM. These ACM and PACM are not friable. Remedial action (abatement) is required if these materials are disturbed/impacted by the proposed demolition/renovation.
The analytical results for all other materials sampled indicated that no asbestos was detected, and the materials are not considered to be ACM. General safety and health standards in construction may be used for their removal, demolition, and disposal.
If additional suspect materials are identified during renovation/demolition, and they will be disturbed by the proposed work and have not been tested to determine the presence of asbestos, those materials should be protected from impact until further investigated and the asbestos content determined.
All quantities must be field-verified by a licensed asbestos abatement contractor(s) prior to demolition or renovation.
Sampling locations and positively-identified ACMs are illustrated on Drawings presented in Appendix 2.
3.0 LEAD-BASED PAINT SURVEY REPORT
This section describes data collection activities including the site survey and sample collection for Lead-Based Paint (LBP) that will be affected by the renovation of Indian Head
Naval Surface Warfare Center, Building 154. The site survey was completed on October 2, 2019, by GCI’s Industrial Hygienist and EPA-accredited Risk Assessor, Judi Darnell
(certificate # 107081). A copy of Ms. Darnell’s certificate is included in Appendix 5.
3.1 LBP Survey Methodology
Testing for LBP was conducted using a Niton XLP 300A X-ray fluorescence (XRF)-type analyzer (serial number 18595); hereto referred to as XRF. Prior to XRF analysis, the instrument was calibrated against reference standards of known lead concentrations. Those components that may be impacted by the building renovation were screened for LBP.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
The XRF detects lead in the field by reading fluorescence emanating from a painted surface when exposed to small amounts of radiation. XRF readings are in milligrams per square centimeter (mg/cm2), a mass per area unit. LBP is defined as a point containing greater than
0.7 mg/cm2 lead according to the Maryland Department of the Environment and Lead-containing paint (LCP) is defined by any Components/Paints with greater than 0.009% lead by weight (90 parts per million) according to the U.S. CPSC. Prior to testing, the composition of the test building substrate (e.g., wood, metal, etc.) was determined by the lead inspector, and subsequently logged into the XRF analyzer. The Niton XLP 300A automatically performs a substrate correction to ensure that this factor does not result in false negative readings.
At the end of each sampling session, a calibration re-check is performed to ensure that the instrument has maintained accuracy and precision during the measurement period. The instrument is also calibrated each time it is turned off, or on, and typically at four (4) hour intervals during the workday for the same reasons. The use of the XRF was in general accordance with the Performance Characteristic Sheet (PCS) methodology for the specific instrument. XRF instrument calibration checks were performed according to the
Performance Characteristic Sheet (PCS).
The XRF data was downloaded directly to a computer to generate a report detailing the date/time, materials sampled, location, substrate and lead content. This survey included only painted surfaces.
The raw data is presented in Appendix 3 – Lead XRF Results.
3.2 LBP Survey Results
The following materials in Building 154 tested positive for LBP at the time of the inspection:
• Grey structural steel columns found throughout the building, and associated pieces of structural steel
• Grey bay doors, with the exception of the Overhead Door in the maintenance area on the Northeast corner of the building
• Orange structural steel columns found throughout the building
• Brown structural steel columns found throughout the building, and associated pieces of structural steel
• Yellow painted handrails and associated toe boards leading to lower level of warehouse
• White painted exterior wooden door on the Southernmost facing side of the building
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
The following materials in Building 154 tested positive for LCP at the time of the inspection:
• Blue electrical utility boxes in the NE corner maintenance area/storage space
• Grey doors leading to exterior of building, present in large warehouse space
• Red piping for facility sprinkler system
• White exterior steel columns in front of lower bay doors, on east side of building
• White paint on exterior staircase railings and stringers, present- on southernmost side of building.
3.3 LBP Conclusions and Recommendations
The results of the survey for LBP indicate that much of the structural steel as well as several other building components contain LBP. Additionally, many other components featured in the survey fall under the category of lead-containing. OSHA Lead in Construction should be followed for all painted surfaces containing a detectable amount of lead, that may be disturbed during renovation. It is recommended, where possible, to use a mechanical connection to attach to LBP-painted structures rather than welding, in order to minimize the impact to LBP/LCP.
U.S. Navy guidelines should be followed concerning the stabilization of LBP at military facilities. Under an agreement with the United States Occupational Safety and Health
Administration (OSHA), MOSH (Maryland Occupational Safety and Health) promotes occupational safety and health in workplaces across Maryland. In addition to adopting many of the Federal standards pertaining to lead-containing paint under General Industry (29
CFR 1910), Construction (29 CFR 1926). MOSH has supplemented the OSHA standards with several requirements unique to Maryland.
Contractors must be trained and accredited through the Maryland Department of the
Environment (MDE). Lead paint contractors include those who work on residential, public, and commercial buildings as well as the maintenance work required in rental housing;
structural steel projects, such as bridges, water tanks, and industrial structures; and conducting lead paint surveys. Abatement supervisors and workers must be trained in accordance with State of Maryland laws.
The LBP and LCP painted surfaces that will be impacted during demolition/renovation should be managed in accordance with Federal, state, and local regulations. If lead paint-containing components are not to be abated, lead safe construction practices should be followed. Painted metal components being disposed of during this renovation should be managed as scrap metal and the Facility notified of the LBP and LCP contents of the paint.
The disposal of lead-containing waste materials generated during renovation shall be properly characterized via Toxicity Characteristic Leaching Procedure (TCLP), and
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018 disposed of at a facility licensed to accept the waste profile generated during characterization and the facility should be notified the material has LBP or LCP.
4.0 POLYCHLORINATED BIPHENYL (PCB) REPORT
The Toxic Substances Control Act (TSCA) of 1976 authorized the U.S. Environmental
Protection Agency (EPA) to control substances that were determined to cause unreasonable risk to public health or the environment. In 1979, the U.S. EPA banned the manufacture of new products containing PCBs and developed regulatory requirements for the storage, labeling, use, and disposal of materials containing PCBs at levels above the regulatory thresholds. In addition, the regulations under TSCA specify allowed or authorized uses of
PCBs in certain situations. If a material or item is not specifically listed, it is considered unauthorized. The U.S. EPA considers building materials containing PCBs, including caulk, with PCB concentration exceeding 50 ppm to be a regulated material that requires specific abatement requirements and worker protection considerations.
4.1 METHODOLOGY
The inspection included a visual inspection as well as bulk sampling. Three bulk door caulk samples were submitted under strict chain of custody to ALS Laboratory Group of Holland, Michigan. EPA Method 8082 was used to determine the concentrations of various Aroclors using dual capillary columns with electron capture detectors. Aroclor is a PCB mixture produced from approximately 1930 to 1979; it is one of the most commonly known trade names for PCB mixtures. There are many types of Aroclors, and each has a distinguishing suffix number that indicates the degree of chlorination.
4.2 PCB RESULTS AND INTERPRETATION
Laboratory analysis confirmed that none of the three door caulk samples contained detectable concentrations of PCBs. Laboratory results are presented in Appendix 4.
The windows in Building 154 are approximately 20-30’ in height. GCI was not able to determine if window caulk/glazing is present.
GCI observed one (1) light fixture in the building that is equipped with one to two ballasts.
Florescent lighting systems equipped with electrical ballasts have an elevated potential to contain PCB dielectric fluids. The florescent light ballasts should be disposed of a PCB waste unless specifically marked as non-PCB light ballasts.
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
4.3 PCB CONCLUSIONS AND RECOMMENDATIONS
Should fluorescent light ballasts that are not specifically marked “non-PCB containing” ballasts be encountered during renovation, they should be managed and disposed of in accordance with Toxic Substances Control Act (TSCA) Storage and Disposal Requirements for Fluorescent Light Ballasts.
5.0 OTHER POTENTIALLY HAZARDOUS MATERIALS
The Facility was surveyed for other potentially hazardous materials that might be impacted by the planned demolition. The existing lighting systems have an elevated potential to contain mercury containing bulb components and, if impacted should be disposed of in accordance with Universal Waste Regulations.
6.0 DISCLAIMER
Information in this survey report relating to hazardous materials (i.e., asbestos and lead), although believed to be inclusive and accurate, was based on visual observations and field sampling of accessible areas at the time of survey. Limiting conditions included non-destructive sampling, inaccessible areas such as between walls and floors of the structure.
Global Consulting, Inc. reserves the right to revise any recommendations and conclusions based on new information that may become available and does not guarantee or accept any liability that encompasses this survey of hazardous or regulated materials located within this
Facility. This survey report is not intended to serve as a comprehensive survey of the entire facility and is limited to materials likely to be impacted by the scope of work of this project
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Appendix 1- ACM Analytical Results
Chain of Custody: 617953
Client: Global Consulting, Inc. (GCI)
Address: 6401 Golden Triangle Drive Suite 304 Greenbelt, MD 20770
Attention: Judi Darnell
Job Name: Jacobs Indian Head B154
Job Location: Building 154
Job Number: AA160
P.O. Number: Not Provided
Date Submitted: 10/03/2019
Date Analyzed: 10/08/2019
Report Date: 10/08/2019
Date Sampled: Not Provided
Person Submitting: Kenna Leonzo
CERTIFICATE OF ANALYSIS
Summary of Polarized Light Microscopy
AMA
Sample Number
Client Sample Number
Total Asbestos
Chrysotile Percent
Amosite Percent
Crocidolite Percent
Other Asbestos Percent
Mineral Wool Percent
Fiberglass Percent
Organic Percent
Synthetic Percent
Other Percent
Particulate Percent
Sample Type
Sample Color
Homogeneity Analyst
ID
Comments
617953-1 AA160-B154-01A 15 15 TR -- -- -- -- -- -- -- 85 SD Gray Homogeneous LBP
617953-2 AA160-B154-01B 15 15 TR -- -- -- -- -- -- -- 85 SD Gray Homogeneous LBP
617953-3 AA160-B154-01C 15 15 TR -- -- -- -- -- -- -- 85 SD Gray Homogeneous LBP
617953-4 AA160-B154-02A NAD -- -- -- -- -- -- -- -- -- 100 MS Black Homogeneous LBP
617953-5 AA160-B154-02B NAD -- -- -- -- -- -- -- -- -- 100 MS Black Homogeneous LBP
617953-6 AA160-B154-02C NAD -- -- -- -- -- -- TR -- -- 100 MS Black Homogeneous LBP
617953-7 AA160-B154-03A 3 3 -- -- -- -- -- -- -- -- 97 CK Multi Homogeneous LBP
617953-8 AA160-B154-03B TR TR -- -- -- -- -- -- -- 2 98 CK Multi Homogeneous LBP
617953-9 AA160-B154-03C TR TR -- -- -- -- -- -- -- 2 98 CK Multi Homogeneous LBP
617953-10 AA160-B154-04A NAD -- -- -- -- -- -- -- -- -- 100 SLT Black Homogeneous LBP
617953-11 AA160-B154-04B NAD -- -- -- -- -- -- -- -- -- 100 SLT Black Homogeneous LBP
617953-12 AA160-B154-04C NAD -- -- -- -- -- -- -- -- -- 100 SLT Black Homogeneous LBP
617953-13 AA160-B154-05A NAD -- -- -- -- -- -- -- -- -- 100 Cement Gray Homogeneous LBP
617953-14 AA160-B154-05B NAD -- -- -- -- -- -- -- -- -- 100 Cement Gray Homogeneous LBP
617953-15 AA160-B154-06A NAD -- -- -- -- -- -- -- -- -- 100 CK Beige Homogeneous LBP
617953-16 AA160-B154-06B NAD -- -- -- -- -- -- -- -- -- 100 CK Beige Homogeneous LBP
4475 Forbes Blvd. · Lanham, MD, 20706 · (301) 459-2640 · Toll Free (800) 346-0961 · Fax (301) 459-2643 1/2
Chain of Custody: 617953
Client: Global Consulting, Inc. (GCI)
Address: 6401 Golden Triangle Drive Suite 304 Greenbelt, MD 20770
Attention: Judi Darnell
Job Name: Jacobs Indian Head B154
Job Location: Building 154
Job Number: AA160
P.O. Number: Not Provided
Date Submitted: 10/03/2019
Date Analyzed: 10/08/2019
Report Date: 10/08/2019
Date Sampled: Not Provided
Person Submitting: Kenna Leonzo
CERTIFICATE OF ANALYSIS
Summary of Polarized Light Microscopy
AMA
Sample Number
Client Sample Number
Total Asbestos
Chrysotile Percent
Amosite Percent
Crocidolite Percent
Other Asbestos Percent
Mineral Wool Percent
Fiberglass Percent
Organic Percent
Synthetic Percent
Other Percent
Particulate Percent
Sample Type
Sample Color
Homogeneity Analyst
ID
Comments
The following footnotes only apply to those samples which the total asbestos result is flagged with a note number.
TEM RECOMMENDATION - Please note, due to resolution limitations with optical microscopy and/or interference from matrix components of this sample, results which are reported via PLM as negative or trace (<1%) for asbestos may contain a significant quantity of asbestos. It is recommended that the additional analytical technique of TEM be used to check for asbestos fibers below the resolution limits of optical microscopy.
MATRIX REDUCTION RECOMMENDATION - Please note, due to interference from the matrix components of this sample, results which are reported via PLM as negative or trace (<1%) for asbestos may contain a significant quantity of asbestos which is obscured from view. It is recommended that the additional preparation technique of gravimetric reduction be performed on this sample to minimize the obscuring effects of matrix components, followed by reanalysis by PLM and/or TEM.
Analysis Method - EPA/600/R-93/116 dated July 1993 NAD = "No Asbestos Detected" TR = "Trace equals less than 1% of this component"
Uncertainty: For samples containing asbestos in range of 1-10% the CV is 0.43, 11-35% CV=0.55, >35 CV=0.23. All results are to be considered preliminary and subject to change unless signed by the Technical Director or Deputy.
Analyst(s): Lom Butruk
Technical Director Andreas Saldivar
This report applies only to the sample, or samples, investigated and is not necessarily indicative of the quality or condition of apparently identical or similar products. As a mutual protection to clients, the public, and these Laboratories, this report is submitted and accepted for the exclusive use of the client to whom it is addressed and upon the condition that it is not to be used, in whole or in part, in any advertising or publicity matter without prior written authorization from us. Sample types, locations, and collection protocols are based upon the information provided by the persons submitting them and, unless collected by personnel of these Laboratories, we expressly disclaim any knowledge and liability for the accuracy and completeness of this information. Residual sample material will be discarded in accordance with the appropriate regulatory guidelines, unless otherwise requested by the client. NVLAP accreditation applies only to polarized light microscopy of bulk samples and transmission electron microscopy of AHERA air samples. This report must not be used to claim, and does not imply product certification, approval, or endorsement by NVLAP or any agency of the Federal Government. All rights reserved. AMA Analytical Services, Inc.
4475 Forbes Blvd. · Lanham, MD, 20706 · (301) 459-2640 · Toll Free (800) 346-0961 · Fax (301) 459-2643 2/2
Sample # Description Location Friable
(Yes/No)
HA #
AA160-B154-01A Exterior wall left of small bay door
AA160-B154-01B
Interior wall right of entrance to small bay
AA160-B154-01C Interior wall in big bay
AA160-B154-02A
Exterior wall left of small bay door under transite
AA160-B154-02B
Exterior wall left of big bay main entrance under transite
AA160-B154-02C
Exterior wall left of big bay main entrance under transite
AA160-B154-03A Small bay - left door
AA160-B154-03B Fire door along road side
AA160-B154-03C Fire door along road side
AA160-B154-04A Inside big bay next to middle stairs
AA160-B154-04B
AA160-B154-04C
AA160-B154-05A
AA160-B154-05B
AA160-B154-06A
AA160-B154-06B
INDIAN HEAD BLDG 154
Big bay exterior wall road side
Inside big bay next to stairs closer to rear of building
Big bay exterior wall road side
No 4
No 5
No 6
No 1
No 2
No 3
Beige soft caulking on pipe conduit
Gray corrugated cementitious siding
Black expansion material
White/gray door caulk
Black sealant on concrete footings
Gray cemenitious caulking on pipe conduit
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Appendix 2- Bulk Sample Locations
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Appendix 3 – Lead XRF Results
XRF Data for Building 154
October 2, 2019
Time Type Component Substrate Side Condition Color Results PbC
10/2/2019 9:38 Paint CALIBRATE Positive 1.10
10/2/2019 9:39 Paint CALIBRATE Positive 1.00
10/2/2019 9:40 Paint CALIBRATE Positive 1.00
10/2/2019 9:43 Paint COLUMN METAL A INTACT GREY Positive 14.50
10/2/2019 9:47 Paint ELECTRICAL UTILITY BOX METAL A INTACT BLUE Negative 0.06
10/2/2019 9:48 Paint ELECTRICAL UTILITY BOX METAL A INTACT BLUE Negative 0.01
10/2/2019 9:49 Paint WALL METAL A INTACT BEIGE Negative 0.00
10/2/2019 9:49 Paint WALL METAL A INTACT BEIGE Negative 0.00
10/2/2019 9:51 Paint COLUMN METAL A CRACKED GREY Positive 3.50
10/2/2019 9:53 Paint COLUMN METAL C CRACKED GREY Positive 3.90
10/2/2019 9:55 Paint BAY DOOR (NE CORNER MAINTENANCE SHOP) METAL C INTACT GREY Negative 0.00
10/2/2019 9:57 Paint DOOR FRAME (NE CORNER MAINTENANCE SHOP) METAL B INTACT GREY Negative 0.00
10/2/2019 9:58 Paint DOOR (NE CORNER MAINTENANCE SHOP) METAL C INTACT GREY Negative 0.00
10/2/2019 10:00 Paint EXTERIOR CORRUGATED WALL METAL C INTACT WHITE Negative 0.00
10/2/2019 10:02 Paint COLUMN METAL B INTACT ORANGE Positive 21.70
10/2/2019 10:04 Paint COLUMN METAL C INTACT BROWN Positive 5.30
10/2/2019 10:08 Paint DOOR METAL C INTACT GREY Negative 0.01
10/2/2019 10:09 Paint DOOR FRAME METAL C INTACT GREY Negative 0.00
10/2/2019 10:11 Paint BAY DOOR METAL C INTACT GREY Positive 3.00
10/2/2019 10:11 Paint COLUMN METAL D INTACT GREY Positive 6.70
10/2/2019 10:13 Paint TOEBOARD METAL B INTACT YELLOW Positive 2.10
10/2/2019 10:13 Paint RAILING METAL B INTACT YELLOW Positive 2.20
10/2/2019 10:14 Paint TOEBOARD METAL B INTACT YELLOW Positive 4.10
10/2/2019 10:17 Paint DOOR METAL D INTACT GREY Negative 0.40
10/2/2019 10:18 Paint COLUMN METAL D CRACKED GREY Positive 1.50
10/2/2019 10:20 Paint BAY DOOR METAL C INTACT GREY Positive 1.60
10/2/2019 10:23 Paint SPRINKLER SYSTEM PIPE METAL C INTACT RED Negative 0.01
10/2/2019 10:30 Paint EXTERIOR COLUMNS (LOWER BAY DOORS) METAL C CRACKED WHITE Negative 0.06
10/2/2019 10:31 Paint EXTERIOR COLUMNS (LOWER BAY DOORS) METAL C CRACKED WHITE Negative 0.05
10/2/2019 10:33 Paint DOOR-EXTERIOR (2ND LEVEL) WOOD C POOR WHITE Positive 4.50
10/2/2019 10:36 Paint STAIRCASE RAILING METAL D CRACKED WHITE Negative 0.60
10/2/2019 10:37 Paint STAIRCASE STRINGER METAL D CRACKED WHITE Negative 0.07
Hazardous Material Survey
Building 154– Renovation
Indian Head EODTD, Indian Head, MD Prime Contract - N40080-17-D-0018
Appendix 4 – PCB Results
22-Oct-2019
Global Consulting, Inc.
Judi Darnell
Dear Judi, Re: Indian Head B154 Work Order: 19100778
1818 New York Avenue NE
Washington, DC 20002
Suite 111
ALS Environmental received 3 samples on 09-Oct-2019 10:00 AM for the analyses presented in the following report.
Project Manager
Chad Whelton
Electronically approved by: Chad Whelton
The analytical data provided relates directly to the samples received by ALS Environmental - Holland and for only the analyses requested.
Sample results are compliant with industry accepted practices and Quality Control results achieved laboratory specifications. Any exceptions are noted in the Case Narrative, or noted with qualifiers in the report or QC batch information. Should this laboratory report need to be reproduced, it should be reproduced in full unless written approval has been obtained from ALS Environmental. Samples will be disposed in 30 days unless storage arrangements are made.
The total number of pages in this report is 10.
If you have any questions regarding this report, please feel free to contact me:
ADDRESS: 3352 128th Avenue, Holland, MI, USA
PHONE: +1 (616) 399-6070 FAX: +1 (616) 399-6185
Sincerely, ALS GROUP USA, CORP Part of the ALS Laboratory Group A Campbell Brothers Limited Company
Report of Laboratory Analysis Certificate No: MN 026-999-449
Date: 22-Oct-19ALS Group, USA
Project: Indian Head B154
Client: Global Consulting, Inc.
Work Order: 19100778 Work Order Sample Summary
Lab Samp ID Client Sample ID Collection DateTag Number Date ReceivedMatrix Hold
19100778-01 AA160-B154-PCB-01A Solid 10/2/2019 10:00 10/9/2019 10:00 19100778-02 AA160-B154-PCB-01B Solid 10/2/2019 10:00 10/9/2019 10:00 19100778-03 AA160-B154-PCB-01C Solid 10/2/2019 10:00 10/9/2019 10:00
Sample Summary Page 1 of 1
Client: Global Consulting, Inc.
Work Order: 19100778 Case Narrative
Samples for the above noted Work Order were received on 10/09/2019. The attached "Sample Receipt Checklist" documents the status of custody seals, container integrity, preservation, and temperature compliance.
Samples were analyzed according to the analytical methodology previously transmitted in the "Work Order Acknowledgement". Methodologies are also documented in the "Analytical Result" section for each sample. Quality control results are listed in the "QC Report" section.
Sample association for the reported quality control is located at the end of each batch summary. If applicable, results are appropriately qualified in the Analytical Result and QC Report sections. The "Qualifiers" section documents the various qualifiers, units, and acronyms utilized in reporting. A copy of the laboratory's scope of accreditation is available upon request.
With the following exceptions, all sample analyses achieved analytical criteria.
Extractable Organics:
Batch 144028, Method PCB2_8082_S, Sample 19100778-02A: One or more surrogate recoveries were below the lower control limits. The sample results may be biased low.
Surrogate recoveries affected by matrix interference.
Batch 144028, Method PCB2_8082_S, Sample 19100778-02A: The reporting limits are elevated due to dilution needed to eliminate matrix-related interference.
Case Narrative Page 1 of 1
ALS Group, USA Date: 22-Oct-19
QUALIFIERS,
ACRONYMS, UNITS
Project: Indian Head B154
Client: Global Consulting, Inc.
WorkOrder: 19100778
Units Reported Description
Qualifier Description
Acronym Description
Milligrams per Kilogrammg/Kg
Value exceeds Regulatory Limit*
Estimated Value**
Analyte is non-accrediteda
Analyte detected in the associated Method Blank above the Reporting LimitB
Value above quantitation rangeE
Analyzed outside of Holding TimeH
BOD/CBOD - Sample was reset outside Hold Time, value should be considered estimated.Hr
Analyte is present at an estimated concentration between the MDL and Report LimitJ
Not Detected at the Reporting LimitND
Sample amount is > 4 times amount spikedO
Dual Column results percent difference > 40%P
RPD above laboratory control limitR
Spike Recovery outside laboratory control limitsS
Analyzed but not detected above the MDLU
Analyte was detected in the Method Blank between the MDL and Reporting Limit, sample results may exhibit background or reagent contamination at the observed level.
X
Method DuplicateDUP
Laboratory Control SampleLCS
Laboratory Control Sample DuplicateLCSD
Limit of Detection (see MDL)LOD
Limit of Quantitation (see PQL)LOQ
Method BlankMBLK
Method Detection LimitMDL
Matrix SpikeMS
Matrix Spike DuplicateMSD
Practical Quantitation LimitPQL
Relative Percent DifferenceRPD
Target Detection LimitTDL
Too Numerous To CountTNTC
APHA Standard MethodsA
ASTMD
EPAE
SW-846 Update IIISW
QF Page 1 of 1
Sample ID: AA160-B154-PCB-01A
Collection Date: 10/2/2019 10:00 AM Matrix: SOLID
Analyses Result Qual Units Date Analyzed Report Limit
Client: Global Consulting, Inc.
Work Order: 19100778
Dilution Factor
Lab ID: 19100778-01
ALS Group, USA Date: 22-Oct-19
PCBS SW8082 Analyst: KBPrep: SW3540C 10/16/19 15:14
Aroclor 1016 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1221 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1232 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1242 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1248 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1254 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1260 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1262 10/21/2019 02:58 PM0.40 mg/Kg 1ND
Aroclor 1268 10/21/2019 02:58 PM0.40 mg/Kg 1ND
PCBs, Total 10/21/2019 02:58 PMmg/Kg 1ND Surr: Decachlorobiphenyl 10/21/2019 02:58 PM40-140 %REC 175.1
Surr: Tetrachloro-m-xylene 10/21/2019 02:58 PM45-124 %REC 187.1
Analytical Results Page 1 of 3
Note: See Qualifiers page for a list of qualifiers and their definitions.
Sample ID: AA160-B154-PCB-01B
Collection Date: 10/2/2019 10:00 AM Matrix: SOLID
Analyses Result Qual Units Date Analyzed Report Limit
Client: Global Consulting, Inc.
Work Order: 19100778
Dilution Factor
Lab ID: 19100778-02
ALS Group, USA Date: 22-Oct-19
PCBS SW8082 Analyst: KBPrep: SW3540C 10/16/19 15:14
Aroclor 1016 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1221 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1232 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1242 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1248 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1254 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1260 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1262 10/21/2019 03:12 PM3.5 mg/Kg 10ND
Aroclor 1268 10/21/2019 03:12 PM3.5 mg/Kg 10ND
PCBs, Total 10/21/2019 03:12 PMmg/Kg 10ND Surr: Decachlorobiphenyl S 10/21/2019 03:12 PM40-140 %REC 1010.0
Surr: Tetrachloro-m-xylene S 10/21/2019 03:12 PM45-124 %REC 1020.0
Analytical Results Page 2 of 3
Sample ID: AA160-B154-PCB-01C
Collection Date: 10/2/2019 10:00 AM Matrix: SOLID
Analyses Result Qual Units Date Analyzed Report Limit
Client: Global Consulting, Inc.
Work Order: 19100778
Dilution Factor
Lab ID: 19100778-03
ALS Group, USA Date: 22-Oct-19
PCBS SW8082 Analyst: KBPrep: SW3540C 10/16/19 15:14
Aroclor 1016 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1221 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1232 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1242 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1248 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1254 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1260 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1262 10/21/2019 03:27 PM0.88 mg/Kg 1ND
Aroclor 1268 10/21/2019 03:27 PM0.88 mg/Kg 1ND
PCBs, Total 10/21/2019 03:27 PMmg/Kg 1ND Surr: Decachlorobiphenyl 10/21/2019 03:27 PM40-140 %REC 170.1
Surr: Tetrachloro-m-xylene 10/21/2019 03:27 PM45-124 %REC 173.1
Analytical Results Page 3 of 3
Client: Global Consulting, Inc.
Work Order: 19100778
QC BATCH REPORT
Batch ID: 144028 Instrument ID GC14 Method: SW8082
Qual
RPD
Limit
Analysis Date: 10/16/2019 04:52 P
Prep Date: 10/16/2019
Analyte Result %REC %RPD
Units: µg/Kg
PQL
Client ID: SeqNo: 5993178
MBLK
Run ID: GC14_191015A
SPK Val
SPK Ref Value
RPD Ref Value
Control Limit
DF: 1
Sample ID: PBLKS1-144028-144028
Aroclor 1016 83ND
Aroclor 1221 83ND
Aroclor 1232 83ND
Aroclor 1242 83ND
Aroclor 1248 83ND
Aroclor 1254 83ND
Aroclor 1260 83ND
Aroclor 1262 83ND
Aroclor 1268 83ND
PCBs, Total 0ND
0033.3 Surr: Decachlorobiphenyl 84.1 40-140028
0033.3 Surr: Tetrachloro-m-xylene 87.1 45-124029
Qual
RPD
Limit
Analysis Date: 10/16/2019 05:07 P
Prep Date: 10/16/2019
Analyte Result %REC %RPD
Units: µg/Kg
PQL
Client ID: SeqNo: 5993179
LCS
Run ID: GC14_191015A
SPK Val
SPK Ref Value
RPD Ref Value
Control Limit
DF: 1
Sample ID: PLCSS1-144028-144028
00833Aroclor 1016 118 50-13083983.7
00833Aroclor 1260 112 50-13083934.3
0033.3 Surr: Decachlorobiphenyl 86.1 40-140028.67
0033.3 Surr: Tetrachloro-m-xylene 87.1 45-124029
Qual
RPD
Limit
Analysis Date: 10/16/2019 05:22 P
Prep Date: 10/16/2019
Analyte Result %REC %RPD
Units: µg/Kg
PQL
Client ID: SeqNo: 5993180
LCSD
Run ID: GC14_191015A
SPK Val
SPK Ref Value
RPD Ref Value
Control Limit
DF: 1
Sample ID: PLCSDS1-144028-144028
983.70833Aroclor 1016 121 50-130 083 2.511009
934.30833Aroclor 1260 122 50-130 083 8.61018
28.67033.3 Surr: Decachlorobiphenyl 87.1 40-140 00 1.1629
29033.3 Surr: Tetrachloro-m-xylene 94.1 45-1240 7.7331.33
The following samples were analyzed in this batch: 19100778- 01A
19100778- 02A
19100778- 03A
QC Page: 1 of 1
Note: See Qualifiers Page for a list of Qualifiers and their explanation.
ALS Group, USA
Sample Receipt Checklist
Client Name: GLOBALCONSULTING
Work Order: 19100778
Date/Time Received: 09-Oct-19 10:00
Received by: MJG
Checklist completed by eSignature Date
Reviewed by:
DateeSignature
Matrices: Solid
Carrier name: FedEx
Shipping container/cooler in good condition? Yes No Not Present
Custody seals intact on shipping container/cooler? Yes No Not Present
Custody seals intact on sample bottles? Yes No Not Present
Chain of custody present? Yes No
Chain of custody signed when relinquished and received? Yes No
Chain of custody agrees with sample labels? Yes No
Samples in proper container/bottle? Yes No
Sample containers intact? Yes No
Sufficient sample volume for indicated test? Yes No
All samples received within holding time? Yes No
Container/Temp Blank…