18R0007_Amendment_0008.pdf
PDF 32 KB Posted
- Solicitation number
- N4008018R0007
About this file
18R0007_Amendment_0008.pdf
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5170338
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BID-BUILD SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO
WASHINGTON, D.C., MARYLAND AND VIRGINIA
The purpose of this amendment is to provide the follow ing:
1. Responses to RFIs.
2. Pictures of existing items as requested and approved to be posted.
Proposal due date/time remains unchanged.
All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0007
X 9B. DATED (SEE ITEM 11)
26-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Apr-2018
CODE
NAVAL FACILITIES ENG COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION
SUMMAR
SECTION
The follow
AMEN
DESIGN-B
NEW CO
WASHING
D.C., MAR
The purpos
1. Respon
2. Pictures
Proposal d
All other te
90. Note N
Respo and “
112. Will they w case b
122. Can w
10".
130. Will
143. On d supply tho
144. Pleas
SF 30 BLOCK
RY OF CHAN
SF 30 - BLO
wing have been
NDMENT 000
BID-BUILD
ONSTRUCTIO
GTON AREA
RYLAND AN
se of this amen nses to RFIs.
s of existing ite due date/time re erms and cond
N.1 on S-001 re onse: See atta 1982 B210D O extended base onse: Base ac would need to basis.
we get the dim onse: Elevator this project ne onse: Assume drawing E-601 se.
onse: Governm se supply existi
K 14 CONTIN
NGES
CK 14 CONTI
n added by full
SMALL BUS
ON, REPAIR
A OF RESPO
ND VIRGINIA
ndment is to pr ems as requeste emains unchan itions remain u eferences some ached drawin Original Build access badges ccess badges f o be renewed.
mensions of the r Opening: wi ed National Ca it is not requi there are refe ment does not ing switchgear
NUATION PAG
INUATION PA
text:
SINESS MUL
R, AND REN
ONSIBILITY
A rovide the follo ed and approve nged.
unchanged.
Resp e existing as-bu ngs “1975 B21 ding Drawings s/passes be mad for extended p It is also ult freight elevato idth 10', heigh apital Planning ired.
erences to She t see any refer r drawings.
GE
AGE
LTIPLE AWA
NOVATION O
INCLUDING
owing:
ed to be posted ponses to RFIs uilt structural d
10C Electronic Plans and Ele de available for periods are p timately up to or?
ht 6' 7". Eleva g Commission a ets 33 & 35 in rences on E-60
ARD CONST
OF VARIOU
G BUT NOT L
d.
s drawings. Ple c Developmen evations” r the duration o possible, but t o base security ator Car: wid approval?
n the existing
01 for sheet 33
TRUCTION C
US FACILITI
LIMITED TO
ease provide th nt Laboratory of this project?
there are time y as to what t dth 13' 6", de switchgear AT
3 & 35.
N4008018R
Page
CONTRACT
IES AT NAV
O WASHING
hese documents y Arch and St e limits after they will allow pth 7' 4", hei
TO drawings.
R0007
FOR
VFAC
GTON,
s.
truct” which w on a ight 7'
Please
N4008018R0007
Response: See response to RFI#143.
206. How much time, if any, shall be allotted per day to sign in workers due to the stringent security requirements?
Response: The time to sign in is equal to the time to sign the book for each crew member.
210. Amendment 0006 RFI 53 Gov. response did not address the requested clarification. The question is whether or not the Gov. would like the Offerors to include the cost pre-bid or will it be added via a contract mod post-bid.
Please clarify.
Response: Offerors should include the cost pre bid and reference the attached photos for current condition of the grating.
214. Drawing Md-401- Please provide scheduled date that Chillers will be turned over to contractor, for upgrade.
Response: This depends solely on when the Siemens electronic valves and isolation valves as engineered are replaced. As stated, the "C" building air-cooled chiller must be replaced first in order to allow chilled water flow and uninterrupted cooling to continue.
END OF AMENDMENT 0008
(End of Summary of Changes)
File details come from the government source that posted it.