AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BID-BUILD SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO
WASHINGTON, D.C., MARYLAND AND VIRGINIA
The purpose of this amendment is to provide the follow ing:
1. Responses to RFIs
2. Additional information for the Pre-proposal conference and site visit
Proposal due date/time remains unchanged.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0007
X 9B. DATED (SEE ITEM 11)
26-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2018
CODE
NAVAL FACILITIES ENG COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION
SUMMAR
SECTION
The follow
AMEN
DESIGN-B
NEW CO
WASHING
D.C., MAR
The purpos
1. Respon
2. Additio
Proposal d
All other te
15. Are jo the tec
Respo
16. It’s as securit use. Pl
Respo throu issued
17. On RF locatio panel
18. Please Total to for
19. Please paragr
SF 30 BLOCK
RY OF CHAN
SF 30 - BLO
wing have been
NDMENT 000
BID-BUILD
ONSTRUCTIO
GTON AREA
RYLAND AN
se of this amen nses to RFIs onal informatio due date/time re erms and cond oint venture ag chnical proposa onse: No, thes sumed that dur ty reasons. We lease confirm?
onse: NRL st gh security. T d via an amend
FP Drawing E-on for a homeru onse: Use pan LUE22. Prov e refer to RFP Building Com a Design/Build onse: Specific e refer to RFP R raph 1.3 AISC
K 14 CONTIN
NGES
CK 14 CONTI
n added by full
SMALL BUS
ON, REPAIR
A OF RESPO
ND VIRGINIA
ndment is to pr n for the Pre-p emains unchan itions remain u greements and al?
se documents d ring the Pre-Pr e request the G taff will have There are no g dment.
-101, Replace E
un. However, t nel LUED3, lo vide circuit bre
Replace Elect missioning. Pl d project?
ation applies.
Replace Chille C Quality Cer
NUATION PAG
INUATION PA
text:
SINESS MUL
R, AND REN
ONSIBILITY
A rovide the follo proposal confer nged.
unchanged.
Resp related mento do not count t roposal site vis Government tak a camera an guarantees th
Electrical Cont this panel is no cated on the t eaker in existi trical Controls lease confirm i ers Buildings 2 rtification. Giv
GE
AGE
LTIPLE AWA
NOVATION O
INCLUDING
owing:
rence and site v ponses to RFIs or-protégé mate toward the 30 sit the Offerors ke and provide nd can take a hat security w trols and Switc ot shown anyw third floor, as ing space and and Switches if this specifica
10D and 210C ven the metal
ARD CONST
OF VARIOU
G BUT NOT L
visit s erials counted page limit.
s will not be pe e photographs limited numb will release any ches Building 2 where. Please ad the power so label accordin
Building 210 ation section p
C, Specification scope of wor
TRUCTION C
US FACILITI
LIMITED TO
against the 30 ermitted to take on behalf of t ber of photos y/all. Once re
210, Panel LU dvise.
urce for circu ngly.
Specification pertains to this n Section 05 12 rk involved w
N4008018R
Page
CONTRACT
IES AT NAV
O WASHING
0-page limitati e photographs the Offerors fo
s. These have leased, they w
UE22 is indicate uit GC-11 inst
Section 01 91 project as it ap
2 00 Structural with this projec
R0007
FOR
VFAC
GTON,
ion for due to or their to go will be ed as a ead of
00.15 ppears l Steel, ct, we
N4008018R0007 respectfully request that the Government considers waiving this requirement, thus opening up the competition to metal fabricators that are equally capable. Please advise?
Response: The requirement for the fabricator and/or erector be AISC certified is waived.
20. Please refer to RFP Replace Chillers Buildings 210D and 210C, Specification Section 07 52 00 Modified Bituminous Membrane Roofing, paragraph 1.2. Please provide the existing roofing manufacturers product type and name?
Response: The manufacturer is GAF, and the product according to the warranty is an insulated 4-ply GAFGLAS FlexPly 6, gravel on top in hot asphalt. Warranty is expired.
21. Please refer to RFP Replace Chillers Buildings 210D and 210C. RFP Drawing E-101, Note 6 (EF-33 Combo Starter) directs you to see the Schedule on Drawing E-601. The schedule on E-601 indicates that the Combo Starter for EF-33 is to be installed in MCC-1 in Bucket 16. Drawing E-101 shows the Combo Starter for EF-33 adjacent to EF-33. Please clarify if the Starter to be installed in the MCC or is it to be stand alone as indicated on E-101?
Response: Provide Combo Starter installed in MCC-1 in Bucket 16. Provide local disconnect switch at wall mounted location.
22. Please refer to RFP Replace Chillers Buildings 210D and 210C, RFP Drawing E-101, Note 10. Please provide the size of P-8 thru P-10 so that the correct size of their associated Combo Starters can be determined so that the proper labor to install can be applied as well as the correct sizing of the conduit and wiring.
Response: Pumps P-8 thru P-10 are 20 HP.
23. Please refer to RFP Replace Chillers Buildings 210D and 210C. RFP Drawing E-101, Note 2 calls for branch wiring from the Chiller to the Controller. Drawing M-601, Water Cooled Chiller Schedule Note B indicates that the unit is to be provided as Single Point Connection. With that being said, and adding to it that the Controller appears to be integral to the unit, is Note 2 even necessary? Please clarify.
Response: Controller is integral with equipment. Additional controller is not necessary.
24. In conjunction with the above RFI, to expand on Note 3, if the unit truly is being provided as directed on M- 601, is there a need for the 400A Disconnect Switches as indicated on the Motor & Equipment Schedule on Drawing E-601? Please clarify.
Response: Provide 400A Disconnect switch on U-channel supports.
25. Please provide circuiting information (what panel) for the new SS-1, no information is provided. Drawing ED- 101/E-101 Notes 5 & 10 respectively says to reuse existing conduit/wire. This can't be done as per Drawing E- 101; the Combo Starters are being reinstalled in a different location. Please clarify.
Response: Disconnect and remove existing conduit and conductors back to source. Provide SS-1 Combo Starter in Cubicle 14 of MCC-1. Provide conduit and conductors sized per motor and equipment schedule.
26. Please refer to RFP Replace Chillers Buildings 210D and 210C. RFP Drawing ED-102 and E-102 both show a 24x24x12 box. Please clarify if this box is existing as shown on ED-102 or are we to provide it as shown on E- 102? Please clarify.
Response: Provide 24x24x12 pullbox per E-102.
27. Do we need to submit bid guarantee for entire MACC contract or only for seed project task order?
28. Page detaile remov
29. Page narrati identif Evalua inclusi
30. Evalua not req
31. If plan the ha
32. Attach but on constr criteri
33. For th partne
All pe where audito
All co throug
Acces reques
Please
Site vi onse: Bid gua
10 of 159 sta ed art work, o vable pages be onse: 3-ring b
12 of 159, Fac ive is required fied within the ation. Please c ions or limitati onse: Safety n ation of Offere quired to be su onse: See RFI nning to submi rd copies and C onse: See RFI hment C: Cons n page 10 Fact ruction projects onse: Each Of
ia. See revised he three releva er/sister compan onse: See eval
Add ersonnel attend the Governm orium.
ontractor perso gh on 3-20-18.
s to NRL is n st.
e make advance isit will follow rantee is for t ates “Staples o or other embel considered acc binder is accep ctor 2: Safety, d from a join e item, nor is th clarify whethe ions (such as p narrative is no er’s overall saf ubmitted as wel
I # 29 response it our Price Sch CD submission
I # 13 response struction Exper tor 1: Construc s in order to be fferor SHALL d Constructio ant projects, w ny if the teami luation criteri ditional inform ding the site v ent will kick-o onnel must bri not guaranteed e arrangements w the pre-propo he seed projec or other bindin llishments are ceptable in ord ptable. See Pr item (i) Solic nt venture. Ho he evaluation o er or not a sa age limit, etc.)
ot required.
fety record bas ll as part of Fac e.
hedule via Safe n?
e.
rience Form sta ction Experien e considered. P
L submit a TO on Experience will we be con ing partner/sist a.
mation for the isit will meet off and brief a ng their origin
d. NRL Secu s and expect de sal conference ct.
ng shall not b unnecessary a er to organize roposal Organ citation Submit owever, there of the narrative afety narrative sed on TRC an ctor 2: Safety.
fe Access File E ates that the Of nce states that t lease confirm t
OTAL OF THR
Form.
nsidered accep ter company w
Pre-Proposal at NRL Build all personnel.
nal Open Fox urity will cond elays of up to t with the follow be used. Elabo and are not de the response?
nization and F ttal Requireme are no reque e discussed in e is required, nd DART rates
Exchange, may fferer is requir the Offerer is that a total of 3
REE (3) const ptable if we ut as the prime co l Conference a ding 226 at 10 The meeting w
Vetting Form duct backgroun two hours.
wing special in orate brochure esired.” Will a
Format.
ents indicates ested inclusion Factor 2: Safe and if so, are
s. Please confir y we omit the red to submit a required to su
3 projects is re truction proje tilize the expe ontractor on th and Site Visit
:00 AM EST
will be conduc ms with them, nd checks as a nstructions:
N4008018R
Page s or documen a 3-ring binde that only one ns for this nar ety, item (ii) Ba e there any sp rm that a narra
Price Schedule a total of six pr ubmit a total of quired.
ects. See evalu erience of a te he project?
on March 20, cted in Buildin the day of the a part of the
R0007 ntation, er with safety rrative asis of pecific ative is e from rojects, f three uation eaming
2018, ng 226 e walk access
N4008018R0007
1. Due to the nature of the work in Bldg 210 the visitors will tour only the roof and mechanical space (on the
4th floor). Small groups (not to exceed 15) will be escorted by NRL personnel. KTRs in each group are required to stay together. Stragglers found wondering beyond the escorted group will removed from the building and possibly off the NRL installation.
2. Visitors will be checked in at the Bldg 210.
3. KTR personnel will NOT be allowed to have cell phones in their position beyond point of entry. Cameras are NOT allowed on the NRL installation. There are lock boxes at the entry point for cellphones, but there is not sufficient capacity to accommodate the KTRs. Therefore, KTRs should leave cell phones in their automobiles.
4. NRL staff will have a camera and can take a limited number of photos. These have to go through security.
There are no guarantees that security will release any/all. Once released, they will be issued via an amendment.
END OF AMENDMENT 0003