18R0007_Amendment_0002.pdf
PDF 46 KB Posted
- Solicitation number
- N4008018R0007
About this file
18R0007_Amendment_0002.pdf
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5170338
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DESIGN-BID-BUILD SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO
WASHINGTON, D.C., MARYLAND AND VIRGINIA
The purpose of this amendment is to provide the follow ing:
1. Responses to RFIs
2. Updates to Seed Project’s Specification and Draw ings
Proposal due date/time remains unchanged.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0007
X 9B. DATED (SEE ITEM 11)
26-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Mar-2018
CODE
NAVAL FACILITIES ENG COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION
SUMMAR
SECTION
The follow
AMEN
DESIGN-B
NEW CO
WASHING
D.C., MAR
The purpos
1. Respon
2. Updates
Proposal d
All other te
3. Regard Amen
Respo updat
4. The so form d first pa
5. Will y
6. Will y
7. Will th consid
8. Will th
SF 30 BLOCK
RY OF CHAN
SF 30 - BLO
wing have been
NDMENT 000
BID-BUILD
ONSTRUCTIO
GTON AREA
RYLAND AN
se of this amen nses to RFIs s to Seed Proje due date/time re erms and cond ding the Pre-P dment 0001, p onse: Base Sp te and resubm olicitation, pag doesn’t addres aragraph. Can onse: Refer to you accept CCA onse: Yes.
you accept prev onse: Yes.
he Past Perform der removing th onse: Past Per he cover letter, K 14 CONTIN
NGES
CK 14 CONTI
n added by full
SMALL BUS
ON, REPAIR
A OF RESPO
ND VIRGINIA
ndment is to pr ect’s Specificat emains unchan itions remain u
Proposal site co lease advise w ponsor for this mit the Vetting ge 12 & 13 of s EMR rating n you please ad o evaluation cr
ASS reports in viously prepare mance pages (C hem from the p formance pag
, title page and
NUATION PAG
INUATION PA
text:
SINESS MUL
R, AND REN
ONSIBILITY
A rovide the follo tion and Drawi nged.
unchanged.
Resp onference/visit who we should n s site visit is M forms with th
159, it discus of give you a ddress this situa riteria.
lieu of CPARS ed PPQs from o
CPARS, PPQs, page limit.)
ges are include d table of conten
GE
AGE
LTIPLE AWA
NOVATION O
INCLUDING
owing:
ings ponses to RFIs t, when comple name as the ba
Mr. Bill Robso his latest infor ses all the requ section to ins ation?
S?
our clients?
, etc.) count tow ed in the page nts count towa
ARD CONST
OF VARIOU
G BUT NOT L
s eting the provi ase sponsor and on and phone rmation.
quirements for sert your safety ward the Techn e limit count.
ard the page lim
TRUCTION C
US FACILITI
LIMITED TO
ided vetting fo d at which pho number is 20 the Safety. A y narrative tha nical proposal mit?
N4008018R
Page
CONTRACT
IES AT NAV
O WASHING
orm issued as p one number?
02-767-4546. P
Attachment D, at’s referenced page limit? (P
R0007
FOR
VFAC
GTON,
part of
Please
Safety in the
Please
9. Sectio
ALTE
"...larg guaran
ALTE
amoun
Questi
10. Factor “A co below modify projec projec
11. The of $15,00 reason range.
with th
12. Solicit where
13. Please withou
RFP.
14. The R are an solicit
Respo solicit accord this nu onse: No, they on 5252.228-93
ERNATE I – A
gest amount fo nteed minimum
ERNATE II - A
nt for which aw ion: Please con onse: Yes, that r 1 Constructio nstruction proj this stated dol fying it to state cts slightly abo cts anticipated f onse: The fact fferor is to sub 00,000. A ran n most small b Would NAV he ROM for th onse: See RFI tation page 19 as page 1 of 15 onse: For Pric e confirm it is ut the Total pri onse: Yes, as
RFP states this nticipated. Plea tation?
onse: The G tation to the dance with th umber if the C y do not count
302 Bid Guaran
As prescribed in r which award m".
As prescribed in ward can be ma nfirm there are t’s correct.
on Experience s ject with a fin llar range will e, “Projects su ve the $15M m for this MATO tor remains un bmit a total of t nge of this size businesses are VFAC consider he seed project
I # 10 response of 159, Volum 59, Block 13, s ce Proposal, O acceptable to ice included/en long as the co contract provi ase advise how
Government in responsible o he factors in t Contracting O t toward the p ntee (page36 o n 28.101-2-100 can be made..
n 28.101-2-100 ade..." in the ba no alternates f states that proj al contract val not be conside ubmitted below mark may still
OC.
nchanged.
three construct e suggests that not routinely r adjusting thi which is also $ e.
me 2: Price Pr states original a
Offeror shall su submit a Price ntered?
ompleted Pric des for the aw w many DDB ntends to aw offerors whos the solicitation
Officer determ page limit.
f 159) of the R
0(a)(2), for inde .." in the basic
0(a)(3), for requ asic provision w for this Seed pr jects submitted lue of $2,000,0 ered relevant.”
w this stated d be highly rele ion projects wh this procurem completing pr s range to $1, $1,000,000 - $5 roposal states, and 2 copies. P ubmit one ori e Proposal CD-e Schedule is ward to multipl SB MACC co ward approxim se proposals r
n. However, mines it to be in
RFP states;
efinite quantity c provision with quirements solic with "...price p roject.
d need to meet 000 to $15,000 ” Please consid dollar range wi evant in terms o hose final cont ment is geared rojects whose 000,000 - $5,0 5,000,000.
Offeror shall Please confirm iginal and one
-ROM, with th submitted as e awardees bu ontracts NAVF mately six (6 represent the the Governm n the best inte y and JOC cont h "...price paya citations, repla payable for the the following 0,000. Projects der deleting the ill not be cons of the scope an tract value is b for large busin value is at th
000,000? This submit one or only one copy e copy.
he SEED Proje instructed in ut does not stat FAC anticipate
6) contracts r e best value a ment reserves t erest of the Go
N4008018R
Page tracts, substitu able for the con ace "...largest estimated qua dollar value cr s submitted ab e second sente sidered relevan nd complexity between $2,000 nesses as it sta he higher end s range is con riginal and one y is required?
ect’s Price Sch according wi te how many a es awarding fo resulting from after evaluati the right to c overnment.
R0007 ute ntract antity".
riteria, ove or ence or nt,” as of the
0,000 -ands to of the nsistent e copy hedule, ith the awards for this m this ion in change
N4008018R0007
Updates to Seed Project’s Specification and Drawings NRL 210 Replace Chillers Electrical Controls and Switches
SPECIFICATIONS:
1. Section 05 12 00: Added reference to galvanized grating and guard/hand rails.
DRAWINGS:
1. S-001 Structural Notes: Added Unified Facilities Criteria to Note A (Codes, Standards, and References).
2. S-001 Structural Notes: Add galvanized grating as Note G.4.
3. S-101 Building 210C Existing Dunnage Framing Plan: Clarified Plan Note 2 that the grating is galvanized.
ATTACHMENTS:
1. Attachment 7 CLIN 0001 Structural Steel 05 12 00 with Revision 1 – flatF with noted changes.
2. Attachment 8 CLIN 0001 13097554 S101 R1 Drawings S-001 with noted changes and
3. Attachment 9 CLIN 0001 13097554 S001 R1with noted changes.
ADDITIONAL DOCUMENTS CAN BE FOUND BY CLICKING ON “Click here for Additional Documents”
ON NECO WEBSITE.
END OF AMENDMENT 0002
(End of Summary of Changes)
File details come from the government source that posted it.