About this file

This amendment to a solicitation provides responses to contractor questions and increases the page limit for the management approach section of proposals. The solicitation is for construction services for specialized antennas, towers, and communication facilities for the Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) worldwide. The work involves requirements support for structural, mechanical, utility, and related requirements for building, repairing, and modifying Naval communications facilities for the Navy and Marine Corps. The North American Industry Classification System code is 237130, and the annual size standard is $39.5 million. NAVFAC EXWC intends to award an indefinite delivery, indefinite quantity multiple award construction contract with a maximum value of $99 million over a five-year base period and a six-month extension. The estimated award date is 28 July 2023.

View the file

Other files

File Type Posted
N3943022R2407 Amendment 0017.pdf PDF
N3943022R2407 Amendment 0016.pdf PDF
N3943022R2407 Amendment 0015.pdf PDF
N3943022R2407 Amendment 0014.pdf PDF
N3943022R2407 Amendment 0013.pdf PDF
Attachment R. PACNORWEST_Mt Octopus Tower (v1.2 2017-10-12).pdf PDF
N3943022R2407 Amendment 0012.pdf PDF
Amendment 0011_Attachment A - List of Tower Maintenance and Repair Tasks.pdf PDF
N3943022R2407 Amendment 0011.pdf PDF
N3943022R2407 Amendment 0009.pdf PDF
Amendment 0008. Attachment Q. Navy Dare Drawings.pdf PDF
Amendment 0008_Attachment A - List of Tower Maintenance and Repair Tasks.pdf PDF
N3943022R2407 Amendment 0008.pdf PDF
Attachment P. FY23 TAC Tower Repairs.zip ZIP file
N3943022R2407 Amendment 0007.pdf PDF
N3943022R2407 Amendment 0006.pdf PDF
Attachment O. NAS Fallon - Tower Bldg 465.pdf PDF
Attachment Q -Solicitation N3943022R2407 - Pre-Proposal Conference-Meeting Minutes.doc DOC document
Attachment O - Solicitation N3943022R2407 - Pre-Proposal Conference.pdf PDF
Attachment P - Visitor Map Churchill Ave scale7200 20200108geo.pdf PDF
N3943022R2407 Amendment 0005.pdf PDF
N3943022R2407 Amendment 0004.pdf PDF
N3943022R2407 Amendment 0003.pdf PDF
N3943022R2407 Amendment 0002.pdf PDF
N3943022R2407 Amendment 0001.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide responses to RFIs received in response to the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Feb-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3943022R2407

X 9B. DATED (SEE ITEM 11)

21-Dec-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Feb-2023

CODE

NAVFAC EXWC

1100 23RD AVE BLDG 1100

PORT HUENEME CA 93043

N39430 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3943022R2407

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0010

The following Requests for Information (RFIs) and associated Government responses and hereby incorporated into the solicitation:

No. Reference Question Answer 0042 Attachment P. FY 23 TAC

Tower Repairs The attachment P, a ZIP file, cannot be opened or read in the format provided.

Please provide a file format that can be opened and read.

Contractors will need to unzip the zip file, and open the .kmz file in Google Earth.

0043 The page limits for Factor 2 – Management Approach

Section of the Request for Proposal: 00 20 00, 5(i) & Attachment B

Paragraph: 00 20 00, 5(i) & Attachment B

Page Number: 13

The total page count for this section of the RFP response (including Attachment B) is 6 pages. We believe this is insufficient and should be increased to allow offerors to adequately address the evaluation factors for this section.

Will NAVFAC please increase the number of allotted pages for the Factor 2 response to 10 pages?

The request to increase the number of alloted pages for the Factor 2 response from 6 pages to 10 pages is approved.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .