This amendment to a solicitation provides responses to contractor questions and adds clauses to the document. The solicitation is for construction services for specialized antennas, towers and communication facilities for the Naval Facilities Engineering and Expeditionary Warfare Center worldwide. Work includes requirements support for structures, mechanics, utilities and modifications for Navy and Marine Corps communications facilities. The North American Industry Classification System code is 237130. The contracting agency intends to award an indefinite delivery, indefinite quantity multiple award contract with a base period of five years and an optional six-month extension. Individual task orders will be firm fixed price. The minimum guarantee on each contract is $5,000 to be issued concurrently with base contract awards. The estimated award date is July 2023 and the maximum contract value is $99 million, replacing an existing contract awarded in October 2017.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to RFIs received in response to the solicitation. Additionally, this amendment adds tw o clauses to the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3943022R2407
X 9B. DATED (SEE ITEM 11)
21-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jan-2023
CODE
NAVFAC EXWC
1100 23RD AVE BLDG 1100
PORT HUENEME CA 93043
N39430 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3943022R2407
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0009
The following Requests for Information (RFIs) and associated Government responses and hereby incorporated into the solicitation:
No. Reference Question Answer 0037 Part 3 Statement of Work/
Section 3.0 pg. 7
Part 3 Statement of Work/
Task Order. Attachment E.
Code 400 Barge Operations SOP/ Section Safety pg 6
1. Is this a Navy supplied barge for equipment and materials?
2. Is there a cost associated to the contractor for this barge?
3. Will NAVFAC also provide the tractor and fork‐lift, or just the drivers?
4. Will there be a delay from staging to shipping to the island?
If so, please indicate the delay time frame.
1. The barge is a Navy dedicated barge to San Clemente Island for transportation of equipment and materials.
2. There is no cost to the contractor to use the barge.
However, contractor must coordinate with SPOC prior to mobilization. Final list of materials and equipment must be submitted to SPOC at least 3 weeks prior to expected mobilization.
3. NAVFAC will not provide transportation support for this project (Barge is operated by
NAVAIR).
Refer to Part 3 of the RFP, pg.7, section Access to San Clemente Island (Materials/Equipment/Vehicles):
"Contractor is responsible to load and unload materials and equipment on and off the barge." Contractor must provide personnel and equipment required to load and offload materials/equipment from the barge. Contractor will be required to be present at San Clemente Island to receive and offload shipment at the island.
4. The location of San Clemente Island makes it easily accessible by barge. Weather delays are
5. Will there be bio‐security requirements for going to this island?
uncommon. Delays typically range from a day to two days.
Most weather delays occur during winter months.
For reference; southern California has been experiencing an uncommon series of storms during the month of January, 2023, including a 50‐year storm.
The barge to SCI experienced a highly‐unusual delay of two weeks during the storms.
Schedule should provide any weather delays assumed by the contractor.
5. No. However, contractor must adhere to the San Clemente Island Barge Operations document in Attachment E of the RFP.
0038 Part 3 Statement of Work 1. Is there a gas station on the island?
1. There is regular gasoline and diesel available at San Clemente Island. However, contractors must have in place a Fuel Purchase Authorization (FPA) with Defense Logistics Agency Energy (DLAE), in order to access fuel at SCI. The process to establish an FPA is as follows:
a. Fill in and submit document FAR Part 51 US Government Contractor Fuel Purchase Authorization (will be provided at award).
b. Contracting Officer must submit FAR Part 51 to DLAE along with an authorization letter prepared by the Contracting Officer.
c. DLAE will verify that contractor does not have past due balances (90 days or more) on any other DLAE accounts (Contractors may have more than one DLAE accounts under separate contracts, clients, commands, etc.) before a new account can be established.
d. After the FPA is established, contractor must obtain VIL key for vehicles and/or an fuel
2. Will the gas station require DAL submittal processes?
3. What type of fuel is available?
account for equipment from San Clemente Island fuel department.
Contractors should assume that this process will take at least 30 days and should submit the documents right after the task order is awarded.
2. Yes. See response above.
3. Regular unleaded gaslone and diesel are available at San Clemente Island. See response above for requirements to access fuel at SCI.
0039 Part 3 Statement of Work 1. Please supply the structural drawings and calculations for Bogue Field and Navy Dare?
1. No structural drawings or calculations are available for the Bogue Field and Navy Dare towers. Attachment P. Navy Dare drawings, provides general information for Navy Dare tower (Contractor is responsible to field verify all tower information provided).
Contractor will be responsible to map, and conduct structural analysis as required to complete all portions of the task order.
0040 Part 3 Statement of Work 1. Is this a Navy supplied/contracted transportation for personnel?
2. Is there a cost associated to the contractor for this transportation?
3. Can civilian aircraft land at the island? If so, will a Civil Aircraft Landing Permit be required?
4. Will the contractor be able to apply/receive a weight limit exception on the Navy transport?
1. Shuttle flights to SCI are provided by NAVAIR.
2. There are no costs associated with air transportation from San Diego North Island to San Clemente Island to the contractor.
3. No. This task order does not warrant the use of a private airplane.
4. The contractor may submit request for a waiver for overweight luggage up to two weeks in advance. Contractor will receive approval as soon as the request is submitted.
Overweight luggage must not exceed dimensions of 4'x2'x2'.
Contractor must submit request via email to the COR.
Overweight luggage must comply with TSA guidelines.
0041 Attachment H‐ Schedule_of_Fully_Loaded_Fi rm_Fixed_Price_Rates Tabs ‐ Ordering Year 1‐5
Reference: Labor Category:
"QP5 Coating Inspector" RFP Language: Labor Category: "QP5 Coating Inspector"
On each of the Ordering Year tabs in the worksheet, a “QP5 Coating Inspector” is listed in the Labor Category section – which would suggest that it is expected that this position would be an employee.
QP5 refers to a certified inspection company as noted in Attachment H_UFGS_09_97_13_25. Section
1.14.6.3 is titled “Qualifications of Coating Inspection Company”:
“Submit documentation that the coating inspection company performing all coating inspection functions is certified by SSPC to the requirements of SSPC QP 5 prior to contract award. The approved coating inspection company shall not be changed through the completion of the contract.” Per the RFP, Pg. 60, it does note that the “QP5 Coating Inspector shall be a direct hire of the Prime Contractor” (QP‐5 also referred to in Part 3). It is our understanding that whenever required by a Task Order, the QP5‐ certified inspection company must be hired directly by the Prime contractor, and the QP5‐certified inspection company will then provide the appropriately certified inspector(s) for the job (certified as PCI‐2 or 3, NACE Level 2 or 3, etc..)
We do not believe that it is possible for a Prime contractor to have an employee who is a “QP5 Coating Inspector”. Please clarify this requirement in Attachment H.
QP5 must work directly for the Prime Contractor. The intent of the RFP is to require the Prime Contractor to hire a 3rd party AMPP/SSPC QP5 Certified inspection firm to provide an inspector that does not work for, and is separte from, contractor or subcontractor performing coating work.
Furthermore, the goverment must maintain the ability to contact the AMPP/SPPC QP5 inspector directly, and be included in the inspector's reports distro.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
52.251-1 Government Supply Sources APR 2012 252.251-7000 Ordering From Government Supply Sources AUG 2012
(End of Summary of Changes)