RFC_10&18-29.docx
DOCX document 21 KB Posted
- Attached to
- USS EMORY S LAND (AS-39) Regular Overhaul/Dry Docking Federal contract opportunity
- Solicitation number
- N3220520R6501
About this file
This document contains a series of requests for clarification and answers regarding a solicitation for the regular overhaul and dry docking of the USS Emory S Land. The solicitation was issued by the Department of the Navy Military Sealift Command for work items including installation of thermowells, terrazzo repair, replacement of firemain piping, inspection of steam pipes, structural repairs, and installation of fixed ballast. The requests seek clarification on technical requirements, quantities, materials, and locations for the work items in order to develop bids. The answers provide additional details, references, and revisions to help resolve discrepancies in the specifications.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION #10 (revised)
SPECIFICATION ITEM NO.: 0523
PARAGRAPH / SECTION NO: 2.1 & 7.2.1
TITLE: Thermowells Install (VR19-0051)
QUESTION:
This work item describes the requirement to install thermowells in the condenser inlet and outlet pipes.
Reference 2.1 S9516-AA-MMO-000, Ship’s Stores Refrigeration Plant is the tech manual which does not address the condenser inlet and outlet piping. The tech manual page 1-3 addresses only thermometers for the Freeze Room, Chill Room, Compressor Suction and Suction Discharge. No Piping.
Is there a drawing available that addresses the condenser inlet and outlet pipe so we can determine thermowell and thermometer sizes, material and installation location in the pipes per the specification?
ANSWER: Install the standard Navy style 'lollipop' thermometers on the SW Inlet & Overboard for each of the three (3) reefer plants. These would be installed in a dry well fitting, should be welded directly to the pipe (CUNI 5").
REQUEST FOR SPECIFICATION CLARIFICATION #18
SPECIFICATION ITEM NO.: 0602
PARAGRAPH / SECTION NO: 7.2 thru 7.2.4.2_+ Enclosures 2.3 + 3.1 TITLE: MSC and Navy Berthing Terrazzo Repair
QUESTION: Emory Land work item 602 paragraphs 7.2 thru 7.2.4.2 calls for sand and reseal of existing Terrazzo. Enclosure 2.3 of specification calls for Terrazzo replacement in vestibule and Laundry. 3.1 References Location: Navy and MSC Berthing
Please conform locations and repair as this is conflicting.
Sand and reseal, or replacement of the terrazzo?
ANSWER: Attached Revised WI
REQUEST FOR SPECIFICATION CLARIFICATION #19
SPECIFICATION ITEM NO.: 0525
PARAGRAPH / SECTION NO: 7.2
TITLE: NSF Firemain Piping Replace
QUESTION: The pipe location for removal and reinstallation within the space is not identified. The specification states to renew 2 feet of 4” CUNI pipe using drwg ref in 2.0, which are all diagrams and do not identify location or fittings as there are no Bill Of Materials provided only Schedule of Materials, Para 7.2.2 states to reinstall the pipe using new gaskets and 316 CRES hardware, From the above statement is the contractor to assume this is a straight piece of 4” CUNI pipe that is flanged and bolted into the pipe system and will require no hot work on the vessel for removal and installation? If this is so, it can be built in the shop with only a shop hydro required?
ANSWER: Revised WI
REQUEST FOR SPECIFICATION CLARIFICATION #20
SPECIFICATION ITEM NO.: 0127
PARAGRAPH / SECTION NO: 1.1, 3.1, 3.2, 7.2.1.1, 7.2.1.2
TITLE: 02 Level Underdeck T-Beam Stiffeners Repair
QUESTION: 1.1 This item describes the renewal of 02 Level Underdeck T-Beam stiffeners. 3.1 02 Level Port Side Underdeck Longitudinal and transverse T-Beam stiffeners Frame 47-80 outboard. 3.2 Quantity: Approximately 300 Linear Feet of steel plate. 7.2.1.1 Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 300 square feet of steel plate to dealt with. 7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
Please clarify if the GOV’T is requesting pricing for:
3.2 300 Linear feet of steel plate (Underdeck Longitudinal and transverse T-Beam stiffeners)?
7.2.1.1 Crop out deteriorated steel as marked. Steel plate and shapes 300 square feet of steel plate to dealt with.
Is this to address 300 square feet of steel plate AND 300 Linear Feet of steel Plate (Underdeck Longitudinal and transverse T-Beam stiffeners)?
ANSWER: Revised WI to reflect 300 linear feet on para. 7.2.1.1
REQUEST FOR SPECIFICATION CLARIFICATION #21
SPECIFICATION ITEM NO.: 0128
PARAGRAPH / SECTION NO: 1.1, 3.1, 3.2, 7.2.1.1, 7.2.1.2
TITLE: 01 Level Underdeck T-Beam Stiffeners
QUESTION: 1.1 This item describes the renewal of 01 Level Underdeck T-Beam stiffeners. 3.1 01 Level Port Side Underdeck Longitudinal and transverse T-Beam stiffeners Frame 115-121 outboard. 3.2 Quantity: Approximately 100 Linear Feet of steel plate. 7.2.1.1 Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 100 square feet of steel plate to dealt with. 7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
Please clarify if the GOV’T is requesting pricing for:
3.2 100 Linear feet of steel plate (Underdeck Longitudinal and transverse T-Beam stiffeners)?
7.2.1.1 Crop out deteriorated steel as marked. Steel plate and shapes 100 square feet of steel plate to dealt with.
Is this to address 100 square feet of steel plate AND 100 Linear Feet of steel Plate (Underdeck Longitudinal and transverse T-Beam stiffeners)?
ANSWER: Revised WI to reflect 100 Linear Feet in para. 7.2.1.1
REQUEST FOR SPECIFICATION CLARIFICATION #22
SPECIFICATION ITEM NO.: 0123
PARAGRAPH / SECTION NO:3.2, 4, 7.2.7
TITLE: Fixed Ballast Install
QUESTION: 3.2 Item Description/Manufacturer's Data - Bill of Materials (BOM) - SEE COMPLETE LIST IN REFERENCE 2.1.3
2.1.3 MSC Drawing No. 191-8613455, Permanent Lead Ballast Installation, Tanks (8-50-1) and (8-50-2) This DWG on Page 2 of 11 Item 07 states the Lead is GFM 1,086,400#
4 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
7.2.7 Install the lead ballast containment structure, rubber and the contractor furnished 485 long tons of lead ingots in phases per the recommended procedure in Reference 2.1.3.
Please confirm if the Lead Ballast is CFM or GFM
ANSWER: Lead Ingots are CONTRACTOR FURNISHED MATERIALS as per the WI. Disregard ITEM 07 of the DWG.
REQUEST FOR SPECIFICATION CLARIFICATION #23
SPECIFICATION ITEM NO.: 0602
PARAGRAPH / SECTION NO: 7.2 thru 7.2.4.2_+ Enclosures 2.3 + 3.1 TITLE: MSC and Navy Berthing Terrazzo Repair_______________
QUESTION: Previously asked:
Emory Land work item 602 paragraphs 7.2 thru 7.2.4.2 calls for sand and reseal of existing Terrazzo. Enclosure 2.3 of specification calls for Terrazzo PRC replacement in vestibule and Laundry. 3.1 References Location: Navy and MSC Berthing Please conform locations and repair as this is conflicting.
Sand and reseal, or replacement of the terrazzo? PRC?
Additional question:
Enclosure 2.3 SHOWERS AND HEAD TERRAZZO Replace The below estimates are linear measurements of PRC decking areas that will need to be replaced with new PRC.
Item No Compartment Remarks Width Feet Length Feet 1 2-143-0-Lvestibule Terrazzo Replace 5' 6' 2 3-54-1-Q Crew's Laundry Terrazzo Replace 20' 17
Contractor notes:
Specification states Terrazzo 2.3 mentions PRC?
REQUEST FOR SPECIFICATION CLARIFICATION #24
SPECIFICATION ITEM NO.: 021
PARAGRAPH / SECTION NO: 7.3
TITLE: Clean Gas Free Tanks Voids and Cofferdams
QUESTION: Please provide type of fuel oil to be stored for this avail.
ANSWER: DIESEL FUEL MARINE (DFM)
REQUEST FOR SPECIFICATION CLARIFICATION #25
SPECIFICATION ITEM NO.: 0108
PARAGRAPH / SECTION NO: 2.1 & 3.0
TITLE: _Main Deck Structural Repiar (ABS)
QUESTION: Provided references do not provide details required for pricing the steel replacement listed in section 3.0.
Please provide scantling drawings for areas of repair.
ANSWER: Work Item revised to provide guidance drawings for existing structure.
REQUEST FOR SPECIFICATION CLARIFICATION #26
SPECIFICATION ITEM NO.: 284
PARAGRAPH / SECTION NO: 7.2.1.4, 7.2.1.5 and 7.2.1.6
TITLE: _ AS_CSI_STEAM PIPE INSPECTION & HYDROSTATIC TEST
QUESTION: Please clarify which is the correct number of shots in items listed below:
7.2.1.4. Provide two hundred (300) shots on the main steam system.
7.2.1.5. Provide five hundred (300) UT shots
7.2.1.6. Provide five hundred (200) UT shots
ANSWER: (Answer pending)
REQUEST FOR SPECIFICATION CLARIFICATION #27
SPECIFICATION ITEM NO.: Multiple 0100’s WI’s PARAGRAPH / SECTION NO: RFP Page 55 of 67 TITLE: Request for Photographs
L-5 INSPECTION OF VESSEL / PRE-PROPOSAL CONFERENCE states, “Inspection for the USS EMORY S LAND (AS-39) will take place at the ROK Ammo Base at Chinhae, Korea, 17-23 February 2020. Inspection is not mandatory and shall be at the offeror’s expense”.
Contractor is not able to attend the inspection of the vessel in Chinhae, Korea and notes that there is no specific interference identified in the within the SOW for the following listed (18) Work Items.
· WI’s 0103_A, 0104_A, 0105_A, 0108_A, 0111_A, 0112_A, 0114_A, 0115_A, 0120_A, 0121_A, 0125_A, 0127_A, 0128_A, 0129_A, 0130_A, 0135_A, 0139_A, 0140_A, Contractor notes square footage is given for allowable wastage for estimating, however it is unclear if the square footage all together in each work item or spread out in multiple areas?
QUESTION (1): Can the Customer provide any photographs for the above listed (18) Work Items that may assist bidders in identifying potential interferences in way of wasted steel outlined in these work items?
QUESTION (2): Can the Customer confirm if the square footage are all together in each work item or if spread out in multiple areas?
ANSWER:
Response to Question #1:
WI 0103 Lagging and lights are the interferences WI 0104 Lagging and Overhead lights are interferences WI 0105 Lagging and lights are the interferences WI 0108 Lagging and lights are the interferences WI 0111 Lights and deck plate are the interferences WI 0112 Lagging, vent duct and overhead frame,lagging and lights are interferences WI 0114 Lagging, lights and racks are interferences WI 0015 Lagging and overhead lights are interferences\ WI 0120 Lights and lagging are interferences WI 0121 No interferences WI 0125 Cables, Lights and Portable AC are interference WI 0127 No interferences WI 0128 No interferences WI 0129 No interferences WI 0130 Lagging are interferences WI 0135 Cables, Lights and Portable AC are interference WI 0139 No interferences WI 0140 No interferences Response to Question #2: Square footage are identified in each work item per location.
REQUEST FOR SPECIFICATION CLARIFICATION #28
SPECIFICATION ITEM NO.: 0123_A
PARAGRAPH / SECTION NO: 4 & 7.2.7,
TITLE: Fixed Ballast Install (T-alt 14001R)
Paragraph 4 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES states “None”
Paragraph 7.2.7 states, “Install the lead ballast containment structure, rubber and the contractor furnished 485 long tons of lead ingots in phases per the recommended procedure in Reference 2.1.3”.
Contractor notes paragraph 4, there is stated to be no Government Furnished Materials. In the drawing mentioned in paragraph 2 section 2.1.3 (DWG No. 191-8613455) page 2 lists item no. 6 lead ballast as GFM.
QUESTION: Can the Customer provide clarification as to the disparities regarding if the lead ballast in fact Government Furnished per the drawing or for the contractor supplied as per 7.2.7?
ANSWER: LEAD INGOTS ARE CFM AS PER PARA 7.2.7.
REQUEST FOR SPECIFICATION CLARIFICATION #29
SPECIFICATION ITEM NO.: 0101_A
PARAGRAPH / SECTION NO: 7.1.2.6
TITLE: CHT Tank Preservation (VR18 0094)
Paragraph 7.1.2.6 states, “Coat the surfaces prepared in 7.1.2.4 in accordance with 7.3 for tank interior surfaces and Work Item 903 for the tank exterior surfaces”.
Contractor notes Work Item 903 is a category “B” option item titled “Propulsion Shafting and Bearing Bore Alignment” and is unrelated and has no interface work requirements.
QUESTION: Can the Customer provide clarification as to the disparity regarding paragraph 7.1.2.6 and will an Errata specification be issue?