J-3 Category B Items.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- USS EMORY S LAND (AS-39) Regular Overhaul/Dry Docking Federal contract opportunity
- Solicitation number
- N3220520R6501
About this file
This document contains a contractor price breakdown for Category B items required for the regular overhaul and dry docking of the USS EMORY S LAND (AS-39). The Navy seeks pricing for physical security services, continuation of services, miscellaneous steel and lead abatements, and replacement of various sized metal ventilation ducts. Pricing is requested for labor hours and materials for each line item, with a total proposed price for all Category B items. The solicitation was issued by the Department of the Navy Military Sealift Command for the regular overhaul and dry docking of the USS EMORY S LAND at solicitation N3220520R6501. Interested contractors must submit a use and non-disclosure agreement to receive the work item package and references.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| 25 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 1.3 | ESTABLISH FORCE PROTECTION CONDITION CHARLIE FROM BRAVO | 1 | Days | $ - 0 | |||||||||||
| 1.3 | ESTABLISH FORCE PROTECTION CONDITION DELTA FROM CHARLIE | 1 | Days | $ - 0 | |||||||||||
| 1.3 | MAINTAIN FORCE PROTECTION CONDITION CHARLIE | 10 | Days | $ - 0 | |||||||||||
| 1.3 | MAINTAIN FORCE PROTECTION CONDITION DELTA | 10 | Days | $ - 0 | |||||||||||
| WI 025 SUBTOTAL | $ - 0 |
| 030 | CONTINUATION OF SERVICES | ||||
| 7.1 | Overhaul Management Team | 30 | Days | $ - 0 | |
| 7.2 | General Services For The Ship | 30 | Days | $ - 0 | |
| 7.3 | Telephone Services | 30 | Days | $ - 0 | |
| 7.4 | Project Planning and Monitoring | 30 | Days | $ - 0 | |
| 7.5 | Fire Protection and Ship's Safety | 30 | Days | $ - 0 | |
| 7.6 | Shipboard Access and Security | 30 | Days | $ - 0 | |
| 7.7 | Gas Free Certificates | 30 | Days | $ - 0 | |
| WI 030 SUBTOTAL | $ - 0 |
| 185 | MISCELLANEOUS STEEL RENEWALS | |||||
| Steel Plate | ||||||
| 8.0 | 10.2# ABS Gr. A 1/4" Thk | 50 | 40 lbs | $ - 0 | (2,000 total lbs) | |
| 8.0 | 17.85# ABS Gr. A 7/16” Thk | 9 | 286 lbs | $ - 0 | (2,574 total lbs) | |
| 8.0 | 20.40# ABS Gr A ½” Thk | 22 | 184 lbs | $ - 0 | (4,048 total lbs) | |
| 8.0 | 25.50# ABS Gr. 5/8” Thk | 45 | 230 lbs | $ - 0 | (10,350 total lbs) | |
| 8.0 | 30.60# ABS Gr. ¾” Thk | 45 | 275 lbs | $ - 0 | (12,375 total lbs) | |
| Steel Angle | ||||||
| 8.0 | 2” X 2” X ¼”, 20’ lengths, 49 lbs | 30 | 10 lbs | $ - 0 | (300 total lbs) | |
| 8.0 | 3” X 3” X ¼”, 20’ lengths, 98 lbs | 30 | 20 lbs | $ - 0 | (600 total lbs) | |
| 8.0 | 4” X 4” X ¼”, 20’ lengths, 132 lbs | 30 | 27 lbs | $ - 0 | (810 total lbs) | |
| 8.0 | 4” X 6” X 3/8”, 20’ lengths, 246 lbs | 30 | 50 lbs | $ - 0 | (1,500 total lbs) | |
| WI 185 SUBTOTAL | $ - 0 |
| 603 | LEAD ABATEMENT | ||||
| 3.1 | Overhead surfaces | 1,250 | sq ft | $ - 0 | |
| 3.1 | Horizontal surfaces | 1,250 | sq ft | $ - 0 | |
| 3.1 | Vertical surfaces | 1,250 | sq ft | $ - 0 | |
| 3.1 | Piping of various sizes | 1,250 | sq ft | $ - 0 | |
| WI 603 SUBTOTAL | $ - 0 |
| 801 | MISC. VENT DUCT REPLACEMENT | |||||||
| Interior Duct Size | ||||||||
| 8.0 | Metal duct, 25 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 50 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 100 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 200 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 400 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 600 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 900 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| Trunks/Ducts Exposed to Weather Size | ||||||||
| 8.0 | Metal duct, 100 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 200 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 400 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 600 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| 8.0 | Metal duct, 900 in2 | 60 | 5 LF | $ - 0 | (300 total linear feet) | |||
| WI 801 SUBTOTAL | $ - 0 | |||||||
| 0903 | PROPULSION SHAFTING AND BEARING BORE ALIGNMENT | $ - 0 | $ - 0 | $ - 0 | ||||
| 0904 | STERN TUBE STRUCTURAL REPAIR(ABS) | $ - 0 | $ - 0 | $ - 0 | ||||
| 0951 | DOCKING AND UNDOCKING THE VESSEL | 30 | Days | $ - 0 | $ - 0 | |||
| 0967 | SHAFT ALIGNMENT AND BEARING REACTION CHECKS (SET 3 AND 4) | $ - 0 | $ - 0 | $ - 0 | ||||
| 0968 | SHAFT ALIGNMENT AND BEARING REACTION CHECKS (POST SEA TRIAL) | $ - 0 | $ - 0 | $ - 0 | ||||
| TOTAL ALL CAT 'B' | $ - 0 |
| &14USS EMORY S LAND (AS-39) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N3220520R6501 |
ATTACHMENT J-3