J-7 MSC Ship Repair Facility Survey.pdf

PDF 107 KB Posted

Attached to
USNS JOHN LENTHALL (T-AO 189) FY 21 MTA
Solicitation number
N3220520R4009
Issued by

About this file

This document contains a ship repair facility survey form and details of a related federal contract opportunity for mid-term availability services for the USNS JOHN LENTHALL (T-AO 189).

The ship repair facility survey form requests information from potential vendors on their facility capabilities and capacities. This includes details of building ways, drydocks, cranes, berths, shops, equipment, staffing levels, certifications and prior ship repair work. The related federal contract opportunity is solicited by the Department of the Navy Military Sealift Command for mid-term availability services aboard the USNS JOHN LENTHALL (T-AO 189) in fiscal year 2021. Vendors are instructed to review all attachments for full requirement details. The opportunity type is listed as a solicitation.

View the file

Other files

File Type Posted
J-1 Work Item Index RevC.docx DOCX document
0108_A_Double Bottom Tank Top Steel Replacement.doc DOC document
WI 0090_A_Daily COVID-19 Prevention and Control Services Rev M.doc DOC document
0202_REV B_Port Main_Reduction_Gear_Annual_Inspection.docx DOCX document
J-3 CAT B Items-RevC.xlsx XLSX spreadsheet
J-2 Cat A Items-RevC .xlsx XLSX spreadsheet
J-3 RevB Category B Items.xlsx XLSX spreadsheet
Amendmnet 0008.docx DOCX document
Amendment 0007.docx DOCX document
Amendment 0006.docx DOCX document
WI 509_RevA_Tnk Dck Drain Piping Replace.docx DOCX document
Amendment 0005.docx DOCX document
Work Item Index-RevB 23OCT20.pdf PDF
J-2 Cat A Items-RevB .xlsx XLSX spreadsheet
J-1 RevA WI Index 15OCT20.pdf PDF
Amendment 0004.docx DOCX document
J-2 RevA Cat A Items.xlsx XLSX spreadsheet
New WI 403_ECDIS RADAR REPLACEMENT_13OCT20.docx DOCX document
408 REVA_Antenna Coupler Maint.pdf PDF
Amendment 0003.docx DOCX document
0105_A_Tank Hatch Preservation_RevA.doc DOC document
Amend 0002 20R4009-Update WI.docx DOCX document
0102_A_Degaussing Cable and Conduit Removal_RevA.doc DOC document
Amend 0001 20R4009-Extend.pdf PDF
J-12 Past Performance Data.pdf PDF
J-13 Past Performance Questionnaire.pdf PDF
J-8 Request for Clarification.docx DOCX document
J-10 Interport Differential.pdf PDF
J-4 Gov Furnished Material.pdf PDF
J-14 Technical Non-Disclosure Agreement (NDA).pdf PDF
JA 20R4009_Redacted.pdf PDF
J-1 Work Item Index 08SEP20.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
J-3 Category B Items.xlsx XLSX spreadsheet
J-9 Disclosure Lobbying Activities (SF-LLL).pdf PDF
Solicitatioin 20R4009 - LENTHALL.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-20-R-4009 USNS JOHN LENTHALL (T-AO 189)

ATTACHMENT J - 7 MSC Form 4330/26

SHEET 1 OF 5

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511

SHIPYARD AND ADDRESS SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP

SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH: [ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

DEPTH OF WATER

OVER

WAY END

AT DROP

OFF

NO.

CRANES SERVING WAY

TYPE

LIFT CAPACITY

(std. tons)

CERTIFICATION DATE &

CERTIFIED BY WHOM

TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

IS SNUBBING NECESSARY?

YES NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD: MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)

TYPE

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

WATER DEPTH

(M. L. W.)

IN-

BOARD

OUT-

BOARD

HEIGHT

OF

DOCK

(M.L.W.)

USE

REPAIR/

OUTFIT-

ING

SERVICES AVAILABLE

(use abbreviation of service below)

DOCK

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DRY DOCKS (continued)

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD)

BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:

MSC SHIP FACILITY SURVEY (continued)

PRINCIPAL SHOPS AND BUILDINGS

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

DIMENSIONS OF

SHOP OR BUILDING

LARGEST EXIT

WIDTH HEIGHT

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

SHIPYARD:

MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

CURRENT

CURRENT

SHIFTS

POTENTIAL MAXIMUM

MAXIMUM

NORMAL

NORMAL

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE

LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

File details come from the government source that posted it. Updated .