J-3 Category B Items.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USNS JOHN LENTHALL (T-AO 189) FY 21 MTA
- Solicitation number
- N3220520R4009
About this file
This file contains a spreadsheet with Category B items required for the Mid-Term Availability (MTA) of the USNS JOHN LENTHALL (T-AO 189). The spreadsheet lists over 30 line items grouped into categories such as Physical Security, Vessel Final Cleaning, Continuation of Services, Structural Steel Repairs, and Miscellaneous Piping Replacement. It includes quantities, units, unit pricing, labor hours, material costs, and total pricing for both prime and subcontractors. The Department of the Navy Military Sealift Command solicitation N3220520R4009 seeks these Category B items in support of the MTA for the USNS JOHN LENTHALL, as described in the attachments. Pricing is requested through detailed line items, and the total estimated contract value will be determined by the quantities and pricing offered. Award is expected to be a firm-fixed price contract.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS JOHN LENTHALL (T-AO 189) FY21 MTA | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | UNIT PRICE | TOTAL | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | QTY | UI | UNIT PRICE | TOTAL | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| 7.11 | COST TO ESTABLISH CONDITION BRAVO | 1 | DAY | ||||||||||||
| 7.12 | COST TO ESTABLISH CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 7.13 | COST TO ESTABLISH CONDITION DELTA | 1 | DAY | ||||||||||||
| 7.11 | DAILY RATE TO MAINTAIN CONDITION BRAVO | 1 | DAY | ||||||||||||
| 7.12 | DAILY RATE TO MAINTAIN CONDITION CHARLIE | 1 | DAY | ||||||||||||
| 7.13 | DAILY RATE TO MAINTAIN CONDITION DELTA | 1 | DAY | ||||||||||||
| WI 025 SUB-TOTAL | |||||||||||||||
| 26 | VESSEL FINAL CLEANING | QTY | UI | UNIT PRICE | TOTAL | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| 7.1.1 | PRIOR TO REDELIVERY OF THE VESSEL, THE CONTRACTOR SHALL ACCOMPLISH CLEANING REQUIREMENS ONBOARD THE VESSELUSING REFERENCES 2.1.2 & 2.1.3 AS QUIDANCE | ||||||||||||||
| WI 026 SUB-TOTAL | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | UNIT PRICE | TOTAL | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| 7.1 | PARENT WORK ITEM 010 “OVERHAUL MANAGEMENT TEAM SERVICES”. | 15 | DAYS | ||||||||||||
| 7.2 | PARENT WORK ITEM 011” GENERAL SERVICES FOR THE SHIP” | 15 | DAYS | ||||||||||||
| 7.3 | PARENT WORK ITEM 012 “TELEPHONE SERVICES | 15 | DAYS | ||||||||||||
| 7.4 | PARENT WORK ITEM 013 “PROJECT PLANNING AND MONITORING” | 15 | DAYS | ||||||||||||
| 7.5 | PARENT WORK ITEM 016 “FIRE PROTECTION AND SHIP’S SAFETY” | 15 | DAYS | ||||||||||||
| 7.6 | SHIPBOARD ACCESS AND SECURITY | 15 | DAYS | ||||||||||||
| 7.7 | PARENT WORK ITEM 020 “GAS FREE CERTIFICATES” | 15 | DAYS | ||||||||||||
| WI 030 SUB-TOTAL | |||||||||||||||
| 101 | STRUCTURAL STEEL REPAIRS | QTY | UI | UNIT PRICE | TOTAL | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| 7.1.1 | Structural steel plate | 10,000 | lb | ||||||||||||
| 7.1.2 | Rolled structural shapes | 5,000 | lb | ||||||||||||
| 7.2.1 | 6” long or less cracked fillet welds | 50 | EA | ||||||||||||
| 7.2.2 | 7”-12” long cracked fillet welds | 50 | EA | ||||||||||||
| 7.3.1 | Sounding tube striker plates | 25 | EA | ||||||||||||
| 7.4.1 | 2” x 2” clad welds | 50 | EA | ||||||||||||
| 7.4.2 | 4” x 4” clad welds | 50 | EA | ||||||||||||
| 7.4.3 | 6” x 6” clad welds | 50 | EA | ||||||||||||
| WI 101 SUB-TOTAL | |||||||||||||||
| 501 | MISC PIPING REPLACE | QTY | UI | UNIT PRICE | TOTAL | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | |
| 7.1.1 | Eight inch Schedule 80 steel pipe | 60 | LF | ||||||||||||
| 7.1.2 | Eight inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 7.1.3 | Eight inch 90 degree elbows | 4 | EA | ||||||||||||
| 7.1.4 | Six inch Schedule 80 steel pipe. | 80 | LF | ||||||||||||
| 7.1.5 | Six inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 7.1.6 | Six inch 90 degree elbows | 4 | EA | ||||||||||||
| 7.1.7 | Five inch Schedule 80 steel pipe | 80 | LF | ||||||||||||
| 7.1.8 | Five inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 7.1.9 | Five inch 90 degree elbows | 4 | EA | ||||||||||||
| 7.1.10 | Three-inch Schedule 40 steel pipe | 80 | LF | ||||||||||||
| 7.1.11 | Three inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 7.1.12 | Three inch 90 degree elbows | 4 | EA | ||||||||||||
| 7.1.13 | Two-and-a-half-inch Schedule 40 steel pipe | 80 | LF | ||||||||||||
| 7.1.14 | Two and a half inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 7.1.15 | Two and a half inch 90 degree elbows | 4 | EA | ||||||||||||
| WI 508 SUB-TOTAL | |||||||||||||||
| TOTAL |
&"Times New Roman,Regular"&10USNS LEROY GRUMMAN (TAO-195)
| &"Times New Roman,Bold"&14 | |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220519R4011 |
ATTACHMENT J-3