This document outlines the scope of work for an annual inspection of the port main reduction gear and quill input shaft coupling diaphragm aboard the USNS John Lenthall (TAO 189). The inspection will be conducted in accordance with technical manuals by a manufacturer-authorized representative from Cincinnati Gear and will include a visual inspection of the normally loaded thrust collar and thrust cone contact, Kopflex coupling faces and hardware, gap measurements, and borescope inspection of the diaphragm coupling. The manufacturer's representative will direct a shear-wave NDT inspection of the Kopflex coupling. Records will be kept of mesh conditions, rust, and measurements taken. Regulatory bodies will witness the inspection. Upon completion, the reduction gear covers will be reinstalled with new gaskets and fasteners coated with anti-seize compound.

The related federal contract opportunity is for a Mid-Term Availability in support of the USNS John Lenthall (TAO 189) issued by the Department of the Navy's Military Sealift Command under solicitation number N3220520R4009.

View the file

Other files

File Type Posted
J-1 Work Item Index RevC.docx DOCX document
0108_A_Double Bottom Tank Top Steel Replacement.doc DOC document
WI 0090_A_Daily COVID-19 Prevention and Control Services Rev M.doc DOC document
J-3 CAT B Items-RevC.xlsx XLSX spreadsheet
J-2 Cat A Items-RevC .xlsx XLSX spreadsheet
J-3 RevB Category B Items.xlsx XLSX spreadsheet
Amendmnet 0008.docx DOCX document
Amendment 0007.docx DOCX document
Amendment 0006.docx DOCX document
WI 509_RevA_Tnk Dck Drain Piping Replace.docx DOCX document
Amendment 0005.docx DOCX document
Work Item Index-RevB 23OCT20.pdf PDF
J-2 Cat A Items-RevB .xlsx XLSX spreadsheet
J-1 RevA WI Index 15OCT20.pdf PDF
Amendment 0004.docx DOCX document
J-2 RevA Cat A Items.xlsx XLSX spreadsheet
New WI 403_ECDIS RADAR REPLACEMENT_13OCT20.docx DOCX document
408 REVA_Antenna Coupler Maint.pdf PDF
Amendment 0003.docx DOCX document
0105_A_Tank Hatch Preservation_RevA.doc DOC document
Amend 0002 20R4009-Update WI.docx DOCX document
0102_A_Degaussing Cable and Conduit Removal_RevA.doc DOC document
Amend 0001 20R4009-Extend.pdf PDF
J-12 Past Performance Data.pdf PDF
J-13 Past Performance Questionnaire.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
J-8 Request for Clarification.docx DOCX document
J-10 Interport Differential.pdf PDF
J-4 Gov Furnished Material.pdf PDF
J-14 Technical Non-Disclosure Agreement (NDA).pdf PDF
JA 20R4009_Redacted.pdf PDF
J-1 Work Item Index 08SEP20.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
J-3 Category B Items.xlsx XLSX spreadsheet
J-9 Disclosure Lobbying Activities (SF-LLL).pdf PDF
Solicitatioin 20R4009 - LENTHALL.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 ABSTRACT

1.1 This item describes the inspection of the vessel's port main reduction gear and quill input shaft coupling diaphragm.

2.0 REFERENCES/ENCLOSURES

2.1 References:

2.1.1 T9241-AH-MMC-010 Technical Manual for Main Reduction Gear Assembly. (Available of board)

2.2 Enclosures:

2.2.1 Reduction Gear Inspection Forms

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity: One (1) each, Engine Room Lower Level.

3.2 Description: Main Reduction Gear / Mfr. Cincinnati Gear, Models: Port 26-0500-037000 SN 012.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES: None.

6.0 NOT USED

7.0 STATEMENT OF WORK

7.1 All work to be accordance with reference 2.1.1 and inspection to be accomplished under direct supervision of a manufacturer authorized representative see paragraph 7.14 for source.

7.2 Visual inspection of normally loaded, active, thrust collar thrust cone contact. Document “as inspected” contact radial length (2.125 inched theoretical), evidence of heat, and uneven contact or wear condition.

7.3 Preform a visual inspection of the Kopflex coupling faces and hardware. Perform a shear-wave NDT inspection of the Kopflex coupling as directed by the Reduction gear Cincinnati Representative.

7.4 Feeler gage inspect thrust collar to input pinion shoulder gap. (“A” of enclosure 2.2.1.)

7.5 Feeler gage inspect forward side of thrust collar to 2-piece retaining ring clearance. (“B” of enclosure 2.2.1). Has thrust collar displaced metal from 2-piece retaining ring?

7.6 Inspect gap between forward side of thrust collar and one piece-retaining ring from uniform gap. (“C” of enclosure 2.2.1.)

7.7 Record any discoloration or built up of “baked oil” on outside diameter or back face of thrust collar or retaining rings.

7.8 Visually inspect retaining ring “tack” welds if present. Check retainer for evidence of moving forward. Check for retaining screws. Record the length of the shoulder on the input pinion that extends past the back face of the solid retaining rings. (“b” of enclosure 2.2.1.)

7.9 Feeler gage inspect “total” thrust cone axial clearance.

7.10 Inspect diaphragm for quill shaft input coupling. Utilizing a bore scope for the inspection.

7.11 Record general condition of main and PTO gear meshes.

7.12 Record general condition relative to rust.

7.13 Conduct inspection as required by regulatory bodies for both port and starboard reduction gears. MSC Rep., Chief Engineer, and ABS Surveyor to witness inspection.

7.14 Upon completion of inspection, reinstall covers with new gaskets and necessary new fasteners. All bolting to be coated with "Anti-seize" compound prior to reinstallation.

7.15 Manufacturer's Representative:

7.15.1 CST-Cincinnati are as follows:

Rob Rye, Ken Lawrence VP Sales & Marketing rrye@cst-c.com 513-527-8631(phone) 513-527-8620 (fax)

Ken Lawrence Manager, Spare Parts klawrence@cst-c.com

513-527-8623 (Phone)513-527-8620 (fax)
24 Hour Emergency Service Line513-383-4356

8.0 GENERAL REQUIREMENTS: None Additional

USNS LENTHALL

(TAO 189)

CONTRACT NO. N32205-20-4009

ITEM NO. 0202 RevB
CATEGORY "A"
12/08/2020
Main Reduction Gear Annual Inspection
Moira Kelly

0203 - 1

Enclosure 2.2.1

Enclosure 2.2.1

PORT REDUCTION

“Currently the Upgraded Thrust Collar configuration is only incorporated on the following ships. USNS Kaiser and Grumman –(Port REDGEAR)

Dimension
Description
Measured Value
Comments
A
Thrust collar to input pinion shoulder dimension
B
Bolter one piece retaining ring to tow piece retaining ring dimension

(-.xxx) indicated the one piece retaining ring overhangs the two piece retaining ring

C
Total thrust collar end play

0.026 PTO End

0.000 Thrust Collar End

D
Bolted Tack Weld Inspection

Inspection consist of visually verifying that all (16) hex head bolt tack welds are present and

STBD REDUCTION

Dimension
Description
Measured Value
Comment
A
Thrust collar to input pinion shoulder dimension
B
Thrust collar to 2-piece locking ring dimension

(-.xxx) indicated retaining ring overhangs input pinion end face

C
Thrust collar to retaining ring dimension
D
Retaining ring to input pinion end face dimension
E
Total thrust collar end play