The file's text, extracted by GovTribe without its formatting.
USNS WALLY SCHIRRA
(T-AKE 8)
WORK ITEM INDEX
N32205-19-R-6005
MILITARY SEALIFT FLEET SUPPORT COMMAND
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USNS WALLY SCHIRRA (T-AKE 8)
USCG No.: CG831778 ABS ID No.: 09163106
IMO No.: 9345116
(24 September 2018)
RFP NO: N32205-19-R-6005
(5 June 2019 – 18 August 2019 CONUS ROH/DD AVAILABILITY)
PRINCIPAL DIMENSIONS
LENGTH
689 ft. 00 in
BREADTH
105 ft. 07 in DRAFT FULL LOAD (mean)
30 ft. 06 in ABL
GROSS TONNAGE
43,758 TONS (registered)
MAXIMUM DISPLACEMENT
41,470 TONS
ESTIMATED ARRIVAL DRAFT
24 ft. 00 in Fwd.
26 ft. 06 in Mid
26 ft. 00 in Aft
AIR DRAFT WITH MAST DOWN
159 ft. 10 in ABL
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
INDEX
LIST OF REFERENCES
WORK ITEM INDEX
USNS WALLY SCHIRRA (T-AKE 8)
SECTION 0000
GENERAL REQUIREMENTS
NOT SEPARATELY PRICED (NSP) REQUIREMENTS
Rev Date Intent, Scope, General Requirements and
18 May 16
Definitions
Technical and Manufacturer’s Representatives
08 Nov 17 Approach, Berth, and Mooring Requirements
08 Nov 17 Testing and Quality Assurance
08 Nov 17 Electrical Safety Procedure Requirements
25 Feb 14
Heavy Weather Plan
25 Feb 14 Cold Weather Plan
NSP Physical Security at Private Contractor’s 24 Oct 17
Facility
CATEGORY “A” WORK ITEMS
Furnish Office for Overhaul Management Team(OMT) 25 Feb 14 Furnish General Services
Telephone Services
Project Planning and Production Status
Monitoring Reports
22 Apr 18 Preparation of Weight and Moment Report
Integrated Logistics and GFM Support
Requirements
Fire Protection and Ship’s Safety Program
28 Sep 17
Handling Ship’s Stores
Delivery and Redelivery of the Vessel
01 May 16 Shipboard Access and Security
01 Aug 15 Gas Free Certificates
Clean and Gas Free Tanks, Voids, Cofferdams and Spaces
01 Oct 12 Dock Trials and Sea Trial
28 Sep 17 Hazardous Waste Disposal
01 May 16
CATEGORY “B” WORK ITEMS
0025 Physical Security at Private Contractor’s
Facility
24 Oct 17
Continuation of Services
SECTION 0100
HULL STRUCTURE
0105 Misc. Weld Repairs Revision I
04 Feb 19 0108 Tank Boundary Testing and Structural Survey(ABS) 24 Sep 18 0111 Hull Survey Support (Special Survey 2)
Cargo Hold No 2 Drain Piping & Valve Replacement 24 Sep 18
0168 Remove Repair Reinstall HAZMAT Containers 24 Sep 18
0101 Ballast Tank Zinc Inspection
0166 Mechanically Clean and Preserve Tanks 24 Sep 18
SECTION 0200
Machinery, Propulsion
Propulsion Motor and Cooler Cleaning, Inspection and Maintenance 0202B Main Engine Flexible Connection Replacement
24 Sep 18
(10-Year) 0204 MDE Control Safety Inspection and Test
24 Sep 18 Annual Automation and Propulsion Control
24 Sep 18
Inspection and Testing Vulkan Couplings Annual Inspection
Propulsion Motor Pedestal Bearing Inspection 24 Sep 18 0251 Main Diesel Engine Start Air System Flush 24 Sep 18 0252 MDG 1 2 3 & 4 Start Air System Component Ovhl. 24 Sep 18
0202 MDG NO 1, 2 ,3, & 4 Cooler Casing Leak Repair 24 Sep 18
SECTION 0300
ELECTRICAL
0301 Cleaning Main Generators and Propulsion 24 Sep 18 Control System (10-Year) HV-SS-E Switchboard Inspection and Cleaning
24 Sep 18 0305 SO2 Detection System Install (T-ALT 404) 24 Sep 18 0306 SO2 Sensor Calibration Commissioning Certif. 24 Sep 18
03235 E-Board EDG & Bus-Tie Breaker Replace (T-ALT 486)24 Sep 18 EDG LO Cooler Installation (T-ALT 359)
0307 Cell Phone Distribution 24 Sep 18
SECTION 0400
COMMUNICATION AND NAVIGATIONAL AIDS
Bridge Equipment Annual Service
Antenna Preventative Maintenance
Communications System Annual Preventative
24 Sep 18
Maintenance
OE-570 WSC Antenna System Maintenance
AIS Renewal
0406 NAVMACS II Upgrade (T-ALT-16 454) 10 Jan 19 0452 Echo Depth Sounder Preventative Maintenance 24 Sep 18
SECTION 0500
MACHINERY, AUXILIARY SYSTEMS
0501B Firefighting Inspections and Testing(5-Year) 24 Sep 18 SCBA Annual Inspection
SCBA Air Compressor and Refilling Station
24 Sep 18 Inspection and Maintenance 0504B Cargo Crane Maintenance and Retesting(10-Year) 24 Sep 18 Emergency Diesel Generator(EDG) Annual
24 Sep 18
Inspection and Maintenance 0510 Calibrate and Test Oily Water Separators
24 Sep 18 0513 Gage Calibration Rev
Relief Valve Testing
Open and Inspect Air Receivers and HP Air
24 Sep 18
Flask
Steering Gear Preventative Maintenance
0527 Brine System Flush
0528A Magazine Sprinkler Valve Overhaul (T-AKE 1-10)
Sea Chest Grating (T-ALT 296)
Flush HT LT Freshwater and Chill Water Systems
0516 Brine and Defrost Pump and Motor Overhauls 24 Sep 18
0517 CSW LTFW Isola. Valve Manual Gear Operator Rep. 24 Sep 18
0541 LTFW SW Cooler 20 and 10 Inch Valve Replacement 24 Sep 18
Incinerator Inspection and Maintenance
Alarm Tower in Engine Workshop (T-ALT 396)
MMR AFFF Foam System Piping Replace Revision I 04 Feb 19
0553 Chill Water Pump and Motor Overhaul 24 Sep 18
SECTION 0600
OUTFIT, FURNISHINGS and HABITABILITY
LB, RHIB, Davits and Accom. Ladder Annual 24 Sep 18
Inspections and Testing.
0602 Unrep Stations No 1 No 2 No 5 No 7 No 8 Winch 24 Sep 18
Drum Preservation.
Lifeboat Certification & Falls Renewal (5-Year) 24 Sep 18
RHIB Boat Certification & Falls Renewal(5-Year)
0605 Life Raft Annual Certification
0606 Renew Flight Deck Non-Skid Revision I
18 Dec 18
0609 Immersion Suit Inspection and Testing
Galley and MSO Equipment Calibration
Flight Deck Hatch Wire Rope Repl. (T-ALT 450) 24 Sep 18
SECTION 0800
HEATING, VENTILATION and AIR CONDITIONING
Galley and Laundry Exhaust Duct Cleaning
24 Sep 18 Air Handlers and Fan Coil Units Cleaning
24 Sep 18
Brine System Valve Replacement
Cargo Refrigeration and AC Plant Expansion 24 Sep 18
Joint Replacement
SECTION 0900
DRYDOCKING
Dry Docking and Undocking Vessel
0903 Propeller Shaft and Stern Tube Inspection
0904 Stern Tube Seal Inspection (FW System)
0905B Bow Thruster Maintenance (5-Year)
Polish Bow Thruster Propeller
Renew Sea chest, Rope Guard and Bow Thruster 24 Sep 18 Zincs
Anchor and Anchor Chain Ranging
Overhaul Sea Valves
Inspect and Repair Cathodic Protection
Shaft Grounding Maintenance
Waster Pieces Renewal
Underwater Hull Cleaning and Painting(Spot) 24 Sep 18 Freeboard Cleaning and Painting(Spot)
0931 Rudder Stock Gland Seal and Lower Bearing
Inspection Rev. II
Bow Thruster Grating (T-ALT 448)
Shaft Bulkhead Seal Overhaul
0902 Dry-Docking and Undocking
0914 Bilge Keel Repairs Rev- 24 Sep 18
0915 Underwater Hull Clean Paint (Near White Blast) 24 Sep 18
0917 Freeboard Cleaning Painting (Near white Blast) 24 Sep 18
0932 Valve MOV Groom
SECTION 1000
UNREP GEAR
1001 RAS Station Sliding Block Drive Chain Replace 24 Sep 18 1002 RAS Sliding Block and Transfer Head Refurbish 24 Sep 18 1003 RAM tensioner sway bracket install Mod 24 Sep 18 1004 NSTR Upgrade Station 6 Rev P4 (DELETED) 10 Jan 19
DRAWING /REFERENCE INDEX
USNS WALLY SCHIRRA (T-AKE 8)
| Work Item |
| Reference |
| Drawing/Reference Title |
| 001 |
| 2.1 |
| MSC 803-7081122, Military Sealift Command General Technical Requirements (GTR's) |
| 003 |
| 2.1 |
| Mil STD Mil-DTL-28628D, dated July 1991; Camels |
2.2
Mil STD Mil-F-29248, dated 21 November 1986; Fenders, Marine, Foam Filled, Netless
| 2.3 |
| MSC drawing No 802-8498772, General Arrangement, USNS WALLY SCHIRRA |
| 2.4 |
| NAVSEA 835-7489033, Rev C, Mooring Analysis |
| 004 |
| 2.1 |
| Mil-I-45208, (Series), Inspection Systems |
| 005 |
| 2.1 |
| High Voltage Awareness Instruction Guide PowerPoint |
| 2.2 |
| High Voltage Awareness PowerPoint Presentation |
| 2.3 |
| MSC Safety Management System Procedure 2.1-004-All, Lock-out/ Tag-out |
| 2.4 |
| MSC Safety Management System Procedure 2.1-016-AKE, High Voltage System |
| 006 |
| 2.1.1 |
| NAVSEA Drawing No. 801-8498788, SRD Trim & Stability Booklet and Loading Manual USNS WALLY SCHIRRA |
| 007 |
| 2.1 |
| NAVSEA Drawing No. 801-8498788, SRD Trim & Stability Booklet and Loading Manual USNS WALLY SCHIRRA |
| 011 |
| 2.1.1 |
| MSC Drawing No 802-8498772, General Arrangement, USNS WALLY SCHIRRA |
| 2.1.2 |
| MSC Chemical Treatment Handbook |
| 015 |
| 2.1 |
| DOD Security Manual for Safeguarding Classified Information, DOD Manual 5220.22-M |
| 016 |
| 2.1 |
| NFPA 312, Standard for Fire Protection of Vessels During Construction, Repair and Lay-Up |
| 2.2 |
| NFPA 51B, Standard for Fire Prevention in use of Cutting and Welding Processes |
| 2.3 |
| OSHA Fire Protection while in a shipyard, 29 Code of Federal Regulations (CFR) Part 1915.506, Titled, “Hazards of fixed extinguishing systems on board vessels and vessel sections.” |
| 2.4 |
| OSHA Confined Space Entry Program, 29 Code of Federal Regulations *CFR) Part 1910.146, titled “Permit-required confined spaces.” |
| 018 |
| 2.1 |
| NAVMED P-5010-6, Manual of Naval Preventive Medicine, Chapter 6, Water Supply Afloat |
| 2.2 |
| NASSCO Drawing 835-7489033, Mooring Analysis Arrangement. |
| 019 |
| 2.1 |
| COMSCINST 5530.3C, MSC Shipboard AT/FP Program |
| 021 |
| 2.1.1 |
| NAVSEA Drawing 801-8498747, Selected Record Drawing Capacity Plan USNS WALLY SCHIRRA |
| 2.1.2 |
| NAVSEA Drawing 801-8498788, Trim & Stability Booklet for USNS WALLY SCHIRRA (T-AKE 8) |
| 023 |
| 2.1.1 |
| Resource Conservation and Recovery Act (RCRA) as Amended |
| 2.1.3 |
| Applicable Uniform Hazard Waste Manifest Form |
| 2.1.4 |
| Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA Document, SW-846: The Official compendium of analytical and sampling methods that have been evaluated and approved for use in complying with the RCRA regulations. |
| 024 |
| 2.1 |
| COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism (AT) Program |
| 2.2 |
| NAVSEA Standard Item 009-72 “CURRENT FY REVISION”, Physical Security at Private Contractor’s Facility |
| 2.3 |
| 33 C.F.R. Part 165, Regulated Navigation Areas and Limited Access Areas |
| 025 |
| 2.1 |
| COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism (AT) Program |
| 2.2 |
| NAVSEA Standard Item 009-72 “CURRENT FY REVISION”, Physical Security at Private Contractor’s Facility |
| 2.3 |
| 33 C.F.R. Part 165, Regulated Navigation Areas and Limited Access Areas |
| 101 |
| 2.1 |
| NAVSEA Drawing 631-7489175, Corrosion Prevention of Ballast Tanks |
| 108 |
| 2.1 |
| NAVSEA Drawing No 801-8498747, Capacity Plan. |
| 2.2 |
| NAVSEA Drawing No 801-8498788, Trim & Stability Booklet and Loading Manual USNS WALLY SCHIRRA T-AKE 8. |
| 2.3 |
| ABS Rules for Survey After Construction; Part 7 Chapter 3, Section 2 |
| 111 |
| 2.1 |
| ABS Steel Vessel Rules |
| 126 |
| 2.1 |
| MSC Standard Item No. 043, revised 02 April 1993, “Cleaning and Gas Freeing Tanks and Spaces” |
| 166 |
| 2.1 |
| Military Sealift Fleet Support Command (MSFSC) Standard Work Item for Repetitive Repair Requirements; Item No. 10 dated 22 March 2010; Tank, Void and Cofferdam Preservation |
| 2.2 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.3 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.4 |
| MSC PPG Paint Handbook |
| 2.5 |
| NAVMED P-5010-6, Water Supply Afloat |
| 168 |
| 2.1 |
| T/M TG830-AB-MMC-010 Hazardous Material Container, Model V126-FR |
| 2.2 |
| MSC Drawing W1261103-OD 20’X8’6, Hazardous Material Container. |
| 201 |
| 2.1 |
| T/M T9235-AG-MMC-010, Propulsion Motor, Synchronous, Motor Design M3HSX 305-126/16 |
| 2.2 |
| General Electric Power Conversion, Service Bulletin T-AKE-SB-0014, Dtd 15 October 2017 |
| 202 |
| 2.1 |
| T9233-CF-IMC-040_Group 322.17_CAC |
GEA Manual for CAC
| 202B |
| 2.1 |
| Technical Manual T9233-CF-IMC-070; Diesel Engines, Main Power Generation Models 48/60 8L And 9L. |
| 204 |
| 2.1 |
| MSC DWG 079-8387325, MCCS Periodic USCG Safety Test Procedure (PSTP). |
| 205 |
| 2.1 |
| MSC DWG 079-8387325, MCCS Periodic USCG Safety Test Procedure (PSTP). |
| 2.2 |
| Technical Manual, T9235-AN-MMC-010, T-AKE Propulsion Control System |
| 2.3 |
| Technical Manual, T9235-AJ-MMC-010,030,050, T-AKE Machinery Centralized Control Station |
| 2.4 |
| ABS Current version SVR, ACCU notation |
| 2.5 |
| ABS Current Version Integrated Quality Software Management (ISQM) |
| 206 |
| 2.1 |
| Technical Manual, Vulkan Coupling, Tech Doc DOKU1G531W0013E |
| 2.2 |
| Technical Manual T9233-CF-IMC-070/020; Diesel Engines, Main Power Generation, Model 9L 48/60 and 8L 48/60, Volume E1-E4 for Main Diesels |
| 2.3 |
| T-AKE Class Notice 015 – Main Diesel Generator |
| 207 |
| 2.1.1 |
| T/M T9235-AG-MMC-010, Propulsion Motor, Synchronous, Motor Design M3HSX 305-126/16 |
| 251 |
| 2.1 |
| MSC DWG 516-8386990; Diesel Generator Starting Air System Diagram |
| 2.2 |
| MSC DWG MSC DWG 505-7488748, Flushing Criteria and Guidelines |
| 252 |
| 2.1 |
| T/M T9233-CF-IMC-020; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B2, Engine Working Instructions. |
| 2.2 |
| T/M T9233-CF-IMC-030; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volumes C1, C2, C3, Turbocharger Operating and Working Instructions/Spare Parts Catalog |
| 301 |
| 2.1 |
| Safety Management System 2.1-016-AKE/AKE(RM), High Voltage(HV) Systems |
| 2.2 |
| NAVSEA Tech Manual T9235-AK-MMC-010, Generator, Synchronous 6600V, 60 HZ Including Generator Excitation Control Panel |
| 2.3 |
| NAVSEA Tech Manual T9235-AM-MMC-010, Transformers, Propulsion |
n, Type THT 12 HN 7M2/N
| 2.4 |
| NAVSEA Tech Manual T9235-AN-MMC-010, T-AKE Propulsion Control System |
| 303 |
| 2.1.1 |
| Safety Management System 2.1-016-AKE/AKE(RM), High Voltage(HV) Systems |
| 2.1.2 |
| Technical Manual T9235-AL-MCC-010; Main Power Switchboard, 6.6 KV, 2500A |
| 2.1.3 |
| Technical Manual T9324-BU-MMC-010; Switchboards Ships Service 480V |
| 2.1.4 |
| Technical Manual T9324-BT-MMC-010; Emergency Switchboard 480V Dwg 2838 For TAKE |
| 2.1.5 |
| Cutler Hammer, I.B. 32-255-1G, Instructions for Installation, Operation and Maintenance of Type VCP-W Vacuum Circuit Breakers |
| 305 |
| 2.1 |
| MSC DWG 300-8495270, SO2 Gas Detection System Installation |
| 2.2 |
| S9436-A8-MMC-010, Technical Manual for Gas Detector System Sulfur Dioxide (SO2) Model 1410-00 |
| 2.3 |
| MSC Dwg. No. 320-8498762, Rev. -; Electrical System One Line Diagram |
| 306 |
| 2.1 |
| MSC Drawing No 300-8494555, SO2 Gas Detection System Installation |
| 2.2 |
| S9436-A8-MMC-010, Technical Manual for Gas Detector System Sulfur Dioxide (SO2) Model 1410-00 |
| 2.3 |
| NAVSEA DWG SRD 512 748 8759 HVAC Diagram Cargo Hold |
Attachment 1, Preliminary/Conceptual Design of an Internal Cell Phone Signal Distribution System.
| 323 |
| 2.1 |
| T9324-BT-MMC-010 Technical Manual, Switchboard, 480V Emergency, Dwg #2838, for T-AKE |
| 2.2 |
| American Bureau of Shipping (ABS) Rules for Building and Classing Steel Vessels. |
| 2.3 |
| MSC Drawing, 803-7081122, Military Sealift Command General Technical Requirements (GTRs). |
| 2.4 |
| IEEE STD 45-2002, Recommended Practice for Electric Installations on Ships. |
| 2.5 |
| MSC Safety Management System Procedure 2.1-004-ALL, Lock-out/Tag-out |
| 325 |
| 2.1 |
| MSC Drawing No. 260-8393845 EDG Bearing Supplemental Lube Oil Cooler Installation |
| 2.2 |
| MSC Drawing No. 300-8393846 EDG Lube Oil Cooler Electrical Installation |
| 2.3 |
| Technical Information: Southwest Thermal Air Exchanger, Model # BOL-8 |
| 401 |
| 2.1 |
| NGSM 9200266-31 User Manual for VDR Explorer VM II III IV |
| 2.2 |
| NG-SPERRY BRIDGE MASTER E RADAR SERVICE MANUAL NO. 65800011 |
| 2.3 |
| NG-SPERRY MARINE VMFT ECDIS MS0265-5004027 REV- |
| 402 |
| 2.1 |
| USNS WALLY SCHIRRA (T-AKE 8) SHIP ANTENNA LEGEND |
| 2.2 |
| Whip Antenna Maintenance PMS 4411/023, U10 |
| 2.3 |
| Dipole Antenna Maintenance PMS 4411/006 |
| 2.4 |
| NAVSEA Standard-Item 009-32 |
| 2.5 |
| Surface Force Logistics Center (SFLC) Standard Specification 6310 |
| 403 |
| 2.1 |
| Technical Manual EE682-AA-MMC-020; 1AN/USQ-155 |
| 2.2.1 |
| TVS-AN/USQ-155_MIP 4416/510_M1 |
| 2.2.2 |
| TVS-AN/USQ-155_MIP 4416/510_S-1 |
| 2.2.3 |
| OE-570-MIP 4411/019 MRCS R-1 and Q-1 |
| 2.3 |
| Technical Manual EE100-JK-INM-010; RF-5800 400W COMM SYSTEM |
| 2.4 |
| Technical Manual EE172-AB-OMI-010; AN/URN-25 TACAN |
| 2.5 |
| Technical Manual EE685-W7-SUM-010; AN/SYQ-26 NAVMACS II |
| 2.6 |
| OA-9277 Multi-coupler Technical Manual |
| 2.6.1 |
| Technical Manual EE111-DA-OMI-010/0A-9123,OA-9277 (T-AKE 1-9) |
| 2.6.2 |
| Technical Manual EE111-DA-OMI-010 FOR OA-9277A (T-AKE 10-14) |
| 404 |
| 2.1 |
| Technical Manual EE 134-AT-OMP-010; OE-570-WSC |
| 405 |
| 2.1 |
| Sperry Marine MSO113-E15-1497 REV E (Proprietary). |
| 2.2 |
| SAAB R5 AIS Technical Install & OPS Manual (Provided with new Contractor furnished system) |
| 406 |
| 2.1 |
| Removal Plan & Elevation Drawing No184-8497097 Rev |
| 2.2 |
| Drawing No 401-8497098 Rev- |
| 452 |
| 2.1 |
| TE 360-AV-MMC-010 / 0910-LP-104-3397 Installation Technical Manuals. |
| 501B |
| 2.1.1 |
| MSFSC SWIRRR 028, “Fire Fighting System Inspection and Testing” |
| 2.1.2 |
| MSC Dwg. No. 801-8193673; SRD: Fire Control Plan. |
| 2.1.3 |
| MSC Dwg. No. 555-8193763; FM-200 Fire Extinguishing System Diagram. |
| 2.1.4 |
| Technical Manual T9555-CJ-MMC-010; FM 200 Fire Extinguishing System, Model FM-200 |
| 2.1.5 |
| MSC Dwg. No. 555-8498770; SRD: Foam Firefighting System Diagram. |
| 2.1.6 |
| Technical Manual T9555-CL-MMC-010; Fire Protection System, Foam |
| 2.1.7 |
| Technical Manual T9555-CN-MMC-010; Fire Fighting System, Carbon Dioxide HP, Semi-Fixed Hose Reel; Operation and Maintenance |
| 2.1.8 |
| Kidde Fire Systems Technical Bulletin #17-12K; “Marine HPCO2 Hose Reel Installation” |
| 2.1.9 |
| Technical Manual TE168-BE-MMC-010; Detection System, Fire and Smoke Installation, MDL CS3000; Operation, and Maintenance Instructions |
| 2.1.10 |
| Tech Manual TE168-BF-MMC-040; Detection System, Fire & Smoke Model CS4000, Installation Manual; Installation, Operation, & Maintenance Manual, Consilium Marine AB |
| 2.1.11 |
| Technical Manual T9555-CM-MMC-010; Fire Suppression System, MDL WHDR-600, Range Guard |
| 2.1.12 |
| Tech Manual T9555-CK-MMC-010; Fire Extinguishing System, Water based, Localized |
| 2.1.13 |
| Tech Manual T9555-CQ-MMC-010; Fire Extinguishing System, Crossflow Water Mist, Installation, Operation, and Maintenance Manual, Novenco A/S |
| 502 |
| 2.1 |
| SMS Procedure 2.3-002-ALL Rev 2.6 - SCBA |
| 503 |
| 2.1 |
| Technical Manual T6220-CH-MMC-010; Compressor Unit, High Pressure Breathing Air, VERTICUS Model VT13 |
| 2.2 |
| MAKO Model SCFS3-3HP; Instruction, Maintenance, and Operating Manual |
| 504B |
| 2.1 |
| ABS Guide for Certification of Lifting Appliances, Chapter 2 Guide for Certification of Cranes, Section 7 Surveys |
| 2.2 |
| T-AKE-1 Class Cargo Crane Recertification Test Procedure; Test No:8390285 Rev/Chg:00 |
| 2.3 |
| Tech Manual TG811-BL-MMC-010/TG811-BN-MMC-010, Boom Crane, Electro-Hydraulic DWG AMD-1975 |
| 2.4 |
| Dwg. No. 573-8392503, Hose List Appleton Cargo Crane |
| 2.5 |
| NAVSEA Dwg. No. 803-6397427, Rev. A; Links Radio Frequency, High-Voltage Insulator Link, Cylinder Type |
| 2.6 |
| Appleton Marine, Inc., Memo FSR-16136-01, dated 06 June, 2011, Recommended Wire Rope Spelter Anchorage Inspection, Lubrication and Preservation Procedure |
| 2.7 |
| Appleton Marine, Inc., ABS Required – Turntable Bearing Tilt Test Procedure/Log Book |
| 2.8 |
| Hyd Boom Cyl First Telescoping YMD-8842 |
| 2.9 |
| Hyd Boom Cyl Second Telescoping YMD-8843 |
| 2.10 |
| Appleton Crane Boom Rebuild Reference |
| 506 |
| 2.1 |
| T9312-AY-IMC-010, High Displacement Marine Auxiliary Engine/Emergency Diesel Generator Model 3516B VOL1 Part1 |
| 2.2 |
| MSC DWG 079-8498783, MCCS Periodic Safety Test Procedures (PSTP) |
| 509 |
| 2.1 |
| NAVSEA Dwg. 531-7488738 SRD-Distilling Plant Sys Diag |
| 2.2 |
| NAVSEA T/M T9531-AU-MMC-010; Distilling Plant And Bromination Disinfection System, Model SPD35-53TPD |
| 510 |
| 2.1 |
| T/M T9550-AW-MMC-010, Separator, Oily Water, Heli-Sep Model 5000-J5852 (Available Onboard) |
| 2.2 |
| T/N T9550-AU-MMC-010, Separator, Oily Water, Oil Content Detector (Available onboard) |
| 513 |
| 2.1 |
| USNS Wally Schirra Gage Calibration Listing, Mechanical Systems, List. |
| 2.2 |
| USNS Wally Schirra Gage Calibration Listing, Electrical Systems, List. |
| 514 |
| 2.1 |
| List of Relief Valves embedded within the work item |
| 515 |
| 2.1 |
| MSC 551-8498785, SRD, Ship Service & Control Air System Diagram. |
| 2.2 |
| MSC 551-8498773, SRD, High Pressure Air System Diagram. |
| 2.3 |
| W-ST-001-02-03_A – Main Diesel Engine Starting Air Receiver Tank |
| 2.4 |
| W-ST-002-96-03_ - Receiver Starting Air for Ship’s Emergency Diesel Generators |
| 2.5 |
| W-ST-003-96-03_ - Air Receiver, Control |
| 2.6 |
| W-ST-004-96-03_ - Air Receiver, Ship’s Service |
| 2.7 |
| NSTM 551 – Compressed Air Plants and Systems |
| 516 |
| 2.1 |
| NAVSEA Drawing No. 516-8498752 Rev F, Cargo Refrigeration Secondary Coolant Circulation System Diagram. |
| 2.2 |
| Military Sealift Standard Work Item #31, Motor driven Pump Overhauls |
| 2.3 |
| TM T9516-BN-MMC-01A, Brine System Installation and Maintenance Manual |
| 522 |
| 2.1 |
| MSC T/M T9561-BR-MMC-010, STEERING GEAR, ROTARY VANE, MODEL RV 2150-3 |
| 527 |
| 2.1 |
| MSC DWG 516-8498752; Cargo Refrigeration Secondary Coolant Circulating System Diagram. |
| 528A |
| 2.1 |
| T/M S6435-RZ-MMM-010; Valves Sprinkler, Navy Standard, Sizes 1-1/2″ Through 8″, Dwg. No. 803-639-7408 |
| 2.2 |
| T/M S9522-AA-HBK-010 Rev 4, Description, Operation and Maintenance Handbook for Magazine Sprinkling Systems |
| 2.3 |
| NAVSEA Drawing NO. 471-342-7104 REV D; “CARGO HOLD SPRINKLING SYSTEM DIAGRAM” |
| 541 |
| 2.1.1 |
| MSC DWG 256-8498753 - Central Seawater Cooling System Diagram. |
| 546 |
| 2.1 |
| Technical Manual T9593-DD-MMC-010 INCINERATOR, TYPE ATLAS 800 LS WS P WITH WEDGE BELT DRIVEN FAN |
| 548 |
| 2.1 |
| MSC DWG NO 202-8496086, ADDITIONAL ALARM COLUMN INSTALLATION FOR WORKSHOP AND AMR |
| 2.2 |
| NAVSEA DWG NO 202-7488827, BWD ALARM EXTENSION PANEL/ALARM COLUMN. |
| 2.3 |
| MSC Drawing No. 802-8498772, General Arrangement. |
| 2.4 |
| NAVSEA DWG NO 300-7488841, MASTER WIREWAY DIAGRAM. |
| 2.5 |
| MCCS PERIODIC U. S. C. G. SAFETY TEST PROCEDURE No 8498783 |
| 2.6 |
| NAVSEA DWG NO 635-7489020, INSULATION ARRANGEMENT 3RD DECK. |
| 2.7 |
| NAVSEA DWG NO 631-7488891, PAINT SCHEDULE. |
| 2.8 |
| NAVSEA DWG 801-8193674, FIRE CONTROL PLAN USE 8193673 |
| 549 |
| 2.1 |
| MSC Drawing 163-8392635, Rev -, Contract Guidance Drawing, T-AKE 1 Class, Seachest Grating Attachment System Upgrade Ripout for T-AKE 1 thru T-AKE 8 |
| 2.2 |
| MSC Drawing 163-8392636, Rev -, Contract Guidance Drawing, T-AKE 1 Class, Seachest grating Attachment System Upgrade Installation for T-AKE 1 thru T-AKE 8 |
| 2.3 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 2.4 |
| MSC Drawing 100-7489178 Rev. E, T-AKE 1 Class, Seachest Gratings (T-AKE 1 thru T-AKE 8) |
| 2.5 |
| MSC Drawing 801-8498772, Selected Record Drawing, T-AKE 1 Class, General Arrangement. |
| 2.6 |
| MSFSC SMS Procedure 2.1-004-All, Tag-out/Lockout |
| 2.7 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule |
| 553 |
| 2.1.1 |
| MSC Tech Manual: T6225-MM-MMC-010 Buffalo Pump Technical Manual for VHSM Size 6” AC Chilled Water Pump |
| 555 |
| 2.1 |
| MSC Drawing 555-8494867, Rev A, Contract Guidance Drawing, T-AKE 1 Class, MMR AFFF System Piping Replacement Modification. |
| 2.2 |
| MSC Drawing 555-8387000, Rev -, Selected Record Drawing Foam Firefighting System Diagram. |
| 2.3 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs). |
| 2.4 |
| MSFSC SMS Procedure 2.1-004-All, Tag out/Lockout. |
| 2.5 |
| ASTM Standard F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities. |
| 2.6 |
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing Procedures. |
| 2.7 |
| MSC Drawing 631-7488891, T-AKE Class, Paint Schedule. |
| 555 |
| 2.8 |
| MMR AFFF Required Material. |
| 556 |
| 2.1 |
| NAVSEA DWG 514-8498735 Rev -, A/C Chilled Water System Diagram |
| 2.2 |
| NAVSEA DWG 532-8498909 Rev -, Diesel Generator High Temperature Freshwater Cooling System Diagram |
| 2.3 |
| NAVSEA DWG 532-8498931 Rev -, Low Temperature Freshwater Cooling System Diagram |
| 2.4 |
| Attachment 1, Drew Marine FERROCLEAN Technical Product Sheet. |
| 2.5 |
| Attachment 2, Drew Marine Diesel Engine/FW Cooling System Removal o Corrosion products using FERROCLEAN. |
| 2.6 |
| MSC Class Notice #49 , dated 07 March 2018, Titles MDG Coolant Flush and Conversion Implementation |
| 601 |
| 2.1 |
| IMO MSC.1/Circ. 1331 dtd 11 June 2009, Guidelines for construction, Installation, Maintenance and Inspection/Survey of Means of Embarkation and Disembarkation. |
| 2.2 |
| TS800-AE-MMC-010 Life Boat with Winch and Davit Installation, Operation and Maintenance Manual |
| 2.3 |
| T9583-A8-MMC-010 Boat, Rescue with Davit and Winches, Operation And Maintenance Manual |
| 602 |
| 2.1 |
| Surface Preparation Specification (SSPC-SP-11) of Steel Structures Painting Council Manual. |
| 2.2 |
| Surface Preparation Specification (SSPC-SP-10 Near White Metal) of Steel Structures Painting Council Manual. |
| 2.3 |
| COMSCINST 4750.2C, Preservation Instruction for MSC Ships. |
| 603 |
| 2.1 |
| TS800-AE-MMC-010 Life Boat With Winch And Davit Installation, Operation And Maintenance Manual |
| 2.2 |
| MSFSC SWIRR 001, Lifeboat, Rescue Boats and Davit Maintenance Requirements |
| 2.3 |
| SOLAS Chap III, Life-Saving Appliances and Arrangements |
| 2.4 |
| IMO MSC.1/Circ. 1206, Annex 1, Guidelines for Periodic Servicing and Maintenance of Lifeboats, Launching Appliances and On-Load Release Gear |
| 604 |
| 2.1 |
| T9583-A8-MMC-010 Boat, Rescue with Davit and Winches, Operation And Maintenance Manual |
| 2.2 |
| MSFSC SWIRR 001, Lifeboat, Rescue Boats and Davit Maintenance Requirements |
| 2.3 |
| SOLAS Chap III, Life-Saving Appliances and Arrangements |
| 2.4 |
| IMO MSC.1/Circ. 1206, Annex 1, Guidelines for Periodic Servicing and Maintenance of Lifeboats, Launching Appliances and On-Load Release Gear |
| 605 |
| 2.1 |
| 46 CFR 160.151-35, Servicing Inflatable Life Rafts (SOLAS) |
| 2.2 |
| 46 CFR 160.151-57, Servicing Procedures, Inflatable Life Rafts (SOLAS) |
| 2.3 |
| MSC Drawing 802-8498772, Selected Record Drawing General Arrangement. |
| 2.4 |
| MSFSC Standard Work Item for Repetitive Repair Requirements Item No. 2, “Inspection and Repair of Inflatable Liferafts.” |
| 606 |
| 2.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634 (“Deck Coverings”) |
| 2.2 |
| Naval Air Warfare Center, Visual Landing Aids Installation TAK(E) Class Ships – 627928 |
| 2.3 |
| Surface Preparation Standard No. 10 (SSPC-SP-10) of the steel structures painting council manual. |
| 2.4 |
| Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal. |
| 2.5 |
| Air Capable Ship Aviation Facilities Bulletin No. 1K. |
| 2.6 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Water jetting Prior to Recoating. |
| 2.7 |
| NAVSEA Dwg 588-7488997 (H), Aviation Support Facilities. |
| 609 |
| 2.1 |
| Navigation and Vessel Inspection Circular No. 01-08; Subject “Shipboard Inspection and Testing of Immersion Suits |
| 2.3 |
| NAVSEA Dwg. 631-7488891 Rev. J; Paint Schedule |
| 2.4 |
| NAVSEA Dwg. 631-7489177 Rev. B; Non-skid Arrangement |
| 626 |
| 2.1 |
| TIMSA Drawing 471-0058-1-T001, Hatch WTRRT FL Spring Balance |
| 801 |
| 2.1 |
| MSCFSC SWIRR 004, “Ventilation System Cleaning Requirements” |
| 2.2 |
| NAVSEA Drawing 512-7488750, Rev J; HVAC Diagram Accommodation Spaces (Sheets 1, 17 and 22 only) |
| 822 |
| 2.1.1 |
| MSCFSC SWIRR 004, “Ventilation System Cleaning Requirements” |
| 2.1.2 |
| TM T9512-BN-MMC-010, Heating Ventilation &Air Conditioning (HVAC) Volume 1 |
| 2.1.3 |
| TM T9512-BN-MMC-020, Heating Ventilation &Air Conditioning (HVAC) Volume 2 |
| 823 |
| 2.1 |
| NAVSEA Drawing No. 516-8498752 Rev F, Cargo Refrigeration Secondary Coolant Circulation System Diagram. |
| 824 |
| 2.1 |
| Tech Manual T9516-A8-MMC-010, Cargo Refrigeration Plant Technical Manual |
| 2.2 |
| Tech Manual T9516-BB-MMC-010, AC Refrigeration Plant Technical Manual |
| 2.3 |
| MSC Drawing 532- 8498779, Low Temperature Freshwater Cooling System Diagram. |
| 2.4 |
| MSC Drawing 516-8498752, Cargo Refrigeration Secondary Coolant Circulating System Diagram. |
| 2.5 |
| MSC Drawing 514- 8498735, AC Chilled Water System Diagram. |
| 901 |
| 2.1.1 |
| MSC Drawing No. 801-8498788, USNS WALLY SCHIRRA Trim and Stability Booklet |
| 2.1.2 |
| MSC Drawing No. 801-8798760, Docking Plan. |
| 2.1.3 |
| MSC Drawing No. 830-8498747, USNS WALLY SCHIRRA Capacity Plan. |
| 2.1.4 |
| Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C (SH) |
| 2.1.5 |
| COMSCINST 9997.1A, Dry dock Standards for MSC Ship Availabilities |
| 902 |
| 2.1 |
| Work Item 901, Dry-Docking and Undocking Vessel |
| 903 |
| 2.1.1 |
| NAVSEA Dwg 243-7488962, Shaft Arrangement |
| 2.1.2 |
| T/M T9243-AZ-MMC-010 Fixed Pitch Propeller and Shafting with Bearings Model W084836780 |
| 2.1.3 |
| T/M T9561-BR-MMC-010 Steering Gear Rotary Vane, Model # RV 2150-3, and Shorthorn Rudder |
| 2.1.4 |
| Wartsila Dwg W084837233 Rev E, Assembly Stern tube |
| 2.1.5 |
| Bot Groninger Dwg 1.1262/1/1 A1, Rudder Project Arrangement |
| 2.1.6 |
| Bot Groninger Dwg 3.1265/1.1 A3, Rudder Trunk Summary |
| 2.1.7 |
| Bot Groninger Dwg 2.1263/1.1 A3, Rudder Cone Coupling |
| 2.1.8 |
| Bot Groningen Dwg 2.1264/1.1 A3, Rudder Hydraulic Nut Summary |
| 2.1.9 |
| Wartsila Dwg W084827066, Assy Propeller Cap |
| 2.1.10 |
| Wartsila Dwg W084836779, Propeller Boss |
| 2.1.11 |
| Wartsila Dwg W084838596, Assy Propeller Hydraulic Nut |
| 2.1.12 |
| NASSCO Dwg 471-351-4984, Rope Guard Installation |
| 2.1.13 |
| Wartsila Dwg W084837232, Arrangement Shafting; Spare Parts |
| 2.1.14 |
| Wartsila Dwg W007420313, Round Nut Locking |
| 2.1.15 |
| Wartsila Dwg 9AK30410AS3, Shaft Flange-9FC6-58 AS3 |
| 2.1.16 |
| MIL-STD-2199A Department of Defense Standard Practice: Coverings for Waterborne Main Propulsion Shafting on U.S. Naval Surface Ships and Submarines (26 July 2010) |
| 2.1.17 |
| Wartsila Drawing W084827066, Assembly Propeller Cap |
| 2.1.18 |
| NAVSEA Drawing No. 243-7488962 Revision G, Shaft Arrangement |
| 904 |
| 2.1 |
| TECHNICAL MANUAL T9243-AX-MMC-010, SHAFT SEAL, STERN TUBE, TYPE MD FOR USNS LEWIS AND CLARK (T-AKE 1) CLASS, INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS |
| 2.2 |
| WARTSILA LIPS Drawing H74985-01 Rev(C), GA of 750 MOD 712 Type MD Seal |
| 2.3 |
| TECHNICAL MANUAL FOR 744 TYPE A8 SEAL, TM-A8-T-AKE |
| 2.4 |
| WARTSILA DWG H79352-01 REV C, GA of 744 Type A8 SEAL |
| 905B |
| 2.1 |
| T/M T9568-A2-MMC-010 CHG-A, Bow Thruster Installation Manual TYPE TT2200. |
| 909 |
| 2.1.1 |
| Surface Preparation Specifications, Steel Structures Painting Council Volume 2 |
| 2.1.3 |
| NAVSEA Dwg. 631-7488891, Paint Schedule |
| 2.1.4 |
| NAVSEA DWG. 581-7489016, Anchor Handling Arrangement and Details |
| 910 |
| 2.1 |
| MSC Drawing 801-8498760, Docking Plan. |
| 2.2 |
| T/M T6435-CN-MMC-010, T-AKE Motor Operated Valves With Actuators |
| 2.3 |
| Sea Valves Status Spreadsheet |
| 911 |
| 2.1 |
| 2/M T9633-AS-MMC-010, Cathodic Protection System Impressed Current |
| 912 |
| 2.1 |
| Technical Manual S9243-BY-MMA-010/3AB25; Maintenance Manual for 200 Amp Electronic Grounding Unit |
| 2.2 |
| MSC Dwg. No. 320-8391519 Rev -; T-AKE Shaft Ground Modification Electrical |
| 2.1 |
| MSC Drawing No. 256-8498753, Central Seawater Cooling System Diagram. |
| 2.2 |
| MSC Drawing No. 256-8498737, Auxiliary Seawater System Diagram. |
| 2.3 |
| MSC Drawing No. 521-8498768, Fire main System Diagram. |
| 2.4 |
| MSC Drawing No. 529-8498739, Ballast System Diagram. |
| 2.5 |
| MSC Drawing No. 531-7488738, Distilling Plant System Diagram |
| 2.6 |
| NASSCO Drawing No. 73-87-441; Waster Piece, Class 150, 4 NPS and Above |
| 2.7 |
| Drawing No. 256-8390559; Central Seawater Waster Piece Assembly |
| 914 |
| 2.1 |
| NAVSEA DWG 100-7489133, Bilge Keel & Hold Double Bottoms (BK Zone). |
| 915 |
| 2.1 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks |
| 916 |
| 2.1 |
| MSC Standard Item 90, Underwater Hull Recoat 5 Year Ablative |
| 2.2 |
| NAVSEA Drawing. 603-7488868, Paint Lines and Draft Marks. |
| 2.3 |
| Surface Preparation Standard Grit Blast Cleaning, SSPC-SP-10/NACE 2, Surface Preparation and cleaning of Metals, Prior to Coating. |
| 2.4 |
| PPG-PMC MSC Handbook. |
| 2.5 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.6 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.7 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 2.8 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 2.9 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bristle Patch ISO 8502-6 |
| 2.10 |
| SSPC SP11, Power cleaning to Bare Metal. |
| 917 |
| 2.1 |
| NAVSEA Dwg 603-7488868, Paint Lines and Draft Marks |
| 2.2 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 918 |
| 2.1 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 2.2 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 2.3 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 2.4 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 2.5 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bristle Patch ISO 8502-6 |
| 2.6 |
| SSPC SP11, Power cleaning to Bare Metal. |
| 2.8 |
| NAVSEA Drawing. 603-7488868, Paint Lines and Draft Marks. |
| 931 |
| 2.1 |
| Technical Manual T9561-BR-MMC-010, Steering Gear, Rotary Vane, Model No 2150-3, and shorthorn Rudder. |
| 932 |
| 2.1 |
| T/M T6435-CN-MMC-010; T-AKE Motor Operated Valves with Actuators. |
| 933 |
| 2.1.1 |
| MSC Drawing No. 100-8496418, BOW THRUSTER TUNNEL PROTECTIVE GRATING MODIFICATIONS. |
| 2.1.2 |
| MSC Drawing No. 803-7081122, MSC General Technical Requirements (GTR). |
| 2.1.3 |
| MSC Standard Drawing No. 803-7080803, Preparation of Computer Aided Designed (CAD) Drawings for Government Owned Ships. |
| 934 |
| 2.1 |
| NAVSEA Drawing No. 243-7488962, Shaft Arrangement |
| 2.2 |
| TM T9243-AY-MMC-010 Shaft Seal, Bulkhead Type ND |
| 2.3 |
| WARTSILA LIPS INC Drawing No. GA of 560 MOD 553 Type ND Seal |
| 2.4 |
| WARTSILA LIPS INC Drawing No. WLP001327-001, Diaphragm Kit for DWG H75003-01, ND Bulkhead Seal T-AKE Lewis & Clark Class |
| 1001 |
| 2.1 |
| NAVSEA Tech Manual S9570-AC-MMA-020, Navy Standard Sliding Block Drive with Slip Clutch |
| 2.2 |
| NAVSEA Drawing No. 5210545, Standard Painting Procedures for UNREP Equipment |
| 2.3 |
| NAVSEA Drawing. No. 5363392, Revision D, Chain, Double Strand (also Figure 1 below) |
| 1002 |
| 2.1 |
| NAVSEA Tech Manual S9570-AC-MMA-020, Navy Standard Sliding Block with Slip Clutch (Aboard Ship). |
| 2.2 |
| NAVSEA Drawing. No. 5363358, (Rev. F) Sliding Block Assembly. |
| 2.3 |
| NAVSEA Drawing. No. 5363431, (Rev. L) Transfer Head Assembly. |
| 2.4 |
| NAVSEA Drawing No. 5363436, Arm, Stowage Trolley |
| 2.5 |
| NAVSEA Drawing. No. 5210545, Standard Painting Procedures for UNREP Equipment. |
| 1003 |
| 2.1 |
| IMECO INC DWG 22024-570-0103-1 FUEL CARGO DELIVERY KINGPOSTS FABRICATION DETAILS |
| 2.2 |
| IMECO INC DWG 22024-570-0202-3 SOLID CARGO DELIVERY KINGPOSTS FABRICATION DETAILS |
| 2.3 |
| NAVSEA DWG 5210545, Standard Painting Procedures for UNREP Equipment. |
| 1004 |
| 2.1 |
| NAVSEA Drawing 53711-100-8289440, T-AKE 8, NSTR upgrade station 6 - temporary shipping access motor control room -01 level.(DELETED) |
| 2.2 |
| NAVSEA Drawing 53711-180-8289441, T-AKE 8, NSTR UPGRADE STATION 6 - CONTROL BOOTH MODS 02 LEVEL(DELETED) |
| 2.3 |
| NAVSEA Drawing 53711-180-8289442, T-AKE 8, NSTR UPGRADE STATION 6 – FOUNDATION REMOVALS MOTOR CONTROL ROOM 01 LEVEL(DELETED) |
| 2.4 |
| NAVSEA Drawing 53711-180-8289443, T-AKE 8, NSTR UPGRADE STATION 6 – FOUNDATION INSTALLATION MOTOR CONTROL ROOM 01 LEVEL(DELETED) |
| 2.5 |
| NAVSEA Drawing 53711-302-8289444, T-AKE 8, NSTR UPGRADE STATION 6 – ELECTRICAL REMOVALS(DELETED) |
| 2.6 |
| NAVSEA Drawing 53711-302-8289445, T-AKE 8, NSTR UPGRADE STATION 6 – LIGHTING MODIFICATIONS(DELETED) |
| 2.7 |
| NAVSEA Drawing 53711-302-8289446, T-AKE 8, NSTR UPGRADE STATION 6 – DETAILED WIRING DIAGRAM(DELETED) |
| 2.8 |
| NAVSEA Drawing 53711-321-8289447, T-AKE 8, NSTR UPGRADE STATION 6 – CABLE ROUTING & PENETRATION MODS(DELETED) |
| 2.9 |
| NAVSEA Drawing 53711-445-8289448, T-AKE 8, NSTR UPGRADE STATION 6 – MOTOR CONTROL ROOM MODS 01 LVL(DELETED) |
| 2.10 |
| NAVSEA Drawing 53711-512-8289449, T-AKE 8, NSTR UPGRADE STATION 6 – MISC. HVAC MODIFICATIONS - 01 LEVEL FR 51.5 - 58 (P)(DELETED) |
| 2.11 |
| NAVSEA Drawing 53711-521-8289451, T-AKE 8, NSTR UPGRADE STATION 6 – WINCH CTRL & PUSH/PULL CABLE MODS, 01 - 02 LVL, (P) (DELETED) |
| 2.12 |
| NAVSEA Drawing 53711-180-8289452, T-AKE 8, NSTR UPGRADE STATION 6 – BACKING STRUCTURE INSTALLATION, 01 LEVEL(DELETED) |
| 2.13 |
| NAVSEA Drawing 53711-521-8289453, T-AKE 8, NSTR UPGRADE STATION 6 – TEST REQUIREMENTS(DELETED) |
| 2.14 |
| NAVSEA Drawing 53711-521-8289454, T-AKE 8, NSTR UPGRADE STATION 6 – SLIDING BLOCK DRIVE MOD DETAILS(DELETED) |
| 2.15 |
| NAVSEA Drawing 53711-521-8289455, T-AKE 8, NSTR UPGRADE STATION 6 – HIGHLINE WINCH MODS(DELETED) |
| 2.16 |
| NAVSEA Drawing 53711-521-8289456, T-AKE 8, NSTR UPGRADE STATION 6 – HAULING WINCH MODS(DELETED) |
| 2.17 |
| NAVSEA Drawing 53711-521-8289306, – NSTR RAM TENSIONER (DELETED) |