0902_B_Drydocking_and_Undocking_Vessel_Rev.doc

DOC document 44 KB Posted

Attached to
Extended: USNS WALLY SCHIRRA (T-AKE 8) Regular Overhaul and Dry Docking
Solicitation number
N3220519R6005
Issued by

About this file

WI 0902B

View the file

Other files

File Type Posted
AMENDMENT_0006_USNS_WALLY_SCHIRRA.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
AMENDMENT_0005_WALLY_SCHIRRA.docx DOCX document
0169_A_Hazmat_Containers_Replacement.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
0555_B_MMR_AFFF_System_Piping_Replaceme_Revision_I.doc DOC document
USNS_WALLY_SCHIRRA_CONTRACT_SOLICITATION_AMEND_0004_N32205-19-R-6005.docx DOCX document
USNS_WALLY_SCHIRRA_2019_ROH_DD_-_WI_Index,_5_JUN-18_AUG_19_Rev_C.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___3.docx DOCX document
0105_A_Misc._Weld_Repairs_Revision_I.doc DOC document
CONTRACT_SOLICITATION_AMENDMENT_P00003_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
0918_A_Freeboard_Cleaning_Painting_(Spot)_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___2.docx DOCX document
0406_A_NAVMACS_II_Upgrade_(T-ALT-16_454)_NEW.doc DOC document
0522_A__Steering_Gear_Scheduled_Maintenance_10_Year_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___1.docx DOCX document
USNS_WALLY_SCHIRRA_SOLICITATION_AMENDMENT_N32205-19-R-6005-0002.docx DOCX document
0903_A_Propeller_Shaft_and_Stern_Tube_Inspection_Rev._I.doc DOC document
01004_A_NSTR_Upgrade_Station_6_Rev_P4.docx DOCX document
J_-_2_Category_A_Items_2_Jan.xls XLS spreadsheet
8289300_Rev_X1_NSTR_Interface.pdf PDF
0606_A_Flght_Deck_non-skid_Renewal_REV_A.docx DOCX document
N3220519R6005.docx DOCX document
J-4_GFM.xlsx XLSX spreadsheet
CONTRACT_SOLICITATION_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
J-6_CDRL_Zip.zip ZIP file
USNS_WALLY_SCHIRRA_J-_ATTACHMENTS.zip ZIP file
J-14_Technical_NDA.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

900-DRYDOCKING AND UNDOCKING

N32205-19-R-6005

24 SEPTEMBER 2018

ITEM NO. 0902

Category "B"

N756/MSC/SAK

DRY DOCKING AND UNDOCKING VESSEL REV -

1.0 ABSTRACT:

1.1 Continue dry-docking ship past the scheduled Contract Completion Date.

2.0 REFERENCES:

2.1 Work Item 901, Dry-Docking and Undocking Vessel

3.0 ITEM LOCATION/DESCRIPTION:

3.1 In accordance with reference 2.1 (WI 901 Dry-Docking and Undocking Vessel)

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.

5.0 NOTES:

5.1 The Contractor and all Subcontractors, regardless of tier, must consult the General Technical Requirements (GTRs) to determine applicability to this work item. In performance of this work item, the Contractor and all Subcontractors, regardless of tier, must comply with the requirements of all applicable GTRs.

5.2 The Contractor and all Subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Submit a unit price per day and extended price for up to a maximum of five (5) days to continue all services in accordance with Work Item 901.

8.0 GENERAL REQUIREMENTS:

8.1 If this CAT B Work Item is invoked, the work requirements in this work item shall be finalized and/or completed as required for meeting scheduled milestones as outlined in Work Item 013 “Project Planning and Production Status Monitoring Reports”, paragraph 7.1.7 “Milestones”.

8.2 Offers must provide both a unit price and an extended total price for accomplishing the above paragraph 7 scope of work.

902 - 1