0522_A__Steering_Gear_Scheduled_Maintenance_10_Year_Rev_I.doc

DOC document 74 KB Posted

Attached to
Extended: USNS WALLY SCHIRRA (T-AKE 8) Regular Overhaul and Dry Docking
Solicitation number
N3220519R6005
Issued by

About this file

0522_A_ Steering Gear Scheduled Maintenance 10 Year Rev I

View the file

Other files

File Type Posted
AMENDMENT_0006_USNS_WALLY_SCHIRRA.docx DOCX document
0902_B_Drydocking_and_Undocking_Vessel_Rev.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
AMENDMENT_0005_WALLY_SCHIRRA.docx DOCX document
0169_A_Hazmat_Containers_Replacement.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
0555_B_MMR_AFFF_System_Piping_Replaceme_Revision_I.doc DOC document
USNS_WALLY_SCHIRRA_CONTRACT_SOLICITATION_AMEND_0004_N32205-19-R-6005.docx DOCX document
USNS_WALLY_SCHIRRA_2019_ROH_DD_-_WI_Index,_5_JUN-18_AUG_19_Rev_C.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___3.docx DOCX document
0105_A_Misc._Weld_Repairs_Revision_I.doc DOC document
CONTRACT_SOLICITATION_AMENDMENT_P00003_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
0918_A_Freeboard_Cleaning_Painting_(Spot)_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___2.docx DOCX document
0406_A_NAVMACS_II_Upgrade_(T-ALT-16_454)_NEW.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___1.docx DOCX document
USNS_WALLY_SCHIRRA_SOLICITATION_AMENDMENT_N32205-19-R-6005-0002.docx DOCX document
0903_A_Propeller_Shaft_and_Stern_Tube_Inspection_Rev._I.doc DOC document
01004_A_NSTR_Upgrade_Station_6_Rev_P4.docx DOCX document
J_-_2_Category_A_Items_2_Jan.xls XLS spreadsheet
8289300_Rev_X1_NSTR_Interface.pdf PDF
0606_A_Flght_Deck_non-skid_Renewal_REV_A.docx DOCX document
N3220519R6005.docx DOCX document
J-4_GFM.xlsx XLSX spreadsheet
CONTRACT_SOLICITATION_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
J-6_CDRL_Zip.zip ZIP file
USNS_WALLY_SCHIRRA_J-_ATTACHMENTS.zip ZIP file
J-14_Technical_NDA.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

500-Machinery, Auxiliary Systems

N32205-19-R-6005

24 SEPTEMBER 2018

ITEM NO: 0522

Category “A” MSC Norfolk/N756/SAK

STEERING GEAR SCHEDULED MAINTENANCE 10 YEAR REVISION I

1.0 ABSTRACT:

1.1 This work items describes the requirements to provide one Rolls-Royce Original Equipment Manufacturers (OEM) Representative to perform the Rotary Vane Steering Gear 7-10-year maintenance which requires replacing with new the upper and lower seals.

2.0 REFERENCES:

2.1 MSC T/M T9561-BR-MMC-010, STEERING GEAR, ROTARY VANE, MODEL RV 2150-3

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Location: Steering Gear Room 3-85-0

3.1.2 Quantity: One (1) Steering Gear Unit

3.2 Item Description/Manufacturer’s Data: Rolls-Royce Marine Rotary Vane Model RV-2150-3

3.2.1 Bill of Materials: (Contractor Supplied):

3.2.2 Contractor Provided Special Tools

Description
Rolls-Royce Part Number
QTY
High Pressure Oil Pumps with Gauges, minimum 1000 bar.
N/A
2
Dial Indicator, (calibrated)
N/A
1
Hydraulic Oil, 100mm/s at 40C
“No ANTI Friction additives allowed in Oil”
5 gal
Loctite Superglue 495
N/A
2 bottles

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment: None.

4.2 Government Furnished Material (GFM):

Description
Rolls-Royce Part Number
QTY
Internal seal kit
FBOP81290
1
Seal Kit
FBOP80675
1
Valves for seal pressure
FBO241601
6
Cover seal
FBO33034-8
1
O-rings for hydraulic nut
FBO45793-07
1
O-rings for hydraulic nut
FBO45793-08
1
Thrust bearing
FBO432648
1
Lower liner
FBO33301 FR
1
Upper liner
FBO33301 FR
1
Filter Cartridge
FBON34537
2

4.3 Government Furnished Services: None.

5.0

NOTES:

5.1 The Contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.

5.2 The Contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide Rolls-Royce Original Equipment Manufacturer (OEM) field service technicians certified to perform maintenance and repair on the Model RV-2150-3 Rotary Vane Steering Gear outfitted on the T-AKE Class Vessels.

7.2 Rolls-Royce field service technicians are to assist in the steering gear maintenance and provide technical oversight throughout the entire maintenance evolution. Rolls-Royce field service technician is required to be present at all times when work is being accomplished on the steering gear unit.

7.3 Prior to disassembly an operational test will be conducted in the presence of the Rolls-Royce OEM Technical Representative and the shipyard to document the as delivered condition of the steering unit and alignment of the Steering unit and synchro-servo repeater and feedback system, include in report Ref 2.1 Sect 3.1 Maintenance Reporting.

7.4 Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations. The shipyard will dispose of the oil under work item 023.

7.5 Remove all interference around the steering gear unit to allow unrestricted rigging access.

7.6 Remove all linkages to the rudder servo control and feedback system.

7.7 Secure the Rudder Stock at the underside of the vessel to ensure the rudder stock does not fall to the dock floor.

7.8 Disassemble the steering gear unit to include removal of the steering gear unit lid. Rigging pad-eyes are available in the overhead. Utilize reference 2.1 for disassembly.

7.9 Perform inspection and seal replacement in accordance with reference 2.1 and at the direction of the Rolls-Royce OEM Technical representative. ABS Surveyor and MSCREP will witness seal inspection and replacement.

7.10 Maintain cleanliness of the hydraulic system while the steering unit is open. The steering actuator and all associated piping will remain covered to prevent dirt, debris, and foreign material from contaminating the hydraulic system.

7.11 Temporarily disconnect the rotor form the rudder stock in accordance with reference 2.1 section 2 and remove from the housing.

7.12 Replace the thrust bearing, the upper and lower liners (Radial Bearings).

Note: All seals are supplied in correct lengths and must NOT be shortened. The correct way of inserting the gland seals is shown in Reference 2.1; Sect 4.1; Figure 2.

Note: Seals to be cut apart for inserting around the rudderstock and to be glued/bonded together utilize LOCTITE Superglue 495, See Reference 2.1; Sect 4.1; Figure 1.)

7.13 Grease/lubricate all new seals before assembly as shown in Ref 2.1.1 DWG 33637E.

7.14 Replace the internal seals, upper and lower gland seals, actuator seals, pressure valves, and cover seal.

7.15 Reconnect the rotor to the rudder stock as stated in reference 2.1 section 2.

7.16 ABS Surveyor and MSCREP along with the Rolls-Royce field service technician will inspect steering unit internals prior to final closeout.

7.17 Reassemble the steering gear unit lid and associated appendages in accordance with reference 2.1.

7.18 Reconnect all linkages to the rudder servo control and feedback system.

7.19 Fill the unit with new oil and vent. The vessel will provide the oil.

7.20 Provide the services of a certified SPERRY Marine Electronics Technical Representative to assist Rolls-Royce perform an operational test and groom of the synchro-servo system to verify that all rudder angle indicators located throughout the ship track with the mechanical indicator on the rudder unit.

7.21 Painting:

7.21.1 Clean, Prime, and Paint all disturbed surfaces to match surrounding surfaces

7.22 Perform Operational Test during Dock and Sea Trails. Rolls-Royce Field Service Representative will attend sea trials for underway testing of the rudder.

7.23 The Rolls-Royce OEM Technical Representative shall provide a detailed final service report detailing the as found condition, all work performed to include all parts replaced, calibration of the steering unit synchro-servo repeater and feedback system, and results of the dock and sea trial testing.

7.24 Manufacturer's Representative:

7.24.1 Rolls Royce Field Service Technician:

Rolls Royce Commercial Marine Inc.

1731 13th Ave SW

Seattle, WA 98134-1009 USA

Tel: 206.782.9190, Fax: 206.782.0176 7.24.2 SPERRY Electronics Filed Service Technician:

Bruce B. Begault U.S. Service Manager Northrop Grumman Systems Corporation Sperry Marine Tel: 757.312.8375 Email: bruce.begault@ngc.com

8.0 GENERAL REQUIREMENTS: None Additional

0522-4