N32205-19-R-6005_QUESTIONS_&_ANSWERS___2.docx

DOCX document 26 KB Posted

Attached to
Extended: USNS WALLY SCHIRRA (T-AKE 8) Regular Overhaul and Dry Docking
Solicitation number
N3220519R6005
Issued by

About this file

N32205-19-R-6005 QUESTIONS & ANSWERS # 2

View the file

Other files

File Type Posted
AMENDMENT_0006_USNS_WALLY_SCHIRRA.docx DOCX document
0902_B_Drydocking_and_Undocking_Vessel_Rev.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
AMENDMENT_0005_WALLY_SCHIRRA.docx DOCX document
0169_A_Hazmat_Containers_Replacement.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
0555_B_MMR_AFFF_System_Piping_Replaceme_Revision_I.doc DOC document
USNS_WALLY_SCHIRRA_CONTRACT_SOLICITATION_AMEND_0004_N32205-19-R-6005.docx DOCX document
USNS_WALLY_SCHIRRA_2019_ROH_DD_-_WI_Index,_5_JUN-18_AUG_19_Rev_C.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___3.docx DOCX document
0105_A_Misc._Weld_Repairs_Revision_I.doc DOC document
CONTRACT_SOLICITATION_AMENDMENT_P00003_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
0918_A_Freeboard_Cleaning_Painting_(Spot)_Rev_I.doc DOC document
0406_A_NAVMACS_II_Upgrade_(T-ALT-16_454)_NEW.doc DOC document
0522_A__Steering_Gear_Scheduled_Maintenance_10_Year_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___1.docx DOCX document
USNS_WALLY_SCHIRRA_SOLICITATION_AMENDMENT_N32205-19-R-6005-0002.docx DOCX document
0903_A_Propeller_Shaft_and_Stern_Tube_Inspection_Rev._I.doc DOC document
01004_A_NSTR_Upgrade_Station_6_Rev_P4.docx DOCX document
J_-_2_Category_A_Items_2_Jan.xls XLS spreadsheet
8289300_Rev_X1_NSTR_Interface.pdf PDF
0606_A_Flght_Deck_non-skid_Renewal_REV_A.docx DOCX document
N3220519R6005.docx DOCX document
J-4_GFM.xlsx XLSX spreadsheet
CONTRACT_SOLICITATION_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
J-6_CDRL_Zip.zip ZIP file
USNS_WALLY_SCHIRRA_J-_ATTACHMENTS.zip ZIP file
J-14_Technical_NDA.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-19-R-6005

QUESTIONS AND ANSWERS #2

The following are answers to questions received from potential offerors.

1. 3.1.1.7 Assumes 30% of the total area of 70,614 square feet to be taken down to bare metal.

7.3.2.1 Assumes 6,000 square feet to be taken down to bare metal.

Please advise if the total amount to be prepped to bare metal is 6,000 square feet or 21,184 square feet.

7.8.3.1.1 & 7.8.3.1.2 both require contractor to apply 1 coat of 240 to surfaces requiring reference 2.2 surface preparation requirements.

2.2 Enclosures: None.

ANSWER:

A.1 - The total amount to be prepped to bare is 21,184 square feet (spot blasting).

Paragraphs 7.8.3.1.1 & 7.8.3.1.2 should read as follows:

7.8.3.1.1One (1) coat of Amercoat 240, (Red Oxide) at 5-6 mils DFT to surfaces requiring reference 2.1.2 surface preparation requirements.
7.8.3.1.2One (1) coat of Amercoat 240, (Haze Gray) at 5-6 mils DFT to surfaces requiring reference 2.1.2 surface preparation requirements.

2. Please confirm SSPC-SP 10 or SSPC-SP 6 prep level for bare metal addressed in question 1.

7.8.5 Directs contractor to prep and paint both sides of welded ventilation screen louvers.

ANSWER: Areas to be brought down to Surface Preparation Standard, SSPC-SP10.

3. Please advise level of prep for welded louvers and if removable louvers and screens are to be addressed.

ANSWER: The ventilation louvers are not welded to the ship’s skin (they are removable Stainless Steel louvers) and they are not required to be prepped and painted on both sides. Contractor needs to protect louvers during the blasting evolution.