0105_A_Misc. Weld Repairs Revision I

View the file

Other files

File Type Posted
AMENDMENT_0006_USNS_WALLY_SCHIRRA.docx DOCX document
0902_B_Drydocking_and_Undocking_Vessel_Rev.doc DOC document
J_-_3_Category_B_Items.xls XLS spreadsheet
AMENDMENT_0005_WALLY_SCHIRRA.docx DOCX document
0169_A_Hazmat_Containers_Replacement.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
0555_B_MMR_AFFF_System_Piping_Replaceme_Revision_I.doc DOC document
USNS_WALLY_SCHIRRA_CONTRACT_SOLICITATION_AMEND_0004_N32205-19-R-6005.docx DOCX document
USNS_WALLY_SCHIRRA_2019_ROH_DD_-_WI_Index,_5_JUN-18_AUG_19_Rev_C.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___3.docx DOCX document
CONTRACT_SOLICITATION_AMENDMENT_P00003_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
0918_A_Freeboard_Cleaning_Painting_(Spot)_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___2.docx DOCX document
0406_A_NAVMACS_II_Upgrade_(T-ALT-16_454)_NEW.doc DOC document
0522_A__Steering_Gear_Scheduled_Maintenance_10_Year_Rev_I.doc DOC document
N32205-19-R-6005_QUESTIONS_&_ANSWERS___1.docx DOCX document
USNS_WALLY_SCHIRRA_SOLICITATION_AMENDMENT_N32205-19-R-6005-0002.docx DOCX document
0903_A_Propeller_Shaft_and_Stern_Tube_Inspection_Rev._I.doc DOC document
01004_A_NSTR_Upgrade_Station_6_Rev_P4.docx DOCX document
J_-_2_Category_A_Items_2_Jan.xls XLS spreadsheet
8289300_Rev_X1_NSTR_Interface.pdf PDF
0606_A_Flght_Deck_non-skid_Renewal_REV_A.docx DOCX document
N3220519R6005.docx DOCX document
J-4_GFM.xlsx XLSX spreadsheet
CONTRACT_SOLICITATION_FOR_USNS_WALLY_SCHIRRA_N32205-19-R-6005.docx DOCX document
J-6_CDRL_Zip.zip ZIP file
USNS_WALLY_SCHIRRA_J-_ATTACHMENTS.zip ZIP file
J-14_Technical_NDA.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

100-HULL STRUCTURE

N32205-19-R-6005

04 January 2019

ITEM NO: 0105

Category "A" MSC Norfolk/PM6/NMK

MISC. WELD REPAIRS REVISION I

1.0 ABSTRACT:

1.1 This work item describes the requirements of the Contractor to accomplish various repairs onboard that involve hot work/welding fabrications and grinding and preservation.

2.0 REFERENCES: None Additional

2.1 ENCLOSURES: Line Item No 5 The No 1 MPDE Governor cooling return line incorrectly returns to the No 2 L.O Cooler

3.0 ITEM LOCATION AND DESCRIPTION:

3.1 Location/Quantity/Enclosure:

3.1.1 Location: Various

3.1.2 Quantity: As per Bill of Materials in paragraph 3.2.2.

3.1.3 Enclosure: None.

3.2 Item Description/Manufacture’s Data:

3.2.1 Bill of Materials (CFM):

Item No.
Description
Location
Quantity
1
Vertical ladder removal and modification: The vertical ladders shall be sand blasted to SP-10 near white metal and Primed with Amercoat 240 oxide red at 5-6 mils, intermediate coat with Amercoat 240 buff at 5-6 mils, and top coated with Amershield haze gray at 3-4 mils

Locations Square foot Various 20 each Approximately 600 square feet

Thirty (30) ladders in Various Areas around the ship
Twenty (20) each square feet per vertical ladder
2
Stbd Side 03 Level install GFM provided drain.
Stbd Side 03 Level.
Stbd Side 03 Level install GFM provided drain
3
Stbd Side 02 Level Frame 77 install GFM provided drain.
Stbd Side 02 Level Frame.
Stbd Side 02 Level Frame 77 install GFM provided drain.
4
The No 1 MPDE Governor cooling return line incorrectly returns to the No 2 L.O Cooler. Requires to drain the system, due to these piping are connected to the main LTFW header.
No 1 MPDE and No 2 MPDE
Two (2)

3.2.2 Bill of Materials (Contractor Supplied): Contractor shall provide all tools; provide the exact quantities and additional material required.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES:

4.1 Paint shall be provided by Ships Force.

5.0 NOTES:

5.1 All welding shall be in accordance with ABS requirements for building and classing steel ships.

5.2 Contractor shall be responsible for removal and reinstallation of all interferences. This shall include insulation and lagging if any.

5.3 Contractor shall be responsible to provide Fire-watch safety.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Arrangements/Outfitting:

7.2 Contractor shall provide certified welders to perform weld repairs and modifications in various areas of the ship as designated by the MSC Representative.

7.2.1 Prior to welding, Contractor shall identify locations of weld repairs with the Chief Engineer and or the Port Engineer as described in paragraphs 3.1.1 and 3.2.2.

7.2.2 Contractor shall provide labor and miscellaneous materials, staging and all tools required.

7.2.3 Contractor shall protect all deck surfaces if found required.

7.3 Structural: None Additional

7.4 Mechanical/Fluid: None Additional.

7.5 Electrical: None Additional.

7.6 Electronics: None Additional.

7.7 Preparation of Drawings/Documents:

None.

7.8 Inspections and Testing:

7.8.1 Ships force shall assist as needed.

7.9 Painting, labeling and Markings:

7.9.1 Prime, Paint, and Lagging:

7.9.1.1 Paint shall be provided by Ships Force.

7.9.1.2 Apply one (1) coat of Amerlock 600 Clear sealer to surfaces required for final painting.

7.9.1.3 Apply one (1) coat of Amercoat 240 (Buff or Red) paint to surfaces required for final paint application. Surfaces should include newly fabricated.

7.9.1.4 Apply one (1) coat of Amercoat 240 (Haze Gray) paint to surfaces required for final paint application. Surfaces should include newly fabricated.

7.9.1.5 Apply Amershield, (Haze Gray) to surfaces required for final paint application. Surfaces should include newly fabricated sole plates as well as deck.

7.9.1.6 If any lagging was removed for interference shall be reinstalled and painted to match surrounding if any.

7.10 Marking: None Additional

7.11 Manufacturer’s Representative: None Additional.

8.0 GENERAL REQUIREMENTS: None Additional.

0105-1

Relocate this piping to this location image1.jpeg