19R3504_Atttach_B_Basic_Pricing_Data.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Shallow Draft Tanker Federal contract opportunity
Solicitation number
N32205-19-R-3504
Issued by
Department of the Navy Military Sealift Command

About this file

Basic Pricing Data Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Shallow Draft Tanker, newest first.
File Type Posted
MSDS_for_Fuel.pdf PDF
19R3504_Shallow_Draft_Tanker_Amend5.docx DOCX document
Proforma_amended_(amendment_5).docx DOCX document
19-R-3504_Q_&_A__3.docx DOCX document
19-R-3504_Q_&_A__2.docx DOCX document
19R3504_Attach_D_DD_Form_254_(amendment_4).pdf PDF
19R3504_Attach_L_Decon_Station_Drawing.pdf PDF
193504_Shallow_Draft_Tanker_Amendment_4.docx DOCX document
Proforma_amended_(amendment_4).docx DOCX document
19R3504_Attach_H_DOL_WD.txt TXT text file
193504_Shallow_Draft_Tanker_Amendment_3.docx DOCX document
Proforma_amended_(amendment_3).docx DOCX document
19R3504_Attach_P_Ship_Security.docx DOCX document
19-R-3504_Q_&_A.docx DOCX document
19R3504_Attach_H__(3)_MFOW_PAX_Wages_Oct_2017.xls XLS spreadsheet
19R3504_Attach_H__(4)Tanker_MMP_MOU.pdf PDF
19R3405_Attach_A_GFP.xlsx XLSX spreadsheet
19R3504_Attach_H__(1)_Tanker_SIUPD_MOU.pdf PDF
19R3504_Attach_H__(2)_SUP_PCS_--_PAX_2017.xlsx XLSX spreadsheet
19R3504_Attach_H__(5)_Tanker_MEBA_MOU.pdf PDF
193504_Shallow_Draft_Tanker_Amendment_2.docx DOCX document
19R3504_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
19R3504_Attach_E_PWS_.docx DOCX document
Proforma_amended.docx DOCX document
19R3504_Attach_N_Request_for_Clarification_Question.docx DOCX document
19R3504_Attach_D_Instructions.pdf PDF
19R3504_Attach_G_ATFP_CBRD_.docx DOCX document
Amendment_0001.docx DOCX document
19R3504_Attach_I_SF_LLL.pdf PDF
19R3504_Attach_F_Tech_Offer_Worksheet.XLSX XLSX spreadsheet
19R3504_Attach_E_PWS_.docx DOCX document
19R3504_Attach_C_Crew_Complement_.docx DOCX document
19R3504_Attach_D_DD_Form_254.PDF PDF
Proforma.docx DOCX document
19R3504_Attach_J_MECSP_Worksheet_.docx DOCX document
RFP_1449.docx DOCX document
19R3504_Attach_K_Specs_for_CBR-D_Decon_Station_.docx DOCX document
N32205-19-R-3504-0001.pdf PDF
Shallow_Draft_Tanker_Synopsis.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Pricing Data

Attachment B REV1Vessel:
Basic Pricing DataRFP: N32205-19-R-3504
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment B REV1Vessel:
Basic Pricing DataRFP: N32205-19-R-3504
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment B REV1Vessel:
Basic Pricing DataRFP: N32205-19-R-3504
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment B REV1Vessel:
Basic Pricing DataRFP: N32205-19-R-3504
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment B REV1Vessel:
Basic Pricing DataRFP: N32205-19-R-3504
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 334-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 334 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment B REV1Vessel:
Fuel Consumption DataRFP: N32205-19-R-3504

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
89Fuel Underway (laden)8509.5611.21$ 4,935,520.75(Fuel type for Box 89 is IFO-380)
Other Fuel Type (if necessary)0.00$ - 0
90Fuel Underway (ballast)4159611.21$ 2,282,869.35(Fuel type for Box 90 is IFO-380)
Other Fuel Type (if necessary)0.00$ - 0
92In-Port Loading3961.3971.12$ 499,932.58(Fuel type for Box 92a is MGO)
Other Fuel Type (if necessary)0.00$ - 0
92In-Port Discharging3171.5971.12$ 461,767.56(Fuel type for Box 92b is MGO)
Other Fuel Type (if necessary)0.00$ - 0
TOTAL:$ 8,180,090.24
Notes:1978
Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
MGO/MDO:(1) $971.12 per metric ton
IFO-180:(2) $616.70 per metric ton
IFO-380:(3) $611.21 per metric ton
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD$ 32,750.85366$ 11,986,811.10
OPTION 1$ 36,025.94365$ 13,149,468.10
OPTION 2$ 39,628.53365$ 14,464,413.45
OPTION 3$ 43,591.38365$ 15,910,853.70
OPTION 4$ 47,950.52334$ 16,015,473.68
FAR 52.217-8183
1978
TOTAL EVALUATED FUEL$ 8,180,090.24

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ 79,707,110.27

File details come from the government source that posted it.