19R3504_Attach_F_Tech_Offer_Worksheet.XLSX

XLSX spreadsheet 13 KB Posted

Attached to
Shallow Draft Tanker Federal contract opportunity
Solicitation number
N32205-19-R-3504
Issued by
Department of the Navy Military Sealift Command

About this file

Tech Offer Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Shallow Draft Tanker, newest first.
File Type Posted
19-R-3504_Q_&_A__3.docx DOCX document
MSDS_for_Fuel.pdf PDF
Proforma_amended_(amendment_5).docx DOCX document
19R3504_Shallow_Draft_Tanker_Amend5.docx DOCX document
19-R-3504_Q_&_A__2.docx DOCX document
193504_Shallow_Draft_Tanker_Amendment_4.docx DOCX document
Proforma_amended_(amendment_4).docx DOCX document
19R3504_Attach_D_DD_Form_254_(amendment_4).pdf PDF
19R3504_Attach_L_Decon_Station_Drawing.pdf PDF
193504_Shallow_Draft_Tanker_Amendment_3.docx DOCX document
Proforma_amended_(amendment_3).docx DOCX document
19R3504_Attach_H_DOL_WD.txt TXT text file
19R3504_Attach_H__(5)_Tanker_MEBA_MOU.pdf PDF
193504_Shallow_Draft_Tanker_Amendment_2.docx DOCX document
19R3504_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
19R3504_Attach_E_PWS_.docx DOCX document
Proforma_amended.docx DOCX document
19R3504_Attach_P_Ship_Security.docx DOCX document
19-R-3504_Q_&_A.docx DOCX document
19R3405_Attach_A_GFP.xlsx XLSX spreadsheet
19R3504_Attach_H__(1)_Tanker_SIUPD_MOU.pdf PDF
19R3504_Attach_H__(2)_SUP_PCS_--_PAX_2017.xlsx XLSX spreadsheet
19R3504_Attach_H__(3)_MFOW_PAX_Wages_Oct_2017.xls XLS spreadsheet
19R3504_Attach_H__(4)Tanker_MMP_MOU.pdf PDF
Proforma.docx DOCX document
19R3504_Attach_J_MECSP_Worksheet_.docx DOCX document
RFP_1449.docx DOCX document
19R3504_Attach_K_Specs_for_CBR-D_Decon_Station_.docx DOCX document
19R3504_Attach_N_Request_for_Clarification_Question.docx DOCX document
19R3504_Attach_D_Instructions.pdf PDF
19R3504_Attach_E_PWS_.docx DOCX document
19R3504_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
19R3504_Attach_C_Crew_Complement_.docx DOCX document
19R3504_Attach_D_DD_Form_254.PDF PDF
19R3504_Attach_G_ATFP_CBRD_.docx DOCX document
Amendment_0001.docx DOCX document
19R3504_Attach_I_SF_LLL.pdf PDF
N32205-19-R-3504-0001.pdf PDF
Shallow_Draft_Tanker_Synopsis.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 N32205-19-R-3504 Attachment F: TECHNICAL OFFER WORKSHEET Author: Author:

Let's make sure that the requirement listed in the column is what is actually stated in the PWS for that section. Please insure that all sections in the PWS are addressed in the Tech Eval worksheet that the Program deems important to evaluate.

PWS LOCATIONREQUIREMENTOFFEROR'S PROPOSAL (Box/Page #)
1.aTANKTIME Charter Boxes (excluding Boxes 13-18)
1.bAttachment F: Technical Evaluation Worksheet
1.cGeneral Arrangement Plan (ship's capacity and stowage plans)
1.dUSCG, ABS, IACS current certificates
1.eQMS certification
1.fOfferor's Warranty Statement to meet contract requirements
1.gOfferor's Warranty Statement to meet the classified requirement
1.hVessel's current Q-88
1.iVessel's recent SIRE report
1.jOfferor's Warranty Statement confirming acceptances by oil terminals
1.kOfferor's Warranty Statement confirming vessel's current acceptance
l.lVessel oil vetting
1.mVessel's Age
1.nVessel's LOA
1.oVessel's maximum manifold height
1.pVessel's maximum DWT
1.qOfferor's confirmation of vessel's double hull
1.rOfferor's confirmation of vessel's SBT

Author: Author:

1.sOfferor's confirmation of vessel's IGS
1.tVessel's current SMC
1.uVessel's current ISSC
1.vVessel's stowage plan loading 40,000 bbls of JP5, JP8, or F76
1.wVessel's stowage plan loading 33,000 bbls of JP5, JP8, or F76
1.xOfferor's confirmation vessel has cargo segregation capability
1.yVessel's boom lifting capacity
1.zVessel's rail at manifold height
1.aaOfferor's confirmation for vessel to machine wash tanks
1.bbOfferor's confirmation for vessel to perform cargo operations pier side
1.ccVessel's mooring lines
1.ddVessel's SOA
1.eeOfferor's warranty for vessel's laydays
1.ffOfferor's warranty for bunkers
1.ggOfferor's warranty for undecanted tank washing
1.hhOfferor's warranty for hot washing
1.iiOfferor's warranty for gas-free and ready for tank inspections
1.jjOfferor's warranty for copper free piping etc.
1.kkOfferor's warranty of vessel's heating coils and last pressure tested date
1.llVessel's cargo tanks coating
1.mmVessel's last three cargoes carried certificates of quality
1.nnOfferor's warranty of vessel's last three cargoes carried were FAME Free
1.ooOfferor's warranty of FAME Free cleaning (if necessary)
1.ppOfferor's warranty statement
1.qqOfferor's warranty statement
1.rrOfferor's warranty statement
1.ssOfferor's warranty statement
1.ttOfferor's warranty statement and DD254
1.uuOfferor's warranty statement and timeline for completion
1.vvOfferor's warranty statement
1.wwOfferor's warranty statement
1.xxOfferor's warranty statement
1.yyOfferor's warranty statement
SF 1449
Block 28General Requirements Acceptance Statement

File details come from the government source that posted it.