EXHIBIT_A_PAINT_SUPPLIES_AND_SERVICES_PRICE_TABLE_(Amendment).xlsx

XLSX spreadsheet 40 KB Posted

Attached to
MSC FLEET-WIDE PAINT PROGRAM
Solicitation number
N32205-19-R-0054
Issued by

View the file

Other files

File Type Posted
N3220519R0054_Amendment_Four.pdf PDF
Questions_and_Answers_(Amendment_4).pdf PDF
EXHIBIT_A_PAINT_SUPPLIES_AND_SERVICES_PRICE_TABLE_(Amendment_4).xlsx XLSX spreadsheet
ATTACHMENT_8_MSC_DBIDS_FORCE_PROTECTION_LIST_A3.pdf PDF
N3220519R0054__Amendment_Three.pdf PDF
ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT_Rev2.docx.pdf PDF
Questions_and_Answers_(Amendment_3).pdf PDF
ATTACHMENT_3_QASP.pdf PDF
ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT_rev1.pdf PDF
Questions_and_Answers_Amendment_Two.pdf PDF
N3220519R0054_Amendment_Two.pdf PDF
Amendment_One_Q&As.pdf PDF
N3220519R0054_Amendment_One.pdf PDF
EXHIBIT_A_PAINT_SUPPLIES_AND_SERVICES_PRICE_TABLE_(Amended).xlsx XLSX spreadsheet
ATTACHMENT_2_MSC_PAINT_APPROVAL_PROCEDURES_&_APPROVED_PRODUCTS.pdf PDF
ATTACHMENT_1_PAINT_PWS.pdf PDF
ATTACHMENT_6_TRAINING_OUTLINE.pdf PDF
ATTACHMENT_7_REQUEST_FOR_ESTIMATE.pdf PDF
ATTACHMENT_5_WORLDWIDE_SUPPORT_REQUIREMENT.pdf PDF
ATTACHMENT_10_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATTACHMENT_3_RESERVED.pdf PDF
ATTACHMENT_8_MSC_DBIDS_FORCE_PROTECTION_LIST.pdf PDF
ATTACHMENT_4_MSC_VESSEL_COATING_CHART.pdf PDF
EXHIBIT_A_PAINT_SUPPLIES_AND_SERVICES_PRICE_TABLE.xlsx XLSX spreadsheet
EXHIBIT_B_CONTRACT_DATA_REQUIREMENTS_LIST_(1-18).pdf PDF
N3220519R0054_RFP_Solicitation.pdf PDF
ATTACHMENT_9_REFERENCE_INFORMATION_SHEET.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Table

EXHIBIT A
Total% VolumeDFTQuantity or
Product Name/Unit ofEstimatedSolidtotalVolumeUnitTotal
Exhibit Line itemParagraphSystem/NomenclatureDescriptionIssueM2Per ASTM D2697mils(Liters)PricePrice
Antifouling/Underwater Hull
A0012.11.1High Turbulence AreasLTR20,500842017,353$0.00
A0022.11.2.1Anticorrosive 1st Coat for ablative AFLTR420,00087585,815$0.00
A0032.11.2.1Anticorrosive 2nd Coat for ablative AFLTR420,00087585,815$0.00
A0042.11.2.1Ablative Antifouling 1st CoatLTR170,00064547,217$0.00
A0052.11.2.1Ablative Antifouling 2nd CoatLTR235,00064565,271$0.00
A0062.11.2.3Tie Coat (if applicable)Not ApplicableLTR225,000030$0.00
A0072.11.2.2Anticorrosive 1st Coat for MILPRF/5yr AFLTR850,000875173,673$0.00
A0082.11.2.2Anticorrosive 2nd Coat for MILPRF/5yr AFLTR850,000875173,673$0.00
A0092.11.2.2MIL-PRF-24647 / 5 Year AF 1st CoatLTR850,000565269,814$0.00
A0102.11.2.2MIL-PRF-24647 / 5 Year AF 2nd CoatLTR850,000565269,814$0.00
A0112.11.2.2Tie Coat (if applicable)LTR225,000030$0.00
2.11.2.3Anticorrosive 1st Coat for Copper Free/5 yr AFLTR135,00080529,997$0.00
2.11.2.4Anticorrosive 1st Coat for Copper Free/5 yr AFLTR135,00080529,997$0.00
2.11.2.5MIL-PRF-24567 / 5 Year Copper Free AF 1st CoatLTR135,00058541,375$0.00
2.11.2.6MIL-PRF-24567 / 5 Year Copper Free AF 2nd CoatLTR135,00058541,375$0.00
2.11.2.7Tie Coat (if applicable)LTR135,000030$0.00
A0122.11.4Anticorrosive 1st Coat for Foul Release SystemLTR8560$0.00
A0132.11.4Tie Coat for Foul Release SystemLTR40,00079610,801$0.00
A0142.11.4Foul Release CoatingLTR40,00080610,666$0.00
40,000
A0152.11.3Underwater Hull and Marking PaintLTR5920$0.00
A0162.11.2.4U/W Hull Cold Weather SystemLTR45,0008759,194$0.00
SUBTOTAL310,0001,361,850$0.00
Compromised Surfaces (Cofferdams/Voids)
A0172.12Surface Tolerant EpoxyLTR100,00087520,432$0.00
SUBTOTAL20,432$0.00
Decks - Exterior
A0182.13.1Pedestrian Nonskid PrimerLTR330,00087567,426$0.00
A0192.13.1Pedestrian Nonskid Top CoatLTR225,0006810117,635$0.00
A0202.13.1Aggregate small size(16-30 wires per inch range)KGn/a2,500$0.00
A0212.13.1Aggregate larger size (35 to 100 wires per inch range)KGn/a2,500$0.00
A0222.13.2Helo Deck PrimerLTR675,000675179,086$0.00
A0232.13.2Helo Deck Non-SkidLTR765,0008230995,021$0.00
A0242.13.2Helo Deck Color ToppingLTR90,00056317,141$0.00
A0252.13.3Non Nonskid Inorganic ZincLTR150,00080319,998$0.00
A0262.13.3Non Nonskid Epoxy MidcoatLTR150,00087530,648$0.00
A0272.13.3Non Nonskid Epoxy TopcoatLTR150,00087530,648$0.00
A0282.13.4Membrane PrimerLTR27,5008755,619$0.00
A0292.13.4MembraneLTR75,000100125333,299$0.00
A0302.13.4Membrane NonskidLTR100,0001002071,104$0.00
A0312.13.5Non Nonskid Exterior Decks - Cold Weather PrimerLTR65,00087513,281$0.00
A0322.13.5Non Nonskid Exterior Decks - Cold Weather Top CoatLTR65,00087513,281$0.00
SUBTOTAL1,899,188$0.00
Exterior Freeboard and Topside
A0332.14.1Inorganic Zinc PrimerLTR85,00080311,332$0.00
A0342.14.1Epoxy MidcoatLTR2,500,000875510,804$0.00
A0352.14.1Polyurethane TopcoatLTR4,000,000733584,416$0.00
A0372.14.3Zinc Rich Epoxy PrimerLTR180,00077324,933$0.00
A0382.14.4Polysiloxane TopcoatLTR500,00090359,253$0.00
A0392.14.5Polyurethane Marking Paint (Exterior)LTR5,000733731$0.00
A0412.14.5Polysiloxane Marking Paint (Exterior)LTR5,0001003533$0.00
A0422.14.6Topside and Exterior Freeboard Cold Weather CoatingLTR255,00087552,102$0.00
A0432.14.1.1 & 2.14.4.1/5Tie Coat (if applicable)Not ApplicableLTR1,000,000030$0.00
SUBTOTAL1,244,103$0.00
Interior
A0442.15.1PrimerLTR200,00060223,701$0.00
A0452.15.2Fire Retardant Non-water BasedLTR700,000452110,606$0.00
A0462.15.3Fire Retardant Alkyd (Water based)LTR180,00045228,442$0.00
A0472.15.4General Purpose Interior and Marking Paint (Interior)LTR800,000452126,407$0.00
SUBTOTAL289,156$0.00
Miscellaneous
A0482.16.1Acid ResistingLTR5,0006451,389$0.00
A0492.16.2Heat ResistingLTR180,00055111,635$0.00
SUBTOTAL13,024$0.00
Tanks
A0502.17.1Ballast 1st CoatLTR885,000875180,825$0.00
A0512.17.1Ballast 2nd CoatLTR885,000875180,825$0.00
A0522.17.2Sanitary 1st CoatLTR50,00087510,216$0.00
A0532.17.2Sanitary 2nd CoatLTR50,00087510,216$0.00
A0542.17.3Cargo Petroleum 1st CoatLTR380,00087577,642$0.00
A0552.17.3Cargo Petroleum 2nd CoatLTR380,00087577,642$0.00
A0562.17.4Feedwater / Freshwater Ballast 1st CoatLTR15,0008753,065$0.00
A0572.17.4Feedwater / Freshwater Ballast 2nd CoatLTR15,0008753,065$0.00
A0582.17.5Potable Water / Cargo Water 1st CoatLTR55,00010059,777$0.00
A0592.17.5Potable Water / Cargo Water 2nd CoatLTR55,00010059,777$0.00
A0602.17.6Tank Coating Cold WeatherLTR250,00087551,080$0.00
SUBTOTAL614,129$0.00
A0612.19Solvents (enter applicable solvent for each type of paint listed above)
A0622.19.1Solvents of all typesLTRn/a43265$0.00
A0632.19.1LTRn/a121415$0.00
A0642.19.1LTRn/a10825$0.00
A0652.19.1LTRn/a2990$0.00
A0662.19.1LTRn/a1575$0.00
A0672.19.1LTRn/a720$0.00
A0682.19.1LTRn/a0$0.00
A0692.19.1LTRn/a0$0.00
A0702.19.1LTRn/a0$0.00
A0712.19.2Low Temperature SolventLTRn/a9500$0.00
A0722.19.2High Temperature SolventLTRn/a9500$0.00
SUBTOTAL199,790$0.00
Total Volume of Paint Requiring Solvents5,461,769
Products With DFTs Greater Than Those Listed Above
A073LTR00n/an/a
A074LTR00n/an/a
A075LTR00n/an/a
A076LTR00n/an/a

TOTAL VOLUME & COST OF PAINT: 5,707,000 $0.00

Additional Products
A0773.1Rust Penetrating SealerLTR750,000100253,328$0.00
A0783.2Surface Preparation Solution/CleanerLTRn/a12,000$0.00
SUBTOTAL$0.00

A079 5.0 Program Management Not Separately Priced EA 1 NSP

A080 5.3.3 Handbooks Not Separately Price EA 435 NSP

Engineering Support Services
A0816.2.8Training Shoreside, NorfolkEAn/a20$0.00
A0826.2.8Training Shoreside San DiegoEAn/a20$0.00
A0836.2.8Training Shoreside SingaporeEAn/a20$0.00
A0846.2.8Training Shoreside LaborDYn/a40$0.00
SUBTOTAL$0.00

A085 6.1 Phase-In Services Base Year Only EA 1 $0.00

Travel for Service Calls
A0866.2.1NORFOLK, VA (including Newport News, Williamsburg, Hampton Roads, Little Creek)xEAn/a140$0.00
A0876.2.1SINGAPORE, RSxEAn/a40$0.00
A0886.2.1CHARLESTON, SCxEAn/a35$0.00
A0896.2.1PHILADELPHIA, PAxEAn/a5$0.00
A0906.2.1SAN DIEGO, CAxEAn/a20$0.00
A0916.2.1GUAMxEAn/a25$0.00
A0926.2.1BOSTON, MAxEAn/a15$0.00
A0936.2.1LEONARDO, NJ (including Earle, Bayonne, Staten Island, NYC)xEAn/a15$0.00
A0946.2.1BALTIMORE, MDxEAn/a15$0.00
A0956.2.1PORTLAND, ORxEAn/a15$0.00
A0966.2.1SAN FRANCISCO, CA (including Alameda, Oakland)xEAn/a10$0.00
A0976.2.1PORT CANAVERAL, FLxEAn/a15$0.00
A0986.2.1PASCAGOULA, MS (including Mobile, Gulfport)xEAn/a10$0.00
A0996.2.1PEARL HARBOR, HI (including Pearl City, Honolulu)xEAn/a15$0.00
A1006.2.1JACKSONVILLE, FLxEAn/a15$0.00
A1016.2.1YOKOHAMA, JA (including Tokyo)xEAn/a5$0.00
A1026.2.1ULSAN, KO (including Busan, Pohang)xEAn/a5$0.00
A1036.2.1SASEBO, JAxEAn/a5$0.00
A1046.2.1TACOMA, WA (including Seattle, Olympia, Bremerton)xEAn/a15$0.00
A1056.2.1UNITED ARAB EMIRATES (including Dubai, Jebel Ali, Fujairah)xEAn/a15$0.00
A1066.2.1CORPUS CHRISTI, TXxEAn/a5$0.00
A1076.2.1GAETA, IT (including Naples)xEAn/a5$0.00
A1086.2.1ROTA, SPxEAn/a5$0.00
A1096.2.1JTR TRAVELFor Engineering ServicesEA1 LOTn/a$250,000.00
A1106.2.2Initial Service Call (without travel)EAn/a450$0.00
A1116.2.3Periodic Service Call (without travel)EAn/a30$0.00
A1126.2.4Engineering Problem Services (without travel)EAn/aI LOTn/a$100,000.00
A1136.2.5Paint Condition Survey Call (without travel)DYn/a50$0.00
A1146.2.6Paint/Chem AnalysisEAn/a50$0.00
SUBTOTAL$350,000.00
Technical Services Availability (including travel)
A1156.3.2Boston, MADY500$0.00
A1166.3.2Leonardo, NJ (including Earle, Bayonne, Staten Island, New York City)DY650$0.00
A1176.3.2Baltimore, MDDY150$0.00
A1186.3.2Philadelphia, PADY400$0.00
A1196.3.2Norfolk, VA (including Newport News, Williamsburg, Hampton Roads, Little Creek)DY1,800$0.00
A1206.3.2Charleston, SCDY1,825$0.00
A1216.3.2Pascagoula, MS (including Mobile, Gulfport)DY280$0.00
A1226.3.2Tacoma, WA (including Seattle, Olympia, Bremerton)DY380$0.00
A1236.3.2Portland, ORDY1,700$0.00
A1246.3.2San Francisco, CA (including Alameda, Oakland)DY600$0.00
A1256.3.2Long Beach, CADY25$0.00
A1266.3.2San Diego, CADY90$0.00
A1276.3.2Pearl Harbor, HI (including Pearl City, Honolulu)DY370$0.00
A1286.3.2Sasebo, JADY1,800$0.00
A1296.3.2Singapore, RSDY1,800$0.00
A1306.3.2Ulsan, Korea (including Busan, Pohang)DY300$0.00
A1316.3.2Guam, GuamDY600$0.00
A1326.3.2Subic Bay, PhilippinesDY300$0.00
A1336.3.2United Arab Emirates (including Dubai, Jebel Ali, Fujairah)DY700$0.00
A1346.3.2MediterraneanDY180$0.00
A1356.3.2Technical Service without per diem or travelDY50$0.00
Removal of Product
A1367.1.1Product Returned for RestockingLTRn/a250,000$0.00
A1377.1.2Handling Charges for US locationsLTRn/a350,000$0.00
A1387.1.2Handling Charges for International locationsLTRn/a150,000$0.00
Subtotal of Products for Removal750,000$0.00

SUBTOTAL $0.00

Transportation Charges (based ontotal estimated liters)
A13910.3.1ZONE 1 EAST COAST, USLTR0.25%$0.00
A14010.3.1BALTIMORE, MDLTR0.64%$0.00
A14110.3.1BOSTON, MALTR8.04%$0.00
A14210.3.1CHARLESTON, SCLTR13.25%$0.00
A14310.3.1JACKSONVILLE, FLLTR1.19%$0.00
A14410.3.1NORFOLK AREA, VALTR9.74%$0.00
A14510.3.1PORT CANAVERAL, FLLTR0.35%$0.00
A14610.3.1LEONARDO, NJLTR9.56%$0.00
A14710.3.1PHILADELPHIA, PALTR4.38%$0.00
A14810.3.1ZONE 2, GULF COAST, USLTR0.25%$0.00
A14910.3.1CORPUS CHRISTI, TXLTR0.26%$0.00
A15010.3.1PASCAGOULA, MSLTR4.01%$0.00
A15110.3.1ZONE 3, WEST COAST, USLTR0.25%$0.00
A15210.3.1SAN FRANCISCO, CALTR3.77%$0.00
A15310.3.1PORTLAND, ORLTR6.80%$0.00
A15410.3.1SAN DIEGO, CALTR3.12%$0.00
A15510.3.1TACOMA, WALTR2.41%$0.00
A15610.3.1PEARL HARBOR, HILTR0.75%$0.00
A15710.3.1LONG BEACH, CALTR0.20%$0.00
$0.00
A15810.3.1ZONE 4, CARIBBEAN ISLANDSLTR0.00%n/a

A159 10.3.1 ZONE 5, CENT/SO.AMER & MEX LTR 0.00% n/a

A160 10.3.1 ZONE 6, NORTHERN EUROPE LTR 0.01% $0.00

A16110.3.1ZONE 7, MEDITERRANEAN SEALTR0.27%$0.00
A16210.3.1GAETA, IT AND CATANIA, ITLTR0.51%$0.00
A16310.3.1ROTA, SPLTR0.39%$0.00
A16410.3.1GREECE AND CRETELTR0.33%$0.00
$0.00
A16510.3.1ZONE 8, EAST & WEST AFRICALTR0.00%n/a
A16610.3.1ZONE 9, MIDDLE EASTLTR0.40%$0.00
A16710.3.1UNITED ARAB EMIRATES, ALL PORTSLTR4.62%$0.00
A16810.3.1BAHRAINLTR0.41%$0.00
A16910.3.1ZONE 10, FAR EASTLTR0.40%$0.00
A17010.3.1YOKOHAMA/TOKYO/YOKOSUKALTR0.26%$0.00
A17110.3.1SASEBO, JALTR3.57%$0.00
A17210.3.1ULSAN, KOREALTR0.56%$0.00
A17310.3.1ZONE 11, SOUTHEAST ASIALTR0.50%$0.00
A17410.3.1SINGAPORELTR14.09%$0.00
A17510.3.1SUBIC BAY, PHILIPPINESLTR0.65%$0.00
$0.00
A17610.3.1ZONE 12, AUSTRALIA & N.Z.LTR0.01%$0.00
$0.00
A17710.3.1ZONE 13, GUAMLTR3.80%$0.00

SUBTOTAL LTR 100.00% $0.00

A17810.3.2Expedited Delivery Surcharge1 LOTn/a$50,000.00
A17910.3.2Special Delivery Surcharge1 LOTn/a$50,000.00
CLIN 0001Supplies/Products1 LOTn/a$0.00
CLIN 0002Services1 LOTn/a$350,000.00
CLIN 0003Contract Data Requirements ListNSPNSP
CLIN 0004Phase-in Services1 LOTn/a$0.00
CLIN 0005Phase-out Services1 LOTn/a
CLIN 0006Option to Increase Qty1 LOTn/a$6,000,000.00
CLIN 0007Option to Extend Services1 LOTn/a
TOTAL EVALUATED PRICE$6,450,000.00

Elements

1Antifouling/Underwater Hull$0.00
2Compromised Surfaces (Cofferdams/Voids)$0.00
3Decks - Exterior$0.00
4Exterior Freeboard and Topside$0.00
5Interior$0.00
6Miscellaneous$0.00
7Tanks$0.00
8Solvents (enter applicable solvent for each type of paint listed above)$0.00
9Total Volume and Cost of Paint
10Additional Products$0.00

11 Engineering Support Services $0.00

12 Phase-In Services see below

13Travel for Service Calls
14Initial Service Call (without travel)
15Periodic Service Call (without travel)
16Engineering Problem Services (without travel)
17Paint Condition Survey Call (without travel)
18Paint/Chem Analysis
Total$350,000.00
19Technical Services Availability
20Removal of Product
Total$0.00
21Transportation Charges (based on total estimated liters)$0.00
22Expedited Delivery Surcharge$50,000.00
23Special Delivery Surcharge$50,000.00
Supplies/Products$0.00
Services$350,000.00
Contract Data Requirements ListNSP
Phase-in Services
Phase-out Services
Option to Increase Qty$6,000,000.00
Option to Extend Services
Total Evaluated Price$6,450,000.00

File details come from the government source that posted it.